Loading...
HomeMy WebLinkAboutexhibit 3- charts" etric Engineering, Inc. zaAO $.W. 136th 5traet, Suite 200 mem'. Florida 33789 (3O5)235-5098 PHASE 05: CONSTRUCTION SERVICES ENGINEERING ESTIMATE CITY OF MAIM DEPARTMENT N.E. 71st C.LP OF CAPElAL MIPROVEAENTS SEWERS 352216 STREET STORM Project No.: ACTIVITY Prkrelp.l Engineer Project Manager Profeeslon.l Engineer Ei*irr ' CAM Clerical Hours Cost For Activity Tschticien $135.00 $120.00 $100 00 $85.00 y 560.00 $40.00 nr.cnn„ tr„ction rowing , 4 4 $480.00 ruernel to rile n V 2 4 20 8 0 34 $2,820.00 ihnr drawing,' 4 32 36 $3,200.00 rwrIndkc observations and observation reports(') 2 68 0 70 $6,020.00 eubetenktel completion side visit & report 1 8 0 7 $630.00 rind altw vlait A report 1 6 0 7 $630.00 TOTAL MANHOURS 0 14 4 132 8 0 158 iilliiiiiiiiiilliiiiiliiiiiiiiiiii, $7 3,780 TOTAL_ SALARY COSTS $0.00 $1,680.00 $400.00 $11,220.002 5480.00 50.00 11Conunerrtei 'rwinrlir, Ohnervations: 17 week s.@ max 4 hrs per week = 68 hours TOTAL CONTRACT FEE COMPUTATION (Check Appro xiets Box) pq ad (3/27/03) Tat& sty &try Coats Subconsultarit Santee TOTA (F1I.d Fee Services) GRAND TOTAL(hourly rate Foe) $13,780.00 $0.00 ;13,750.00 . ;$1 j• p; }' - Revised by: JMM 6/25/2003 Prepared By: Julio M. Maratha flare: 03/27103 Iry �V- [ {YChi'__ •71,� s /ry��l.q R!y l�rt�• 'kr.444E. EXISTING FRENCH DRAIN EXISTING STORM DRAIN PIPE & INLETS EXISTING WATER LINE EXISTING SEWER LINE EXISTING CONTROL STRUCTURE PROP. GRAVITY WELLS 1. PROP.INLET 2. PROP. 30" RCP 3. PROP. CONTROL STRUCTURE 4. PROP. 36" RCP 5. PROP. STORM M.H. 6. PROP. 36" RCP OUTFALL -ALTERNATIVE # 5