Loading...
HomeMy WebLinkAboutletterNovember 19, 2003 Maria E. Lopez, P.E. Project Manager City of Miami Department of Capital Improvements 444 SW 2nd Avenue Miami, Florida 33130 Re: 16 Terrace from SW 29 Ave. to SW 32 Ave. Civil Engineering Design Services Proposal Dear Ms. Lopez: As requested, I am pleased to provide you with this revised proposal for Professional Civil Engineering Services, concerning the above referenced project. The scope of work will consist of the following: • EK will submit written request for utility information (Record as -built, etc.) to the appropriate utility agencies, including obtaining available records from the City of Miami Department of Public Works. EK will review the utility data received, combine with the topographic survey and prepare the engineering base -drawings required for the engineering design. • EK will design and prepare the necessary construction documents for either Roadway Reconstruction and Drainage Improvements, technical specifications and a statement of probable construction cost estimate required within the project area. EK will provide the required deliverables to the City of Miami Department of Capital Improvements as required. • Ek will provide assistance to the City during the Bidding and Award of Contract. • Ek will provide Construction Administration Services which will include occasional site visits during the construction of the project. Note that this proposal assumed six (6) month of construction time. Should this time be extended, then additional funds will be required. EK Is excluding the following from this task order: • This proposal does not include inspection services during construction. • This proposal does not include hydraulic analysis, modifications or design of the existing storm ouffalls and associated secondary storm system, located upstream or downstream of the project limits. • This proposal does not include landscaping, irrigation, and street lighting plans. • In the event a permitting process fee or printing expenses are incurred, such expenses will be covered as reimbursable expenses. Maria Lopez November 19, 2003 Page 2 of 2 • This project does not include any overtime hours during construction. Should this be required, then additional funds will be required. • This proposal does not include any surveying during construction and/or field laboratory testing. Should this be required, then additional funds will be required. The total Lump Sum fee proposed for our basic services is $76,634.00. Should you have any questions, or need additional information, please call me. Sincerely, EDWARDS & KELCEY, INC. Luis A. Olivares, P.E. Vice President Attachments J:12004 Projects1040046.0041Proposal\MarlaLopez111903.doe