HomeMy WebLinkAboutcover memoCITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO :
FROM :
T.L- Honorable
City Co
riola, City Manager
DATE
SUBJECT:
REFERENCES:
CA.1
NM 14 aCe
Resolution Authorizing the
Execution of Work Order
For Professional Services
Agreement for "Avalon Storm
Sewer Project, Phase II, B-5685B".
ENCLOSURES:
FILE :
RECOMMENDATION
it is respectfully recommended that the City Commission adopt the attached Resolution
authorizing the City Manager to negotiate and execute, in a form attached to the City
Attorney, a Work Order Authorization with PBSJ for professional services not to exceed
$184,900 related to "Avalon Storm Sewer Project, Phase II, B-5685B".
BACKGROUND
The Department of Capital Improvements has analyzed the need to enter into an
agreement with a General Engineering consulting firm for the drainage system
modifications to serve a developed residential area, bounded by SW 22nd Street to the
north, South Dixie Highway (US1) to the south, SW 37th Avenue to the west and SW
32nd Avenue to the east. The scope consists of additional French drain systems, solid
piping, catch basins, manholes, in accordance with the Avalon Stormwater Drainage
System Conceptual Design Report (ASDSCDR) prepared for this area by PBSJ in
December of 2002. PBSJ was selected from the Department of Capital Improvements
pre -approved consultants list. Funds have been identified from CIP Account No.
352208.
FISCAL IMPACT
None
JA:A.„CC: J BO: CG: MAV: m av