Loading...
HomeMy WebLinkAboutSite Utility StudyVILLAGGIO MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY PREPARED FOR Grec/Luis Ltd. by: KIMLEY-HORN AND ASSOCIATES, INC. 420 LINCOLN ROAD, SUITE 353 MIAMI BEACH, FL 33139 JULY 2003 so Villaggio Site Utility Study Introduction .. ......... The Villaggio in the Grove is a proposed residential development located at 2740 SW 28t Tern and 2803 Cocoanut Ave within the Coconut Grove neighborhood in the City of Miami. The site consists of six (6) lots numbered 6-11, along Cocoanut Ave and two (2) lots numbered 6 & 7 along SW 28th Terr. (see attached location map). For the purpose of this report, the lots abutting Cocoanut Ave will be referred to as "Project A", while the lots abutting SW 28th Terr. will be called "Project B". Project A will contain twenty-eight (28) 3-story townhouses on 50,250 +/- S.F (1.15 acres). Project B will contain fifty-eight (58)1-story lofts on 16,750 +/- S .F (0.38 acres) of land. 118 parking spaces will be constructed to serve the overall 1.53 +1- acre development. I. Drainage Existing Drainage Presently, the site is completely vacant. There is no existing drainage system on -site. Proposed Drainage System The drainage system for the residential development will consist of a combination of drainage wells and exfiltration trench. This will allow the storm runoff to be fully contained and disposed of on site. The project will be designed consistent with a 5-year design storm event, in accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. It is anticipated that two (2) 24" drainage wells will provide sufficient capacity to dispose of the design stot in runoff contributed. by Proj ect B. Preliminary drainage computations for this project area are provided in Table 1, which includes the basis for design. The proposed stormwater management system for Project A will consist of approximately 96 L.F of French drain. This should provide adequate flood protection to retain the anticipated run-off during the design storm. Please refer to Table 2 (attached) for the drainage calculations for Project A. The final drainage design for the proj ect should be in conformance with the requirements of Villaggio Site Utility Study Paget the Miami -Dade County DERM Water Control Section, Florida Department of Environmental protection, and other local, State and federal regulatory agencies having jurisdiction over the project. Table 1: Drainage Calculations for Project B Runoff Generation Total Net Site Area Impervious Area Roof Area Exterior Wall Area (1/2 NE corner wall areas) (31' x 73') + (65' x 77') = 7268 sf Total Impervious Area Pervious Area (green areas) Total Contributing Drainage Area Average Runoff Coefficient (C) Impervious Site Area = 0.64 x (0.90) Pervious Site Area = 0.06 x (0.30) 0.38 Acres 0.32 Acres 0.15 Acres 0.17 Acres 0.64Acres 0.06 Acres 0.70 Acres = 0.576 = 0.018 Average Runoff Coefficient (C) — (0.576+0.018) /0.70 = 0.85 Design Stoiini Time of Concentration Rainfall Intensity (I) 5 Year Return Frequency 10 min. 6.10 inlhr Peak Runoff (Q) = CIA = (0.85) (6.10) (0.70) = 3.63 cfs Assume each 24" diameter well flows at 850 gpm / per ft of head = 14.17 gps = 1.89cfs Peak Runoff / Flow per Well = 3.63 cfs / (Ave. 1.5 ft of head x 1.89cfs) = 1.28 wells Provide 2 - 24" Diameter Wells Villaggio Site Utility Study Page 3 • Detention Tank Design Criteria: 1.5 minute (90 sec) detention time per detention structure Volume of Tank required for (3.63 cfs x 90 sec.)/2 = 163.4 cubic ft / tank Interior Tank Dimensions: h' (width) x 3' (height) x 12' (length) = 163.4 cubic feet each h = 4.53 Provide 1 tank for each well, of 216 c.f. volume each II. Water Distribution System The Miami -Dade Water and Sewer Department (MDWASD) owns and operates the following water mains in the vicinity of the project: Location SW 28th Terr. Cocoanut Ave Between Abutting North property line along SW 28th Terr. Abutting South property line along Cocoanut Ave Water Main(s) 12" D.I. and 4"D.I 6" D.I The existing 12" watermain on SW 28th Terr. may be used to provide service to the Project B. As per the Water & Sewer