HomeMy WebLinkAboutexhibit 2- proposalPREPARED BY EDWARDS AND KELCEY, INC. FOR CRY OF P AM6
DATE: 19-Nov-03
PROJECT NAME: PAVEMENT CONDITION REHABILITATION
SW 1e TERRACE FROM SW 24 AVE. TO awn AVE.
ENGINEERING DESIGN SERVICES
FILE NAME: PROPOSAL
TASK
HOURS
NO.
DESCRIPTION
LEAD
DESIGN
CADD
TOTALS
ENGINEER
ENGINEER
TECHN.
560
i67
, i66
30% CONSTRUCTION DOCUMENTS
1 Confirm owner's requirements
2 Verify adherence to design guidelines
3 Verify "as built" conditions, as furnished by City of Miami Public
Works and surveyor; to field conditions.
4 Evaluate utility and survey Information
5 Prepare a soils Investigation plan
e Identify deficiencies in Information
7 Confirm/update site and utility requirements
8 Identify City of Miami requirements related to this project
a Identify bondaries conflicts on the existing drainage system from
existing data
it Produce drawing list for all disciplines
12 List specifications sections and provide preliminary Outline
Specifications to be used in Construction Documents
13 Expand upon schematic design items
14 Drainage deslgn,etudy and computer simulation of proposed
drainage areas
15 Complete idantlflcatlonheview of proposed deviations from
design guidelines. Obtain approvals
1e investigate and conform Rlgh-of-Way clearance requirements
17 prepare Outline of Construction Notes
18 Verify location of existing utilities conflicts, cannecllona, etc.
19 Prepare Tabulation of Driveways
20 Prepare Demolition plans identifying all items to be removed or to
remain within the existing Right -of -Way
21 Prepare preliminary site layout plan
22 Prepare preliminary grading and paving concept
23 Prepare preliminary drainage concepts
24 Prepare profile plans of existing drainage system
25 Prepare profile plans of existing utilities system
28 Prepare Preliminary MOT plans
27 Prepare statement of probable construction cost
26 Prepare documents for submittal to City of Miami
Total Hulas:
subtend:
Principal -Project Manager.
3
2
5
3
2
5
3
3
4
10
3
3
4
10
3
4
4
11
3
3
4
10
3
3
4
10
3
3
4
10
3
4
7
3
3
4
10
3
4
7
3
3
8
3
16
4
23
3
3
8
3
3
3
9
3
3
3
9
3
3
3
9
3
3
4
10
3
8
10
21
3
3
10
16
3
3
10
16
3
3
10
16
3
3
10
16
3
3
10
16
0
0
0
0
6
8
14
4
8
12
82
107
106
284
86,840
17,169
$8 776
119,604
9
12
12
$3,300
80% CONSTRUCTION DOCUMENTS
1 Incorporate review comments from 60% C.D.
2 Confirm conformance or identify variations torn design
development documents
3 Verify drainage design of proposed drainage areaa
4 Coordinate Preliminary Schedule/Phasing Plana
e Prepare "Engineering Construction Notes"
8 Review details of existing utilities conflicts, connections, etc.
7 Review sections showing dimensions, thickness and materials
e Review Layout Plan with specific dimensions
9 Review proposed drainage structural details and sections
Including miscellaneous items
10 Review final miscellaneous utility plans
11 Review profile plane of proposed and existing drainage structures
12 Review Demolition plans identifying all Items to be removed or to
remain within the existing Right -of -Way
13 Review drainage layout and top elevations
14 Review final plans and notes
1s Update statement of probable construction cost
1e Prepare documents for submittal to City of Miami
Total Hour*:
Subtotal:
P,Awlpal-Pro]w1 Mar ger.
TOTAL LABOR COST FOR THIS PHAS
3
10
10
23
3
6
9
8
20
3
31
3
6
3
12
3
6
3
12
3
8
3
12
3
6
3
12
3
8
9
3
0
10
19
3
8
8
17
3
8
8
17
3
8
8
17
3
8
8
15
3
6
6
15
4
8
12
4
8
12
86
118
71
244
$4,400
$7r906
53.906
i16 211
8
18
11
$3,1160
TOTAL LABOR COST FOR THIS PHASE: $19,671
Page 1 swl6terrev
100% CONSTRUCTION DOCUMENTS
1 Incorporate review comments from 9096 C.D. submittal
2 Incorporate comments from City of Miami, Public Works
3 Finalized technical specifications (Project Manual)
4 Finalized "Engineering Construction Notes"
5 Finalize plans ready for permitting and to be advertised
a Complete contract documents Incorporating review comments
ready for bidding and permitting
7 Submit to City of Miami Public Works Department
s Coordinate final update to the statement of probable construction
9 Submit complete contract documents, fully corrected with all prior
comments responded
Total Hoye:
Subtotal:
Principal -Mint Managec
a
a
10
22
a
6
10
22
6
a
10
22
a
a
10
22
8
6
10
22
6
a
10
22
6
a
12
e
a
12
8
8
12 _
54
a4
60
168
$4,320
*3,618
$3,300
=11,238
$2,620
e
e
9
BIDDING &
WARD OF CONTRACT
1 Pre -bid document coordination
2 Pre -bid meeting & notes
3 Addendum preparation and distribution
4 Site meeting & coordination
5 Bld distribution & coordination
Total Hours:
Subtotal:
PrinclpaMmiact Manager.
SUB -TOTAL LABOR COST FOR THIS PHASE:
TOTAL LABOR COST FOR THIS PHASE: $13,758
0
0
0
a
0
0
0
0
0
0
0
o
a
0
0
S0
t0
$0
$0
0
a
0
$0
CONSTR
CTION ADMINISTRATION
1 Pre -construction meeting & notes
2 Shop drawing submittal review
3 Construction scheduled site visits
4 Request for Information (RFI)
5 Monthly construction meeting
8 Punch list, warranty document, final review, construction
completion
Total Haar:
Subtotal:
P,kIoIpl.Proioct Manager.
SUB -TOTAL ABOR COST FOR THIS PHASE:
PROJECT SUMMARY
4
4
12
20
60
4
12
3
15
4
12
27
123
0
166
$2,160
$6,241
$0
$10,401
3
12
0
S1,600
1 111,901
TOTAL
►rnl lac
TOTAL
ALArI INT
30% CONSTRUCTION DOCUMENT$
294
322.504
909E CONSTRUCTION DOCUMENTS
244
$19,671
100% CONSTRUCTION DOCUMENTS
165
=13,788
BIDDING & AWARD OF CONTRACT
0
*0
CONSTRUCTION ADMINISTRATION
1e5
511,001
EDWARDS ANI? KELCEY, INC.
898,334
SURVEYING SERVICES (High Surveying, Inc.)
KM
GEOTECHNICAL ENGINEERING (HR Engineering)
i2,ao0
TOTAL AMOUNT THIS SERVICE ORDER:
Ex
Page 2 swl6terrev