HomeMy WebLinkAboutVirginia Key Master Plan PresentationVAIRGINIIA KEY MASTER PLAN
Virginia Key Master Plan
WfatewrOf Qrjt- Ad]vJjs ryi �+oa�fdJ
ATLANTIC OCEAN
" FISHER ISLAND.
i MIAMI BISCAYNE BAY
!WNW �'� ICKENBACKER
'
CAUSEWAY.
VIRINIA KEY
r
ATLANTIC OCEAN
PUBLIC CONSENSUS BUILDING
• STAKEHOLDER INTERVIEW
PROCESS,
January 18-22, 2007
• PUBLIC MEETING #1: SITE
INVENTORY AND ANALYSIS,
March 29, 2007
• PUBLIC MEETING #2: COMMUNITY
WORKSHOP AND CONSENSUS
BUILDING,
June 20, 2007
• PUBLIC MEETING #3: PRELIMINARY
MASTER PLANNING,
August 26, 2008
• PUBLIC MEETING #4: VIRGINIA KEY
MASTER PLAN,
May 20, 2009
• WATERFRONT ADVISORY BOARD, r
June 9, 2009"
• PLANNING ADVISORY BOARD,
June 17, 2009
• WATERFRONT ADVISORY BOARD,
September 28, 2009
tom"
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
BISCAYNE BAY
VIRGINIA KEY MASTER PLAN
JUNE 2009
BILL SADOWSKI CRITICAL
_ WILDLIFE AREA
PROPOSED NPS VISITOR-'
CENTER LOCATION
w ;
1 �
VIRGINIA KEY MASTER PLAN
PRESENTATION
FISHER
ISLAND
HISTORIC VIRGINIA KEY
BEACH PARK
(WRT MASTER PLAN)
BEAR CUT
NORRIS CUT
SHRIMPERS
LAGOON
ATLANTIC OCEAN
SEPTEMBER 28, 2009
VIRGINIA KEY MASTER PLAN
OCTOBER 2009
BISCAYNE BAY
BILL SADOWSKI CRITICAL
- WILDLIFE AREA
TO.MIAMI
NORRIS CUT
SHRIMPERS
LAGOON
FISHER
ISLAND
HISTORIC VIRGINIA KEY
BEACH PARK
(WRT MASTER PLAN)
BEAR CUT
ATLANTIC OCEAN
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
LAND USE SUMMARY
2% �
96%: Open Space
2%: Existing Structures
%: Proposed Structures
Of the 257 Acres being planned for Virginia Key,
approximately 200 Acres (77%) are currently unusable.
This includes the North Point and the Landfill which
are not accessible to the public.
® VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
MASTER PLAN IMPROVEMENT AREAS: 257.1
ACRES (25% OF TOTAL AREA)
LAND USE SUMMARY
21.4 AC
42.2 AC
� K
VIRGINIA KEY MASTER PLAN
PRESENTATION
60.3 AC
116.5 AC
1.1 AC
15.6 AC
SEPTEMBER 28, 2009
EXISTING STRUCTURE: 5 ACRES
(2% OF TOTAL IMPROVEMENTS AREA)
PROPOSED ADDITIONAL STRUCTURE: 6
ACRES
(2% OF TOTAL IMPROVEMENTS AREA)
LAND USE SUMMARY
21.4 AC
42.2 AC
� K
VIRGINIA KEY MASTER PLAN
PRESENTATION
60.3 AC
116.5 AC
1.1 AC
15.6 AC
SEPTEMBER 28, 2009
ACCESS AND CIRCULATION DIAGRAM
REFINEMENTS
1. Alternate Transit Connectors added
Future Water Taxi Stops
Island -wide Circulator (i.e. Public Tram)
DROP-OFF/PICK-UP AREAS FOR ISLAND -WIDE
CIRCULATOR (I.E. PUBLIC TRAM) SYSTEM
PRIMARY VEHICULAR CIRCULATION WITH BUS
M M = STOPS FOR METRO BUS (CONNECTS TO BRICKELL
METRORAIL STATION)
JJ JJJ JJJ SECONDARY VEHICULAR CIRCULATION
1 J -1
J
J
t
rJJJ yJ J.j J_J.J J.s-.J JJ.JI �=� .J rl
../ i l i! •.) Jam/
J � J
J !
