Loading...
HomeMy WebLinkAboutSite Utility Study• COASTAL SYSTEMS TE R i:ATioNAL Development Evaluation Engineering Report RIVER PLACE DEVELOPMENT 615 S. W. 2' Avenue City of Miami, Miami -Dade County, Florida Prepared for: MIAMI RIVERFRONT PARTNERS, LLC, 515 N. Flagler Drive, Suite 100 West Palm Beach, FL 33401 By: COASTAL SYSTEMS INTERNATIONAL, INC. 464 South Dixie Highway • Coral Gables, Florida 33146 Tel: (305) 661-3655 • Fax: (305) 661-1914 State of Florida EB # 7087 • 10 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Authorization 1.2 Purpose 1.3 Site Location 1.4 Site Plan 2.0 CODE REQUIREMENTS AND DEMANDS 2.1 Potable Water 2.2 Sanitary Sewer 2.3 Stormwater Management 3.0 MAPS 3.1 Water Atlas Map 3.2 Sewer Atlas Map PAGE 1 1 2 3 3 3 4 5 • II • • 1.0 INTRODUCTION 1.1 Authorization Coastal Systems International, Inc. (Coastal Systems) was authorized by Miami River Front Partners, LLC (Developer) to evaluate the existing domestic water, sanitary and storm drainage system for the proposed River Place Development site. 1.2 Purpose The purpose of this Development Evaluation is to report the potential impacts as a result of the proposed River Place Development, which includes a residential complex of 455 units and office/retail and marina space for a total of 243,639 square feet. 1.3 Site Location The project site is located at 615 SW 2Avenue, on the south bank of the Miami River, east of 2'" Avenue in the City of Miami, Florida. This riverfront property measures 2.19 acres, which zoning is SD-7 current zoning (recently zoned). The property is currently being operated as a shipyard and marine terminal. ST d(, \> >. i` < S T TAM 1 !.4 Site Plan T z \aOU2y ±�? PARK £AGLER ST , ®T a2& OF E y » FRIENDSHIP CHOPN py y/A ;ST BISCAYNE BLVD \ Q\ • CODE REQUIREMENTS AND DEMANDS 2.0 CODE REQUIREMENTS AND DEMANDS 2.1 Potable Water The proposed site can be serviced by an existing 12-inch water main that is located on 7th Street. This 12-inch line should provide sufficient capacity to the site; an additional 108,343 gallons per day (gpd) will be required to meet the increased demand. 2.2 Sanitary Sewer The proposed site can be serviced by an existing 12-inch sanitary main that is located on 7th Street. There is also another 8-inch main that is located on 6th Street, which would be available to service the site. Daily Rate Gallonage for Water and Sewer: Proposed Usage a. 455 Apartments at 200 gpd 91,000 gpd b. 221,440 s.f. of Office and Retail at 10 gpd/100/s.f 22,144 gpd II. Existing Usage a. 47,210 s.f. of Office * at 10 gpd/100 s.f 4,721 gpd b. Two Large Boat Slips at 40 gpd 80 gpd The net total increase of water and sanitary drainage gallonage for the proposed site development is 108,343 gallons per day (gpd). • • • References: * Adjusted Square Feet, Miami -Dade County Property Appraiser **Miami -Dade County Average Daily Flow for Water and Sewage System 2.3 Stormwater Management The existing site covers 2.19 acres and is 100 percent impervious. The proposed site development will improve the quality of water that runs into the Miami River, the underground water source, and the City's environment. Presently, all existing pavement surfaces and possibly some existing direct outfalls have direct run-off into the Miami River. The proposed site development will correct and improve these conditions to prevent any direct run-off into the Miami River and provide pervious areas to be planted with sod and trees. The proposed storm water management system will be designed according to Best Management Practice and will be consistent with the Miami - Dade County Department of Environmental Resource Management, and South Florida Water Management guidelines and design criteria. Coastal Systems appreciates the opportunity to provide professional services to Miami Riverfront Partners, LLC. If you have any questions or need additional assistance, please do not hesitate to contact us. F:1Pxojert+22091 I n<03-O -O ) uciI i tic - Mi ni A..*a ,lt-aoc • • 3.1 Water Main Atlas Map S - @ C 1 .mot:.'! -'7i4 -. .sf J �r .....'F. - . F iter , rx Joe c-11 444- rf i`xrn 13, y ,,,, ,—.� seot 1- � _t ....... , � ? € 7 1 A 9 f tr - N. ST.._. ; ems' r f ''�-` POWER Jr 30, 1 v \ ,4 �� 4lG 7 3 te 5. _ L 'v 1 } P3tup'iL FIRE } ! G ! doer) .- - — fa7 e w _ l 1 r----- —� µ =1. 3�e 33 xr } ti ] ti ` ) �- 4 I ; ; , �s - i Y (� F i, g , 9 , 9 9 } Z 1 r € ,9127 jjIL 1 ' —I • ere F ! .31; i f�t js +rep .! IA ;T j S.W.s •�/\ s-\.f This Site 3.2 Sewer Main Atlas Map so •