HomeMy WebLinkAboutexhibit 1- letterCitg .af Y�xxai
JORGE C. CANO, F.E.
Director
8/27/2003
Mr. Jose 'Benny' Gonzalez, P.E.
Principal
METRIC ENGINEERING, INC.
13940 SW 136 Street, Suite 200
Miami, Florida 33186
Re: WORK ORDER AUTHORIZATION
N.E. 71gt Street Storm Sewer Protect, B-8690
Dear Mr. Gonzalez:
This work order is deemed to incorporate by reference the terms and conditions of that certain
Professional Services Agreement for General Engineering Services, dated May 13, 2002
between the City for Miami and Metric Engineering, Inc.
The undersigned will perform this work in compliance with the foregoing Agreement.
Additionally, this work has been authorized by City Commission Resolution No. 02-144 and the
terms of any enabling resolution are deemed as being incorporated by reference herein. The
undersigned will perform this work in compliance with any enabling resolution.
I. Scope of Services
The scope of services are detailed in Attachment 'A', Section B; attached hereto and made a part
hereof.
It, Time of Performance
The schedule for performance of the work is included in Attachment A', Exhibit 'C". The
completion date schedule shall be adjusted to reflect the date of the written notice to proceed.
111. Compensation
The work will be performed for a fee guaranteed not -to -exceed the sum of $ 75,000.00. The City
shall not be liable for any cost, fee, or expenditure above the amounts set forth in this section.
The above quoted fee includes an allowance for reimbursable expenses that comply with the
requirements of the Agreement. Any eligible reimbursable expenses shall conform to the
limitations of Florida Statue § 112.061.
1V. Sub -Consultants
Sub -consultants for performance of the work are:
For
For
Discipline
Land Surveying and Mapping
Services
Geo-technical ServiceE
Name of Sub -Consultant Firm
M. G. Vera, & Associates, Inc.
H. R. Engineering, Inc.
JOE ARRIOLA
City Manager
DEPARTMENT OF CAPITAL IMPROVEMENTS
444 S.W. 2 nr_. Avenuc:, Sih Floor / Miami, FL 3313C ; (305) 416-128C / Fay: (305) 41 G-2152
t ailing Acmes<_: P.C. Box 330708.M mi, FI. 33223-0711E
7�a- �
8/27/2003
WORK ORDER AUTHORIZATION
N.E. T1st Street Storm Sewer Project, B-6680
Page No. 2
Any changes to the Sub -Consultants used for this work shall require prior written approval from
the Director or the Project Manager, which approval shall not be un-reasonably withheld.
V. Funding
This scope of services will be funded by CIP No. 352216
VI. Attachments
1. Professional Services Agreement between Metric Engineering, Inc. and the City of
Miami dated May 13, 2002
2. Attachment "A'
Authorized by:
111NrilMiefgr
• e C. Cano
C.I.P. Director
wi
Date 91' 7 43
Date 'OW
APPROVED A • EGAL FM AND
CORREC SS:
A -J . (0 Vilao, City Attorney,
it/
JCCIJBOIJLLlTAIta
Acre • ed . • ved
14/Ar
Jo - Ben
M
onzal
c Engineering,
j
Date 047;3
z, P.E.
c.
Date �Z03
Witness
r �
i
INSURANCE REQUIREMENTAPPRC1VF6:
1
Dianne Ericson, Risk Managemerl[ Ad
inistrator