J J J J J J J J J J J JJJJ JJJ JJJJ.J
r,r
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
REFINEMENTS
1.
PEDESTRIAN AND BIKING TRAILS
CIRCULATION DIAGRAM
Continuous pedestrian and bicycle trails added
with connections to and within all improvement
and existing areas (-9.25 miles in length)
PRIMARY PEDESTRIAN AND BICYCLE CIRCULATION
SECONDARY PEDESTRIAN AND BICYCLE CIRCULATION
�f UNDER -BRIDGE PEDESTRIAN CONNECTION
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
DEVELOPING CRITERIA FOR
SUSTAINABILITY
Unique opportunity for Irmo vation and design ideas promoting en vironmental, economical and sociopolitical
sustainability such as:
1. Structures should follow USGBC's LEED Criteria for
environmental sustainability standards
2. Use of Best Management Practices for stormwater
management
• permeable surfaces for trails, parking areas, and
roadways,
• bioswales/raingardens,
• green roofs and rain cisterns for runoff collection, etc)
3. Use of onsite renewable energy resources (i.e. wind, sun,
rain, etc)
4. Use of reclaimed water from Sewage Treatment Plant for
irrigation and other non -potable water needs
5. Conservation of ecologically -sensitive areas with some
opportunities for environmental education
6. Encouraging use of biking and pedestrian circulation
through extensive island -wide trails
7. Reuse of brownfields and landfill area for green
recreational opportunities
8. Use of environmentally -friendly products and practices for
maintenance of parks and recreation areas
Source
www.floridapavers.us/.images/LTLirfblockl.jI
Green techniques include use of permeable pavements,
green walls and roofs that reduce runoff and provide
onsite stormwater management.
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
BASIN AREA PROPERTIES
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
RICKENBACKER
MARINA
RUSTY
PELICAN
RESTAURANT
BASIN AREA PROPERTIES:
EXISTING CONDITIONS
DRY -STACK
BOAT STORAGE
MIAMI MARINE
STADIUM &
PARKING
MAST ACADEMY
MIAMI ROWING
CLUB AND SWIM
GYM
4 ♦�
�..
r
# y�J a .'4 y�!� �. sf�Y. 3�`Y.' y�9 �y� ...'.'�•3.� _ �• d e �'r,1�
F�':� �` �• 9�^,�Y1v. d'k 3,�, x.':... .,.b,.. `Y..4.� . �"x � � �'°'� ��Y �'Q_
h. ee... '.914t'•.; ' eEy ++,M�•, '�'�` �. ; _ !� a+,r :. w .. .Nw�je" _ � �
a
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
®
f PRESENTATION
BASIN AREA PROPERTIES
JUNE 2009
LI
rAl
- QPER�yjImNS x"4 i
L
O 1r jj yq� - APPROXIMATELY 750
V SSEL CAPACITY..
-'
RIGHTY7F WiN' LlKEy_��y
f 3 31'
LEGEND
1. Mooring field and renovated
City Marina (206 slips and 40
moorings)
2. Waterfront Promenade,
Harbor Master and Welcome
Center
3. Parking Garage (600 Spaces)
BISCAYNE BAY
BASIN
4. Drystack Boat Storage 7. Small-scale retail and
Facility ( -750 racks) restaurants
5. Parking Garage (200 8. Aquatic Center and Public
Spaces) Pool
6. Marine Stadium Entry Drive 9. Parking Garage (1,050
and Gardens spaces)
VIRGINIA KEY MASTER PLAN
PRESENTATION
MCY PUYf
SEPTEMBER 28, 2009
r
REFINEMENTS
BASIN AREA PROPERTIES
OCTOBER 2009
r i -a
� J
6 ,
rk
.fii•
9
Y - u i . � f u..a�•�. r..s�:r�...alcxso3� _
_ -
..-rc •4F[SlA"D1z}iJll.� •F 'moi:'""="�F�o'�4 ji'.`j54. "9T 3IS . �] Si71Leu �,W w..r a. _.,_. _ _
BISCAYNE BAY
1. Relocated wetslips and mooring field 3. Revised drystack building
outside of basin (215 wetslips; 40 footprint (- 750 racks) with
moorings; 2,200 LF of side -tie solar panels
dockage)
2. Reduced parking garages
VIRGINIA KEY MASTER PLAN
PRESENTATION
Marina Slip Mix
40 ft.
