Loading...
HomeMy WebLinkAboutjustification memoCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Alicia Cuervo Schreiber Chief of Neighborhood Services Jorge C. Cano Director Capital Improvement Department DATE: December 11, 2003 FELE: B-3282A SUBJECT: Justification for additional Funds for B-3282A REFERENCES: Old Virginia Key Beach Park Renovations/Repair Phase I - Project, B-3282A ENCLOSURES: Bid Tabulation Form Letter of Acceptance The "Old Virginia Key Beach Park Renovations and Repair - Phase I Project, B-3282A" is a Homeland Defense Bond and Safe Neighborhood Parks Bond funded project. The construction contract was awarded to "Regosa Engineering, Inc." by Resolution No. 03-859 on July 23, 2003. This project is located on District No.2 On June 17, 2003, formal bids were received for this project, and the lowest and responsive and responsible bidder was TLMC Enterprises, Inc in the amount of $1,234,179 including the deductive items A, B, C and D. By the time of the award of contract, the project was partially funded, and the Deductive Items A thru D for a total amount of $126,000 were left out pending of identification of the proper funding. Under Section 18-52(h) of the City Code and Ordinance No.11087 of the 10% Local Vendor Preference Provisions and a Letter of Acceptance by Draguisa Gomero, president of Regosa Engineering, Inc, the contract was awarded for the amount $1,108,179.00. The contract amount covered Item 1 through 15 less deductive items A, B, C and D. Please see attached Bid Tabulation Form and Letter of Acceptance. The Carrousel Building, the Concession Building and the Large Bathhouse Building were the structures cover by the awarded contract. The Capital Improvements Department, Parks Department and Virginia Key Beach Park Trust combined efforts to come up with the existing shortfall. A request was made to the Office of Safe Neighborhood Parks to approve the use of available SNPB funds and cover the existing shortfall. The request was approved, and the additional $126,000 is now available to cover the 100% original scope of work. The cost breakdown for the deductive work that was not included in the original award of contract is as follow: Deduct A Tunnel Deduct B Dance Pavilion/New Pavilion #4 Deduct C Restroom Building #3 Deduct D Pavilions 1, 2 and 3 Total $39,000 $19,000 $50,000 $18,000 $126.000 The request of increase of contract for the amount of $126,000 is intended to provide and complete the 100% original scope of work for this project. •N JCC/JBO/SV/sv c-av