Loading...
HomeMy WebLinkAboutformal bidOLD VIRGINIA KEY BEACH PARKRENOVATIONS AND REPAIRS - FORMAL BID - Project Number. Project Manager Person who Construction B-3282A CIP Date: Received Time: Number. 331416 SANDRA VEGA at: 06.17.03 received the bids SANDRA VEGA & CECELIA WILSON City Clerk Estimate = $ $1,320,000.00 I0:00 A.I. BIDDER Tra(C ENTERPRISES, INC r REGOSA ENGlNEERINC, INC R&8 INDUSTRIAL CONT,INc DOZIER & DOZIER CONST, INC ADDRESS 3800 NW 22ND AVE MIAMI, FLORIDA 33142 46 NW 36TH MIAMI, FLORIDA 2020 NE 163RD STREET MIAMI, FLORIDA 33162 3932 NW 167TH STREET MIAMI, FLORIDA 33054 STREET 33127 BID BOND AMOUNT 3%-BB 5%-BB NO -BB NO -BB IRREGULARITIES B,L - B,D,K E,C MINORITY OWNED YES YES YES YES ITEM No. DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL BASESID,ITEMS MIMSLESs+bsnucrA.ecn S1,108,179.00 51,113,500.00 S1,064,000.00 S1,938,2.23.00 1 DIVISION 1 GENERAL REQUIREMENTS $97,290.00 $86,000.00 $75,000.00 $75,000.00 2 DIVISION 2 SITE WORK $69,309.00 $74,000.00 S100,000.00 $68,000.00 3 DIVISION 3 CONCRETE $70,725.00 $36,500.00 $50,000.00 $288,030.00 4 DIVISION 4 MASONRY $29,747.00 $20,500.00 $50,000.00 $134,080.00 5 DIVISION 5 METALS $31,478.00 $43,800.00 $250,000.00 $210,000.00 6 DIVISION 6 WOOD & PLASTICS 361,059.00 $37,500.00 $100,000.00 $184,625.00 7 DIVISION 7 THERMAL & MOISTURE PROTECTION $68,077-00 S98,500.00 $120,000.00 $150,020.00 8 DIVISION 8 DOORS AND WINDOWS S61,157.00 $128,000,00 $55,000.00 S164,308.00 9 DIVISION 9 FINISHES $87,078.00 S139,000.00 $100,000.00 _ $185,080.00 10 DIVISION 10 SPECIALTIES $70,599.00 $60,000.00\ :50,000.00 $112,080.00 11 DIVISION 11 EQUIPMENT INSTALLATION S13,800.00 $6,700.00 $35,000.00 $208,000.00 12 DIVISION 15 MECHANICAL $305,843.00 $240,000,00 S50,000.00 NOT PROVIDED 13 DIVISION 16 ELECTRICAL S114,022.00 SI05,000.00 $120,000.00 NOT PROVIDED 14 KITCHEN EQUIPMENT $39,000.00 $39,000.00 S39,000.00 $39,000.00 15 SPECIAL PROVISIONS $120,000.00 SI20,000.00 $120,000.00 - $120,000_00 NOT -PROVIDED DEDUCT A DELETION OF TUNNEL $39,000.00 S45,000.00 S75,000.00 - DEDUCTS DELETION DANCE PAVILION/NEW #4 PAVILION $19,000.00 $25,000.00 S25,000.00 :NOT PROVIDED DEDUCT C DELETION RISTROOM BLDG #3 $50,000.00 $16,000.00 $125,000.00 . NOT PROVIDED DEDUCT D DELETION PAVILIONS 1,2 AND 3 318,000.00 $35,000.00 $25,000.00 _NOT PROVIDED * IRREGULARITIES LEGEND A — No Power - of - Attorney B — No Affrdavit of Primary Office Location C -- Incorrect Summation of Base Bid Total D — Proposal Unsigned or Improperly Signed or no Corporate Seal E — Incomplete Extensions F — No Bid Proposal G — Improper Bid Bond H — No Certificate of Competency Number I — No First Source Hiring Compliance Statement J -- No Minority Compliance Statement K — No Duplicate Bid Proposal L — No Duplicate Bid Bond M — No City Otoupational License IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM REGOSA ENGINEERING, INC FOR THE TOTAL AMOUNT OF $1,108,179.00 IF THE ABOVE CONTRACTOR IS NOT THE LOWEST BIDDER, EXPLAIN: In the revised amount of S1,108,179.00 for the Total Bid under Section 18;52(h) of the City Code and Ordinate No.11087 of the 10% Local Vendor Preference Provision. better of acceptance by Draguisa Goarera, president of Regosa Engineering, Inc dated 270i, 2003 (see attached) 0,•, lam.