= 31 slips
50 ft.
= 86 slips
60 ft.
= 80 slips
70 ft.
= 18 slips
I
Drystack Mix
30 ft.
= 260 racks
35 ft.
= 310 racks
40 ft.
= 120 racks
45 ft.
= 60 racks
SEPTEMBER 28, 2009
BASIN AREA PROPERTIES
OCTOBER 2009
REFINEMENTS
1. Open Vista to Marine
Stadium
2. Reduced Parking Garage
Footprint
3. Green Public Space added
BASIN
j J �:� 3
4 ,�. 1 Wmu ,••-r,r�vx
i
yam- x
Ck ME �L C1Y�iR u . �
BISCAYNE BAY
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
BASIN AREA PROPERTIES
OCTOBER 2009
77 7
3 t
'
411;.
- -
Ak
r
r. BISCAYNE BAY
R..
REFINEMENTS
Open Vista to Marine
Stadium
2. Reduced Parking Garage
Footprint
3. Green Public Space added
4. Future Marine Stadium
Village and Supporting
Facilities
VIRGINIA KEY MASTER PLAN
PRESENTATION
f
SEPTEMBER 28, 2009
r�P
- 1t
_ 0�y11-0._.� 1111
REFINEMENTS
1. Relocated wetslips and mooring field
outside of basin (215 wetslips; 40
moorings; 2,200 LF of side -tie
dockage)
2. Reduced parking garages; green
roofs to be incorporated on parking
structures
BASIN AREA PROPERTIES
OCTOBER 2009
BISCAYNE BAY
3. Revised drystack building
footprint (- 750 racks) with
solar panels
4. Open Vista to Marine
Stadium
5. Consolidated and Reduced
Marine Stadium Village
footprint area
VIRGINIA KEY MASTER PLAN
PRESENTATION
N i�
6. Structured parking reduced
7. MRC (Miami Rowing Club and
Swim Gym) to remain as existing;
Aquatic Center and Public Pool
removed
8. Green public space added
RUM
SEPTEMBER 28, 2009
ALTERNATIVES EXPLORED FOR PUBLIC BOAT RAMP ON
VIRGINIA KEY
ADJACENT TO SEWAGE TREATMENT PLANT
CONSIDERATIONS
1. Consultant team made recommendations for this
location along with potential mitigation and further
study that may be required
2. Concerns voiced by environmental permitting
agencies
RICKENBACKER SWALE AREA (ADJACENT TO DRYSTACK FACILITY)
CONSIDERATIONS
1. Located within Rickenbacker ROW swale area and Miami -Dade
County jurisdiction lands
2. Increase in boat traffic within Basin waters
3. Increase in roadway congestion on Rickenbacker Causeway
4. Views to Key and to Marine Stadium are compromised
5. Trailer parking removes opportunities for landscape buffer and
increases pavement area
6. Boat Ramp access negatively impacts drystack operations
7. Current leased properties
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
ALTERNATIVES EXPLORED FOR PUBLIC BOAT RAMP
WITHIN THE REGION
(NEED TO BE STUDIED IN GREATER DETAIL BY MIAMI-DADE COUNTY)
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
LqPRESENTATION
ACTIVE RECREATION PARK
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
BILL SADOWSKI CRITICAL WILDLIFE
AREA
NORTII 9��5V 1IXY ]pY ]Oh
ACTIVE RECREATION PARK
EXISTING CONDITIONS
MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT
LANDFILL
AL qv
Jirj
ARIHUR J. LAMB ROAD
VIRGINIA KEY HISTORIC BEACH PARK
VIRGINIA KEY MASTER PLAN
PRESENTATION
r SSt Ys•. .,
SEPTEMBER 28, 2009
LEGEND
(* Please note that the plan depicts a
long-term potential site carrying capacity.)
