Loading...
HomeMy WebLinkAboutletter from CIPTag .a# 4atiau JORGE C. CANQ, P.E. Director June 11, 2002 Miami -Dade Water and Sewer Department 3575 South Le Jeune Road Coral Gables, Florida 33146 Mr. Philip Torres, P.E. RE: Agreement for Water and Sanitary Sewage Facility — ID No. 17967 Dear Mr, Torres: JOE ARR1OLA City Manager The purpose of this letter is to present an official request to your Department for the Addendum to the aforementioned Agreement to change the Point of Connection. This request is the follow up of our meeting with you on April 1, 2003. After consideration of different alternatives, the City has concluded that the more feasible and least environmental impact point is to connect to the existing 12" and/or 24" line on Rickenbacker Causeway. The location is shown as per the attached sheet D-17 of the Sewer Atlas provided by City Consultant and Engineer of Record Mr. George Perez (see attached letter dated April 1, 2003). As Part of our efforts to consider the impact in the area, we had a meeting with DERM on the site. Please find attached letter dated November 25, 2002 where "... DERM recommends that the ... sanitary sewer improvements be located in an area which would avoid wetland impacts all together... Additional, the cost of the project would be much less expensive because there would be no mitigation required." Also, the scope of work of the project does not include additional water services lines to be connected to existing mains and not water meters will be added. All existing water lines will remain. We appreciate the Department's attention to this matter and if there are additional questions please call me. Sincerely, il# 1./441C Jor C. Cano, P.E., Director Department��ffof Capital Improvements /07Jd75V/sv Enclosures: Letter dated April 1, 2003 and Letter dated November 25, 2002 cc: Sheet D-17 Juan 8. Ordofiez P.E., Chief of Construction Department of Capital Improvements Guy Forchion, Interim Director, Virginia Sandra Vega, Project Manager, Department Richard Johnson, AIA, Johnson Associates George L Perez, P.E., Leiter, Perez & Associates, Erica N. Wright, Law Department Management & Design, Key Park Trust of Capital Improvements Architects, Inc Inc DEPARTMENT OF CAPITAL IMPROVEMENTS 444 S.W. 2nd Avenue / Miami, FL 33130 / (305) 416-1280 / Fax: (305) 416-2153 Mailing Address: P.O. Box 330708 Miami, FL 33233-0708