Agreement executed on June 30, 2003, Project A will require the installation of a watermain extension. This agreement requires the developer to connect to the existing eight (8) inch watermain located in Center Street north of West Trade Avenue, and install an eight (8) inch watermain easterly and westerly on Cocoanut Ave along the entire southern boundary of the property. The connections will consist of services for domestic use, fire protection and irrigation. A copy of the MDWASD water atlas sheet for the project area has been. attached. III. Sanitary Sewer Collection System The Miami -Dade Water and Sewer Department (MDWASD) owns and operates the following sanitary sewer mains in the vicinity of the project. Villaggio Site Utility Study Page 4 Location Between SW 28th Terr. Cocoanut Ave North of property along SW 28th Terr. Abutting South property line along Cocoanut Ave Sanitary Sewer Main(s) 10" gravity main 10" gravity main Based on the executed water and sewer agreement for Project A, the proposed sanitary sewer service connections will be made from the existing 10" gravity main on Coconut Ave. According to the MDWASD Sewer Atlas sheet, sanitary sewer service connections for Project B may be made from the existing 10" gravity main on SW 28th Terr_ A letter of availability and further coordination with MDWASD is recommended to verify proposed connection points for Project B. Both Project A and Project B flow into Pump Station 30-0009. At this time, it is not anticipated that a new sanitary sewer pump station will be required to serve this project because the receiving pump station is operating under capacity. (See attached pump station printout). The additional flows created by these projects have been determined and are shown in Table 3 below. Table 3: Additional Water & Sewer Flow Generation Type and Number of Units Gallonage (ppd1 Project A: 28 residential townhouse units 7,000 Project B: 58 residential loft units 11,600 Previous Flow: 6 residential homes and 4 duplexes 2,050 (Credit) Total Additional Flow: 16,550 Villaggio Site Utility Study Page 5 A copy of the DERM allocation letter for Project A has been attached TV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and.recyclables. Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated by the project are shown in Table 4, below. Table 4: Solid Waste Generation Type and Number of Units Lbs/day Tons/day 41b000 sq. ft/day Project A: 34,000 s.f. (townhouses) 1,360 0.68 Project A: 43,000 sf{lofts) 1,720 0.86 Total: 77,000 sf residential 3,080 1.54 Villaggio Site Utility Study Page 6 LOCATION MAP N.T.S S.W. 28th TERRACE COCOANUT AVENUE n � AERIAL MAP 1" = 200' PROJECT B PROJECT A Kimley-Horn and Assaci. ``s, Inc. 420 Lincoln Road Suite 353 Miami Beach, Florido 33139 Phone: 305-673-2025 Fax: 305-673-4882 VILLAGGIO fable 2: DRAINAGE CALCULATIONS & EXFILTRATION TRENCH DESIGN (t?roiec fk') DCS Consulting Engineers, Inc. 6401 $W 67 Avenue .. Suite 111. Miami, FL 33183 (305) 271-8300 PROJECT NAME: VILLAGIO APTS. DATE 25 Ma -Q3 Y DESIGN STORM FREQUENCY: 122 10 10 MINIMUM C.B. GRADE ELEVATION: 2 AVG. OCTOBER GROUNDWATER ELEVATION: AVG. YEARLY I-50i1EST GROUNDWATER ELEVATION: 3 'DESIGN CoNiJr0NS: 15 inchai PIPE t]t M.: TRENCH DEPTH: 15 feet TRENCH WIDTH: 3 feet DRAINAGE AREA CHARACTERISTICS: "c' factor G x A Areas Areas (af) Acreage 00 fi1 Roof 22,200.0 too Q. Pavement 13,950.0 0.3200.61 0.039 Green 8,600.0 0.15 0.20 Total 42,160.0 Total c x A 0.63 Total Acreage: 0.98 Design' K" Value : 2.3E-03 Total Volum _ Cumulative DAL Vat. Regalted for Stoapa Storage Vol. in Trencrie i"P (CAI)Runoff In Trerugtes sv m e V0 (Detention) Dafictt (Ac-ft per t (mlt�1.