1. Baseball Fields
2. Softball Fields
3. Batting Cages
4. Soccer Fields
5. Tennis Courts
6. Competition Stadium, Track
and Field, and Football
7. Active Recreation and
Wellness Campus and
Dormitories
8. Central Green
9. Open Meadow
10. Parking Garages
E G MAI&iROVE
AREA
ACTIVE RECREATION PARK
JUNE 2009
MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT..jr� 411
'
; 1
o'
C A
1114
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
N PRESENTATION
rlj
40
j#
�9.
rlj
ACTIVE RECREATION PARK
OCTOBER 2009
- J
M'J'v l +„• �,
,1 r
,3i y i7 . •�ti. �-
t
'i
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
ACTIVE RECREATION PARK
OCTOBER 2009
aw
�" ��. F� � & ¢' � � � -lam �� d ._".>♦' 3i[.�_a M - •
Y y
tip }
s. a i, _{ ,
kl J
" ■F ..}.- a S tea. ti � .. ..
,ems �J •.irk✓ scr _ _ f,..
,,,Y .Jral-.F'�'J"°�'�k.Rti•.M-.�i�r�i°ti.Yir�..aY � - i r,..��•�� � !rte f
J t .l,R '�r ,7 ,�.� +r ��lf. +r. J.r {.,+s.+.wr�— ,►�.✓�-+-•.l : J 1...�-+ ..
!J]111,✓ifJ»'J/1..d.I-J.t w�fJl+*..ni 11.�J.J hJ ..J �...s,ti -._.. ldhdy� � J_...•.
}' a4 ' i•, A-�t.�'-a,..J.r�.v_��� �.�1}w .�_ ��•... d'1J1�"l e
�`t4A i`•
5 f
..LLL
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
ACTIVE RECREATION PARK
OCTOBER 2009
J rJ
rr
:1,' ..r y . '..'"'a r+,.a ., �,��,,,, j - �.`J J :—•-`..+._Jd'i { }
,r 1
# IF
! • + J i :rw.aYs.�6'J.+J.Y�� .r .JJ,� a`1. IIV I i L;.-
�-
40
Im
x { ,
!y.-44•J+•4+F}�L.�r.."��,y,�+.1 M1rr J,-i,J�4-fw.:�3 ..,A....�r - ---- .J�Y a
i 4J1. ' 1 , � ����� d�+,: _+mss -s � . . _ �-J,'.�-+ r_... - .s11.Jt. .. I .l • 1J.�1 �J
EDEA
VIRGINIA KEY MASTER PLAN
PRESENTATION
51 '
SEPTEMBER 28, 2009
REFINEMENTS
1
2
3
4
5
6
ACTIVE RECREATION PARK
OCTOBER 2009
Building Footprint reduced
Green Public Space
11 1%,1 NJQJNJu, JI IGlu6 11 1%,1'JQJNJu
Six parking garages removed
Coastal Hardwood hammock
and trails added around entire
perimeter of fields
Track and Field facility
seating reduced
Baseball, Softball, Soccer,
-
s
and Tennis reduced
e y r
a
1 ..
i k " k j°
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
F PRESENTATION
NORTH POINT
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
NORTH POINT EXISTING CONDITIONS
NORRIS CUT
MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT
ATLANTIC OCEAN
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
® PRESENTATION
Kex eun �
LEGEND
1. North Point Recreational Center (Community
Meeting Rooms, Dormitories, etc)
2. Confidence/Ropes Course
3. Public Picnic Area
4. Mountain Biking Trails (varying skill levels,
approx. 3 miles total)
5. Eco -campgrounds (46 sites)
6. BMX Course
7. Parking (with bio-swales and pervious
pavement) and Enhanced Public Beach
8. Public Pedestrian and Bicycle Trails (2.75
miles)
NORTH POINT RECREATION PARK
JUNE 2009
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
®
N PRESENTATION
REFINEMENTS
1. Mountain Biking Trails and BMX Biking
removed
2. Additional Public Pedestrian and Bicycle
Trails added for a total of 4 miles of trails
3. Public Open Space Increased (i.e. Public
Picnic and Passive Recreation Area)
4. Confidence/Ropes Course
5. Eco -campgrounds (same number of sites
maintained)
6. North Point Recreational Center
d
EDSA
NORTH POINT RECREATION PARK
OCTOBE
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
i
v
'Fk
k11-0)
I
`•
011
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
SHRIMPERS LAGOON AND COASTAL HARDWOOD HAMMOCK
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
M -Ir-,
I,.
