Loading...
HomeMy WebLinkAboutAnalysisT, 49 • • Analysis for Major Use Special Permit for the Rosabella Project located at approximately 446 NE 22nd Terrace, 2221 NE 4th Avenue, 418 NE 22"d Terrace, 442 NE 22"d Terrace, 421 NE 22nd Street, 425 NE 22"d Street, and 447 NE 22"d Street. CASE NO. 2003-0054 Pursuant to Ordinance 11000, as amended, the Zoning Ordinance of the City of Miami, Florida, the subject proposal for the Rosabella Project has been reviewed to allow a Major Use Special Permit per Articles 5, 9, 13, and 17, for a 27 story residential building with 258 multi -family residential units, 5-story parking garage with 470 parking spaces, recreational amenities, and a place of worship, which totals 4,200 square feet of floor area, with 11 parking spaces. This Permit also includes the following requests: MUSP, as per Article 17 for development of 258 residential units. MUSP, as per Article 9, Section 914, a development bonus to permit a mixed use of 39,001 square feet of floor area x $6.67 = $ 260,136.67 by contribution to the Affordable Housing Trust Fund. MUSP, as per Article 5, Section 502, PUD districts; to increase the floor area by twenty percent, 31,200 square feet. CLASS II, as per Article 6, Section 620.3.1, for a construction fence within the SD-20 overlay district. CLASS II, as per Article 6, Section 620.3.1, for development of new construction within the SD-20 overlay district. CLASS II, as per Article 9, Section 927, to allow temporary off -site parking during construction. CLASS II, as per Article 6, Section 620.8, for approval of signage. CLASS II, request a waiver as per City of Miami Parking Guides and Standards for reduction of required backup space twenty-two feet. CLASS II, request a waiver as per City of Miami Parking Guides and Standards for reduction of required width for a two way drive. CLASS II, as per Article 9, Section 908.2, for access from a public street roadway width greater than twenty- five feet. CLASS I, as per Article 9, Section 925.3.8, to allow development/construction/rental signage. CLASS I, as per Article 9, Section 918.2, for parking and staging of construction during construction. CLASS I, as per Article 9, Section 918.2, for parking and staging of offsite parking for construction crews. • • • CLASS I, as per Article 9, Section 906,6, for active recreational facilities (including swimming pools). CLASS I, as per Section 915.2 for FAA clearance letter. CLASS 1, as per Article 9, Section 917.12, to allow valet parking for commercial and residential use. CLASS I, as per Article 9, Section 920.1, to allow a construction trailer and watchman's quarters, CLASS I, as per Article 9, Section 920.1, to allow a trailer for construction and other temporary office uses such as leasing and sales. CLASS I, as per Article 9, Section 906.9, to allow for a special event namely a ground breaking ceremony. REQUEST that the following MUSP conditions be required at the time of Temporary Certificate of Occupancy or Final Certificate of Occupancy instead of at the issuance of foundation permit: a. the requirement to record in the Public Records a Declaration of Covenants and Restrictions providing that the ownership, operation and maintenance of all common areas and facilities will be by the property owner or a mandatory property owner association; and b. the requirement to record in the Public Records a unity of title or covenant lieu of unity of title. Designation as a phased project, pursuant to Section 2502 of Zoning Ordinance 11000, as amended. Pursuant to Articles 5, 9, 13, and 17 of Zoning Ordinance 11000, approval of the requested Major Use Special Permit shall be considered sufficient for the subordinate permits requested and referenced above as well as any other special approvals required by the City which may be required to carry out the requested plans. In determining the appropriateness of the proposed project, the Planning and Zoning Department has referred this project to the Large Scale Development Committee (LSDC) and the Urban Development Review Board (UDRB) for additional input and recommendations; the following findings have been made: • It is found that the proposed development project will benefit the area by creating new housing opportunities in the Wynwood/Edgewater NET District, approximately one block from Biscayne Bay. • It is found that the subject property is located in an R-4 (Multifamily High Density Residential District) and in a SD-20 (Edgewater Overlay) in the Edgewater Terrace Subdivision. • • • • It is found that the project has convenient access to the Metro Mover system, located 1 Y2 miles (Omni Outer -Loop) south of the subject property, for efficient use of existing mass transit systems. • It is found that the project was reviewed by the Large Scale Development Committee and has been modified to address the expressed technical concerns