Introduction
Rosabella is a proposed 27-story multi -family high density residential development to be
located on an approximately 1.72+1-acre property along NE 4th Avenue, between NE 22nd
Street and NE 22nd Terrace, in the City of Miami, Miami -Dade County, Florida (see site
location map -Fig 1). The development consists of a total of 258 residential apartment units,
including 10 townhouse units and approximately 470 parking spaces enclosed within a 5-
story parking garage. Currently, a 4,200 s. f church exists on the southern end of the property.
As part of this project, the existing church will be demolished and reconstructed on the NW
comer of the property, along with an additional 11 parking spaces to serve the facility.
I. Drainage
Existing Drainage
Presently, there is no existing drainage system on -site.
Proposed Drainage System
The drainage system for the development will consist of a series of drainage wells. This
will allow the storm runoff to be fully contained and disposed of on site. The project will
be designed consistent with a 5-year design storm event, in accordance with Section D-4,
"Water Control", of Part 2 of the Miami -Dade County Public Works Manual.
It is anticipated that five (5) 24" drainage wells will provide sufficient capacity to dispose
of the design storm runoff contributed by the proposed development. Preliminary
drainage computations for the project areas are provided in Tables 2 and 3, which
includes the basis for design.
The final drainage design for the project should be in conformance with the requirements of
the Miami -Dade County DERM Water Control Section, Florida Department of
Environmental protection, and other local, State and federal regulatory agencies having
jurisdiction over the project.
Rosabella
Site Utility Study
Page 2
•
•
Figurel:
Site Location Map
NEI 251H
77 21T5 ST
,
7E 2 1- "---1 , f i I i
1 1 i
._.
2 ', Li r L i _,._,_
1--- ; ---
„ 1. --':-. N E 2 .7) P-- ID 51
1 }- I
N E: 2 .3 P, D s -r ,, .__..
_
•;.__:)! Ts: i i\ i r 2 2 N n -I F
._„______il
z : ..,.„-
..._, ...,
[ `1
.._., ,
N.F. 22ND SI I
! I
, I --1,:..-
, N r II 2 1 ':,
N11 i '--.1 ,
1 CL [
i
L 1 I
1
1
11 NE . 2 0 ' H 111 1 <1
!v 1:L `-' Z U "I`
1 \I
N L, 1 9H TL
_-_ - i
T-
N c 1 1915 S
NE 1 '.-1 H 57
71 2
2270
PROPOSED
PROJECT
Rosabella
Site Utility Study
Page 3
•
•
•
Table 2:
Phase I Drainage Calculations
Runoff Generation
Total Net Site Area 1.72 Acres
Impervious Area 0.10 Acres
Roof Area 1.13 Acres
Exterior Wall Area (1/3 NE corner of all wall areas)
25,259 sf = 0.58 Acres
Total Impervious Area 1.81 Acres
Pervious Area (green areas) 0.49 Acres
Total Contributing Drainage Area 2.30 Acres
Average Runoff Coefficient (C)
Impervious Site Area = 1.81 x (0.90) = 1.63
Pervious Site Area = 0.49 x (0.30) = 0.15
Average Runoff Coefficient (C) — (1.63 + 0.15) /2.30= 0.77
Design Sto1111
Time of Concentration
5 Year Return Frequency
10 min.
Rainfall Intensity (I) 6.10 inlhr
Peak Runoff (Q) = CIA = (0.77) (6.10) (2.30) = 10.80 efs
Assume each 24" diameter well flows at 750gpm / per ft of head = 12.50 gps = 1.67cfs
Peak Runoff / Flow per Well = 10.80 cfs / (Ave. 1.5 ft of head x 1.67 cfs) = 4.31 wells
Provide 5 - 24" Diameter Wells
Detention Tank
Design Criteria: 1.5 minute (90 sec) detention time per detention structure
Volume of Tank required for (10.80 cfs x 90 sec.) / 8 = 195 cubic ft / tank
Interior Tank Dimensions: h' (width) x 3' (height) x 12' (length) = 195cubic feet each
h - 5.42
Provide 1 tank for each well, of 195 c.f. volume each.
Rosabella
Site Utility Study
Page 4
•
II. Water Distribution System
The water mains owned and operated by the Miami -Dade Water and Sewer Department
(MDWASD) in the vicinity of the project are shown in the Table 5 below.
NE 22 Terr.
Table 5:
Existing Water Mains
Abutting North property line along
NE 22 Terr.
6" D.I
NE 22 St.
Abutting South property line along
NE 22 St.
8"D.I
NE 4'h Ave.
Abutting West property line along
NE 4`'' Ave
6" D.I
In accordance with County criteria, MDWASD may require the installation of a new 8-inch
ductile iron (D.I) watermain on NE 22 Street and NE 22 Terrace along the property frontage.
A request for a Water and Sewer Availability Letter should be submitted to MDWASD, to
determine the specific points of connection and other requirements.
A copy of the MDWASD water atlas sheet for the project area has been attached.
III. Sanitary Sewer Collection System
Table 6 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and
Sewer Department (MDWASD), within the vicinity of the project.
Rosabella
Site Utility Study
Page 5
•
•
•
NE 22 Terr.
NE 22 St.
Table 6:
Existing Sanitary Sewer Mains
Abutting North property line along
NE 22 Terr.