�0
SHRIMPERS LAGOON: PUBLIC BEACH AND COASTAL
HARDWOOD HAMMOCK RESTORATION
EXISTING CONDITIONS_
ATLANTIC OCEAN
1. a `ut g Rt•
.. i
PUBLIC BEACH AND COASTAL
HARDWOOD HAMMOCK AREA
SHRIMPERS LAGOON
LEGEND EXISTING TRAIL MAP
1. Renovated Boat Launch with Canoe/Kayak Rentals and Food Concessions;
Retain traditional features/uses in order to enhance film industry
opportunities within the area's naturalized setting
2. Elevated Boardwalks with Environmental Educational Signage
3. Parking (with bio-swales and pervious pavement)
4. Beach Pavilion and Facilities Building, Playground/Tot-lot, Beach Volleyball
Courts, and Public Picnic Area
5. Enhanced Public Beach Area and Trails
} " 6. Coastal Hardwood Hammock Restoration Area with Enhanced Interpretive
� Trail System with Environmental Education Opportunities (minor
improvements and additions to existing trails)
7. Public Restrooms and Shelter Building
® VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
BILL SADOWSKI CRITICAL WILDLIFE AREA
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
®
r PRESENTATION
LEGEND
1.
2.
3.
4.
BILL SADOWSKI CRITICAL WILDLIFE AREA:
ENVIRONMENTAL EDUCATIONAL TRAILS
Circulator Drop-off Area at Arthur J. Lamb Road
Wildlife Watch Tower, Boardwalks, and Environmental
Education Signage
Miami Skyline Viewing Point (Pedestrian and Bicycle
Access only)
Vehicular Circulation to Wildlife Watch Tower Removed -
PEDESTRIAN and BIKING ACCESS ONLY
BILL S i3+t.iV SKI CRI
WILDI.IFF AREA
® VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
ROADWAY IMPROVEMENTS
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
ROADWAY IMPROVEMENTS
MIAMI MARINE STADIUM LAGOON
I I f
f STADIUM DRIVEWAY
INTERSECTION
PROVIDE
\� UNDER -BRIDGE
PEDESTRIAN CONNECTION
.... 1@ -11
'_ � ,`PUBLIC RESTROi1M5
SHELTER
.ysry
"TRYw '
r
1 4+ ENTRY TICKET BOOTH
L — — — — — —I L ------J
MAST ACADEMY ARTHUR J. LAMB
DRIVEWAY ROAD INTERSECTION
; __.__j
HISTORIC VIRGINIA
KEy BEACH PARK
I ROSENSTEIL MARINE SCHOOL
AND HISTORIC BEACH DRIVEWAY
PROVIDE
UNDER -BRIDGE
PEDESTRIAN CONNECTION
{
40
, II
lic
iz° iz 12° 12° 12° IT LANDSCAPE 4 24'_9'
4 4'
LANDSCAPE �B„ m� uwoscAPE LANDSCAPE LANDSCAPE BUFFER �a min LANDSCAPE PLANTRJG $' 1 12' 1 LANDSCAPE
BUFFER PEDESTR BUFFER RICKENBACKER MEDIAN RICKENBACKER WIDTH VARIER ECESTRIAH BUFFER
AND BIKIN CAUSEWAY TO MIAMI causFWav ra KEY AHDBIKING BUFFER BIKE TWO-WAY BUFFER -PEDESTRIAN BUFFER
TfiA1L DEKST�E BISCAYNE OEXOTINO KE LANE TRAIL
PATH ACCESS ROAD PATH AND BIKE PATH
1. Proposed Improvements on Rickenbacker Causeway 2. Proposed Improvements on
Arthur J. Lamb Road
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
PRESENTATION
FISHING PIER IMPROVEMENTS
VIRGINIA KEY MASTER PLAN
PRESENTATION
SEPTEMBER 28, 2009
LEGEND
1
2
3
FISHING PIER: Graphic representation only
(under the jurisdiction of Miami -Dade County)
30" Raised Landscape Planter with BISCAYNE BAY
Seating
42" Raised Planters with Railing
Boardwalk with Guardrail
(under bridge connection)
f
RICKENBACKUSEWAY
caw
1
! I
VIRGINIA KEY MASTER PLAN SEPTEMBER 28, 2009
®
N PRESENTATION
M�
VIRGINIA KEY MASTER PLAN
PRESENTATION
THANK YOU
SEPTEMBER 28, 2009