Loading...
HomeMy WebLinkAboutestimated construction costS.W. 16 TERRACE ROAD RECONSTRUCTION PROJECT B-4698 ESTIMATED CONSTRUCTION COST ITEM DESCRIPTION CITY UNIT VALUE TREE REMOVAL 10 $100.00 NEW TREES 20 $400.00 LIMEROCK BASE COURSE, 8" THICK 7,000 $15.00 ASPHALTIC CONCRETE PAVEMENT SURFACE COURSE (1 1f2") 7,000 $10.00 DRAINAGE STRUCTURES 20 $2,000.00 DRAIN PIPES SYSTEM 1,500 $90.00 EXISTING UTILITY STRUCTURES TO BE ADJUSTED 10 $1,000.00 SIDEWALK CONCRETE (4" THICK) 6,000 $8.00 SIDEWALK CONCRETE (6" THICK) 7,000 $10.00 STANDARD OR DEPRESED CONCRETE CURB & GUTTER 4,068 $17.00 SODDING 8,000 $2.00 PREPARED BY MARIA E. LOPEZ, P.E. UNIT TOTAL VALUE EA. EA. PER SY PER SY EA. PER LF. EA. PER SF. PER SF. PER LF. PER SF. SUBTOTAL: $572,456.00 MOBILIZATION (10%) SPECIAL PROVIS.(10%) TOTAL: ssree.76