Abutting South property line along NE
22 St.
8" gravity main (terracotta
pipe)
72" interceptor main
10" gravity main
NE 4t Ave.
Abutting West property line along
NE 4th Ave
72" interceptor main
10" gravity main
A copy of the MDWASD Sewer Atlas sheet has been attached.
The proposed on -site sanitary sewer system for the property can be connected to the existing
10" gravity main along NE 22 St. A letter of availability and further coordination with
MDWASD is recommended to verify proposed sanitary sewer service connection points for
this project.
The flows from the existing MDWASD sanitary sewage mains on NE 22 Terrace, NE 22
Street and NE 4th Avenue are received by MDWASD Regional Pump Station #2, which is
located at 925 Biscayne Boulevard. Pump Station No. 2 is currently operating at an average
yearly NAPOT of 2.56 hours/day, approximately 30% of the maximum allowed by EPA, and
is presently not under any type of moratorium (see attached pump station report). It is not
anticipated that any improvements to the regional pumping and/or transmission systems will
be required to connect the proposed project.
The additional flows created by these projects have been determined and are shown in Table
7.
Rosabella
Site Utility Study Page 6
•
•
•
Table 7:
Water & Sewer Flow Generation
Church (existing - to
be demolished)
50 seats
3 gpd/seat
-150
Church (proposed)
50 seats 3 gpd/seat
150
Townhouse
10 units 250 gpd per unit
2,500
Apat tiiient
248 units 200 gpd per unit
49,600
Total Average Daily Flow (gpd)
52,100
IV. Solid Waste Generation
Solid waste generated by this project will be collected in standard on -site containers for
refuse and recyclables. Regular pick-up service will be provided either by private hauling
companies andior by the City of Miami Solid Waste Department, who will transport the
waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of
solid waste projected to be generated by the project are shown in Table 8.
Rosabella
Site Utility Study
Page 7
•
•
•
Table 8:
Solid Waste Generation
Church (existing -
to be demolished)
4,200 sf
0.007 lbslsflday -29.4
Church (proposed)
4,200 sf
0.007 lbs/sf/day 29.4
Townhouse
10 units
5lbs/unitlday 50
Apai talent
258 units
5lbs/unitlday 1,290
Total Solid Waste Generated (tons/day)
0.67
Rosabelia
Site Utility Study
Page 8
•
•
E-12,
Secs
•
W
fuOp ov
NE 23
NE22ST
NE 20 ST
10881
10856
NE 20 TER
4' a.
•
7516
1
8201
1
8484
1
•
e-tz.
120
as m
' NE ST
7910
(918' . NE 23 CT
• 9r
1 NE 23 ST��
7971 Proposed ?^o3ec* si` \i
1 NE 22 TER ���
7393
• 1
/NEZ25
188
2 NE22ST
Pump Station Monthly information
Station..30 -0002 Atlas Pg..E13
MIAMI DADE WATER & SEWER DEPARTMENT
Addr.,925 BISCAYNE BLVD
Sec -Township -Range 31-53-42
Oenr. ET clock.Y Telm.Y #Pumps. 5
mp Type.A Stn Class.M Speed.R Hrspwr.+
Res flow(gpd)
Plans.. 1,216,156
Plats.. 0
Extens. 0
Proj Napot
3.40 hrs
2.56 hrs
2.56 hrs
% Cap
34.00
25.60
25.60
Date
Mo.NAPOT Avg Daily
08/25/2003
07/25/2003
06/25/2003
05/27/2003
04/25/2003
03/27/2003
02/26/2003
GOLD/M
GOLD/D
GOLD/G
•
•
3.11
2.62
2.75
1.40
0.72
2.77
2.78
12.42
10.46
11.01
5.61
2.87
11.08
11.13
Flows
<Plan Review:
Moratorium..OF
Mnrat-nri iim (ffect.i ve since
/
Yearly NAPOT (hrs) 2.56
57,600,000
0.60
Stn Gross Capacity(gpd)..
Station Reduction Factor
Stn Net Cap Certif(gpd)
Stn Net Capacity(gpd)
Indicated Flows (gpd)
0
34,560,000
3,686,400
Rgd #
Fig Pmp
0.00 Y 5
0.00 Y 5
0.00 Y 5
0.00 Y
0.00 Y
0.00 Y 5
0.00 Y 5
Comments
Signature..LEALG Sign
Station I<m>provement GOLD/S <S>tation Inf
<D>ownstream Station
Codes & Cata<g>ories GOLD/T Sewer Cer<t>i
Date..03/17/2
orm. GOLD/U
GOLD/P
fication
003 13:52:24.01
<U>pstream Station
<P>ump Information
-*2003092512455.756*LEZCA`
ent. *
M Stat Station Station
R T rr Ct rn. r T�iz�mhpr
Proposed Number of gallons (gpd): 5000
K. A5RM+ 30 0002
AC 30 CD
AC 30 RS
IN 30 RS95APR
IN 30 RS94MAR
•
•
:t-***************************
Downstream
This is not an official docull
Current Delta
'm ( rs ) WT (Hy )
Projectec
Em !f-jrs)
stations ****************************-)
3.40 0.00 3.4J
1002.16 0.00 1002.1(
1002.08 0.00 1002.0€
1001.79 0.00 1001.7c
1001.93 0.00 1001.9: