Loading...
HomeMy WebLinkAboutExhibit 1Exhibit 1 1. Provide revised site plan indicating the maneuvering paths for loading vehicles. 2. Provide a three-dimensional drawing or rendering of the proposal from a pedestrian view on Biscayne Boulevard showing the impact of the project and its effect on the boulevard. 3. Provide a revised site plan with dimensioned parking area indicating widths of all drive -aisles and parking stalls consistent with the City of Miami Off-street Parking Guides and Standards. 4. Provide revised plans detailing all signage and lighting for the project. 5. Provide revised plans showing enhanced materials or artistic/architectural treatment along the ground level of the building, in order to enhance the pedestrian experience. 6. Provide revised plans showing the Cafe on the Southwest corner with transparent views out to Biscayne Boulevard to activate the corner of the site and provide eyes on the street. 7. Provide large scale elevations of the ground level illustrating the effect of the building at the pedestrian level include materials and colors. 8. Provide revised plans showing details of the proposed treatment to the blank walls. 9. Provide revised landscape plan showing further development of the Level I plaza planting design beyond groundcover and grasses to incorporate mid level and taller vertical plant material that will provide and enhance human scale within the plaza. 10. Provide revised landscape plan showing additional shade trees along the Biscayne Boulevard back of sidewalk landscape areas and within the entry drive walkway (Parcel S-3) to create an alley shade planting and include showing further development of the planting design within Parcel S-3 to define differences between groundcover species, shrubs, and grasses. 11. Provide .revised landscape plan showing further development of the planting design along the north and south building perimeters to define differences between species and plant materials. 12. Provide revised landscape plan showing screen views into the parking area with vertical plantings behind gabion terraces, and provide planters or landscape terraces along the base of the Planetarium building corner. 13. The City should fulfill its obligation under this plan; specifically, allocating the requisite amount to this project before .any type of construction is undertaken by the Museum of Science.