► 1�) � (Mtr) o.aq am o.Qa a.Qazas 5 300 0.828165 7.3 6.05 1.81369 E,158.28 am 0.00 0,00246 10 600 0.828168 8.6 5.47 3,270.55 12,3i6.56 0.000,011 0,00737 1 0.00 15 900 0.828185 6.1 5,05 4,546.64 18,474.54 0.00 0.00 0_o.O0982 20 1200 0,25168 5.6 4.64 5,565.29 24,633.12 0.00 0� 0.00 0.00982 00 26 1500 0.828168 5,25 4.35 5,521.62 30,791.40 0 0,0147328 0.00 0.00 0,04 30 1504 0,t32(i168 4.9 4.06 7,304.44 38,949.68 0.00 0.00 0.0Q 0_A284O 60 3600 0.828186 3.6 2.96 10,733.06 73,8A936 0.000 0.00 0.44419-4 00 5400 0,828168 2_75 2.28 12,298.30 110.849A5 0-�0.00 1.95 14,012.80 147,798.73 0.00 0.00 0.058920.059 120 900 0.826168 2 350-00 0.00 150 9000 a 82816t3 2 1.60 14,907.02 184,748.41 0.000 6 O.0-70718 osa39 0.0 180 10800 0.626186 1.75 1.45 i5,t35230.00 0 8 221,U98,06 0.00 0.00 0.00 144a t1.8 86400 28168 0,5 0.41 35 776.86 1,713,584.72 0.00 La Minimum length of trench required: 57.68 TOTAL TRENCH LENGTH PROVIDED = 86 LINEAR FEET v= Required volume for treatment {firer Inah): 428E+04 W= Trench design width (feet): 3.00 Ka Hydraulic conductivity (dslsf - fl of head). 2.308-03 H2= Depth to water table (feet): 9.20 Du-- Non -saturated trench depth (feet): 2-45 Dt:c Saturated trench depth (Seel): 4.50 TOTAL F. -42'FM 4622 15 63 / 461622 541 568 32 4622 2 4522 7 4622 6 STATION SW 23 TER 428 425 W 1e►IF AV 4622 i� 4415 1 4G33 15 542 37 395 259 tN4 x2UU.307 71U551544*DEARMII. * Tnis 15 UUU caii ..,.. emu. ent. * Delta Projec M Stat Station Station Current R Type Owner Number ET (Hrs) ET (Hrs) ET (H Proposed Number of gallons (gild): 3500 ****************************** OK B31L+ 30 0009 OK A52M+ 30 0001 IN 30 CD AC 30 RS IN 30 RS95APR IN 30 RS94MAR Downstream • Stations ************************** 6.33 0.01 E 5.84 0.00 E 1002.13 0.00 100; 1001.99 0.00 1001 1001.72 0.00 1001 1001.85 0.00 100` I 1 of 2 MIAMI-DADE COUNTY, FLORIDA I:I1II111111111I1111111111111111111I 11I 11111111f111111111111111111111111111i 1111111111111 2003042113083417 Issued Date: 21-APR-2003 Expiration Date: 20-JUL-2003 ENVIRONMENTAL RESOURCES MANAGEMENT WATER AND WASTEWATER DIVISION 33 S.W. 2nd AVENUE SUITE 500 MIAMI, FLORIDA 33130-1540 MR MICHAEL LUIS GREC/LUIS LTD 2761 WEST TRADE AVE MIAMI, FL 33133 Fax- (305) - Tel- 3054462929 RE: REVISED Sewer System Treatment and Transmission Capacity Recertifi Dear MR LUIS: The Dade County Department of Environmental. ResOurCeS Management (DERM) has received your application for recertification of a sewer service connection, previously approved on 6-JUN-2001, under number 2003042113083417, to serve the following project which is more specifically described in the attached project summary. Project Name: VILLAGIO IN THE GROVE Project Location: 2803 COCONUT AVE MIAMI Proposed Use: 28 TOWNHOMES (RECERT 12) Previous Flow (Credit): 2050 GPD Calculated Sewage Flow: 4950 GPD Sewer Utility: MIAMI DADE WATER & SEWER DEPARTMENT Receiving Pump Station: 30-0009 DERM has evaluated the request in accordance with the terms and conditions set forth in Paragraph 16 C of the First Partial Consent Decree (CASE NO. 93-1109 CIV-MORENO) between the United States of. America and Miami -Dade County. DERM hereby certifies that adequate treatment and transmission capacity, as herein defined, is available for the above described project. Furthermore, be advised that this approval does not constitute Departmental approval for the proposed project. Additional reviews and approval may be required from sections having jurisdiction over specific aspects of this project. Please be aware that this certification is subject to the terms and conditions set forth in the Sewer Service Connection Affidavit filed by the applicant, a copy of which is hereby attached. By copy of this certification we are advising the appropiate building official of our Department's determination. acre . 2 of 2 I I111I1 Illll lull Ill II11111 Ill1111I1I hill 111 11 lu ll 11I4l IIl1l 11l I1 Ill Il 1111I II1ll I11 I IIII 2003042113083417 Issued Date: 21-APR-2003 Expiration Date: 20-JUL-2003 Sincerely, John W. Renfrow, P.E. Director Department of Environmental Resources Management By: cam. Jose Lopez, P.E. Chief, Water & Wastewater Division Attachements (2) cc: Building Official (w/Attachments) Utility Official (w/Project Summary Attachment) Date: 04-22-2003 Page: Applicant's Name: MR MICHAEL LUIS Applicant's Address: 2761 WEST TRADE AVE DERM Number: 2003-0421-1308-3417 Project: VILLAGIO IN THE GROVE 2803 COCONUT AVE Proposed Use.: 2.8....TOWNHOMES (RECERT 12) Pump Station: 30 -0009 Allocated flows: 4950 (GPD) Projected NAPOT: 6.43 (HR) # Folio Lot Block Flow (GPD) 01-41.16-029-0070 6 1 4950