Loading...
HomeMy WebLinkAboutaward sheetAWARD SHEET UNDERGROUND STORAGE TANK REMOVAL SYSTEM SOURCE REMOVAL, ASSESSMENT AND MONITORING ACTIVITIES BID NO. 02-01•220 add 1 1A 16 Deacrintion Former Watson island Fuel & Fishing Supply Fuel Tanks Removal Fixed and Firm Costs for Baia Scone of Services"" Fixed and Firm Cast to perform scope of work requested In Tasks 1, 2, 3 & 4: EVANS ENVIRONMENTAL & OE08CIENCE9 14505 COMMERCE WAY, STE. 400 MIAMI LAKES, FL 33015 DADEIN0N-MINORITY UNIT PRICE WM,gly TOTAL COST $99,820.00 x 1 = $ 99,820.00 Fixed and Firm Cost to perform scope of work requested in Task 5: $ 3,083.00 per quarter x 4 = $ 12,332,00 (Note: for purposes of this bid, assume 4 querterly sampling events will be conducted over the course of (- year, following completion of the Source Removal Report and receipt of DERM'e comments) " Note: Project must be invoiced on a Time and Materials Beals — only for services rendered and Includes any dumping (tipping) and standing time. A detailed description of the labor rates and hours, equipment costs and subcontracted services will be required to support the invoices submitted for payment. The City will not accept mark•up costs In excess of 15% for subcontracted services, and will require a copy of all 2 j)nit Costati Iarvices Above and Beyond Base Scone of Servicing. 2A Unit rate to dispose of additional petroleum impacted rinse water: (above the 600 gallon limit in the Task 1) 26 2C 2D 2E 2F 2G 2H 21 2J 2K Unit rate to dispose of additional petroleum sludge: (above the 100 gallon limit in Task 1) Unit rate to dispose of additional FFP and/or petroleum -affected groundwater: (above the 6,000 gallon limit in the Task 2) Unit rate for vacuum truck and operator to skim excavation area: (above the 6,000 gallon/2 mobilizations limit In the Task 2) Unit rate to excavate, transport and dispose of petroleum -affected soils: (above the 1,000 ton limit In Task 2) Unit rate to provide clean limerock for backfllling activities: (above the 1,200 ton limit in Task 2) Unit rate to dispose of concrete: (above the 2 load limit in Task 1) Unit rate far Installation of shallow monitoring wells: (services must be performed and documented by licensed well drilling contractor) Unit rate for proper abandonment of monitoring wells: (services must be performed and documented by licensed well drilling contractor) $ 2.20 per gallon x 100 $ 0.38 per gallon x 1,000 $ 94 00 per hour x 4 $ 45.00 per ton x 200 $ 10.00 per ton x 200 $ 285.00 per load x 1 $ 465.00 per well x 2 $ 110.00 per well x 10 Unit rate for laboratory analysis of soil samples — V0AIPAHITPH: $ 175.00 per sample x (above the 10 sample limit in Task 2) Unit rate for laboratory analysis of groundwater samples — VOAJPAHITPH: $ 150.00 per sample x (above the 15 sample limit in Task 2, and four-8 samples/quarter limit in Task 5) 3 LABOR COSTSz 3A Labor - Professional Geologist or Professional Engineer 3B Labor - Field Geologist 3C Labor - Field Technician/Scientist 3D Labor - CADD Draftsperson Labor - Administrative Assistant 4 PROVISION FOR SPECIAL 1TEMSz 85.00 55.00 45.00 40.00 30.00 per hour per hour per hour per hour per hour Unit Price jf of Units*" Costs 0.36 per gallon x 500 $ 160.00 $ 220.00 $ 360.00 $ 376.00 $ 9,000.00 $ 2,000.00 $ 285.00 $ 930.00 $ 1,100,00 3 $ 525,00 3 $ 450.00 x 10 $ 850.00 x 20 $ 1,100.09 x 20 $ 900.00 x 8 $ 320.00 x 4 $ 120.00 Subtotal $ 18,716.00 "'Note: The number of units included In this portion of the bid were determined only for projection purposes In order to fairly costs. Actual units (ff any) will be determined by the City based on decisions made in the field No guarantee should be assumed with respect to arty work outside the base scope of services. PREPARED BY: TERRY BYRNES, CPPB 12/08103 7n a. D.tarminW Total Evaluation Cost $ 130,868.00