The purpose of this letter is to present an official request to your Department for the Addendum
to the aforementioned Agreement to change the Point of Connection. This request is the follow up
of our meeting with you on April 1, 2003. After consideration of different alternatives, the City
has concluded that the more feasible and least environmental impact point is to connect to the
existing 12" and/or 24" line on Rickenbacker Causeway. The location is shown as per the
attached sheet D-17 of the Sewer Atlas provided by City Consultant and Engineer of Record Mr.
George Perez (see attached letter dated April 1, 2003). As Part of our efforts to consider the
impact in the area, we had a meeting with DERM on the site. Please find attached letter dated
November 25, 2002 where "... DERM recommends that the ... sanitary sewer improvements be
located in an area which would avoid wetland impacts all together... Additional, the cost of the
project would be much less expensive because there would be no mitigation required."
Also, the scope of work of the project does not include additional water services lines to be
connected to existing mains and not water meters will be added. All existing water lines will
remain.
We appreciate the Department's attention to this matter and if there are additional questions
please call me.
Sincerely,
il# 1./441C
Jor C. Cano, P.E., Director
Department��ffof Capital Improvements
/07Jd75V/sv
Enclosures: Letter dated April 1, 2003 and
Letter dated November 25, 2002
cc:
Sheet D-17
Juan 8. Ordofiez P.E., Chief of Construction
Department of Capital Improvements
Guy Forchion, Interim Director, Virginia
Sandra Vega, Project Manager, Department
Richard Johnson, AIA, Johnson Associates
George L Perez, P.E., Leiter, Perez & Associates,
Erica N. Wright, Law Department
Management
& Design,
Key Park Trust
of Capital Improvements
Architects, Inc
Inc
DEPARTMENT OF CAPITAL IMPROVEMENTS
444 S.W. 2nd Avenue / Miami, FL 33130 / (305) 416-1280 / Fax: (305) 416-2153
Mailing Address: P.O. Box 330708 Miami, FL 33233-0708