raised at said Large Scale Development Committee meeting; • It is found that the proposed project was reviewed for design appropriateness by the Urban Development Review Board, which recommended approval with the condition that the north elevation will need further articulation work. The Planning and Zoning Department's review resulted in design modifications which were then recommended for approval to the Planning and Zoning Director. • It is found that with respect to all additional criteria as specified in Section 1305 of Zoning Ordinance 11000, the proposal has been reviewed and found to be adequate. Based on these findings, the Planning and Zoning Department is recommending approval of the requested Development Project with the following conditions: 1. Meet all applicable building codes, land development regulations, ordinances and other laws and pay all applicable fees due prior to the issuance of a building permit. 2. Pay contribution of $260,136.67 to the City of Miami Affordable Housing Trust Fund for 39,001 square feet of increased development. * (*this contribution is based on $6.67 per square foot of increased development and shall be adjusted to the coefficient in place at the time of payment.) 3. Allow the Miami Police Department to conduct a security survey, at the option of the Department, and to make recommendations concerning security measures and systems; further submit a report to the Department of Planning and Zoning, prior to commencement of construction, demonstrating how the Police Department recommendations, if any, have been incorporated into the PROJECT security and construction plans, or demonstrate to the Director of the Department of Planning and Zoning why such recommendations are impractical. 4. Obtain approval from, or provide a letter from the Department of Fire -Rescue indicating APPLICANT'S coordination with members of the Fire Plan Review Section at the Department of Fire -Rescue in the review of the scope of the PROJECT, owner responsibility, building development process and review procedures, as well as specific requirements for fire protection and life safety systems, exiting, vehicular access and water supply. • • • 4. Obtain approval from, or provide a letter of assurance from the Department of Solid Waste that the PROJECT has addressed ail concerns of the said Department prior to the obtainment of a shell permit. 5. Comply with the Minority Participation and Employment Plan (including a Contractor/Subcontractor Participation Plan) submitted to the City as part of the Application for Development Approval, with the understanding that the APPLICANT must use its best efforts to follow the provisions of the City's Minority/Women Business Affairs and Procurement Program as a guide. 6. Prior to the issuance of a shell permit, provide the City with an executed, recordable unity of title agreement for the subject property; said agreement shall be subject to the review and approval of the City Attorney's Office. 7. Provide the Department of Planning and Zoning with a temporary construction plan that includes the following: a temporary construction parking plan, with an enforcement policy; a construction noise management plan with an enforcement policy; and a maintenance plan for the temporary construction site; said plan shall be subject to the review and approval by the Department of Planning and Zoning prior to the issuance of any building permits and shall be enforced during construction activity. All construction activity shall remain in full compliance with the provisions of the submitted construction plan; failure to comply may lead to a suspension or revocation of this Major Use Special Permit. 8. In so far as this Major Use Special Permit includes the subordinate approval of a series of Class I Special Permits for which specific details have not yet been de- veloped or provided, the applicant shall provide the Department of Planning and Zoning with all subordinate Class I Special Permit plans and detailed require- ments for final review and approval of each one prior to the issuance of any of the subordinate approvals required in order to carry out any of the requested activities and/or improvements listed in this development order or captioned in the plans approved by it. 9. If the project is to be developed in phases, the Applicant shall submit an interim plan, including a landscape plan, which addresses design details for the land oc- cupying future phases of this Project in the event that the future phases are not de- veloped, said plan shall include a proposed timetable and shall be subject to re- view and approval by the Director of Planning and Zoning. 10. Pursuant to the UDRB's and the Planning and Zoning Department's reviews, the applicant will need additional articulation work on the north elevation, and will need to work with staff in regards to such.