HomeMy WebLinkAboutVirginia Key Consensus Master PlanVIRGINIA KEY
CONSENSUS
MASTER PLAN
JULY 2010
• STAKEHOLDER
INTERVIEW PROCESS,
January 18-22, 2007
• PUBLIC MEETING #1: SITE
INVENTORY AND
ANALYSIS,
March 29, 2007
• PUBLIC MEETING #2:
COMMUNITY WORKSHOP
AND CONSENSUS
BUILDING,
June 20, 2007
• PUBLIC MEETING #3:
PRELIMINARY MASTER
PLANNING,
August 26, 2008
• PUBLIC MEETING #4:
VIRGINIA KEY MASTER
PLAN,
May 20, 2009
• WATERFRONT ADVISORY
BOARD,
June 9, 2009
• PLANNING ADVISORY
BOARD,
June 17, 2009
• WATERFRONT ADVISORY
BOARD,
October 5, 2009
• CITY COMMISSION
October 8, 2009
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Public
Consensus
Building
JULY 2010
October 5, 2009
Waterfront Advisory Board
MOTION
To accept the Virginia Key Master Plan as
presented with the following additions and
inclusions:
• Welcome Center on the Marine Stadium site and
restoration of Marine Stadium.
• A transportation plan to and from the Marine
Stadium, Park and Passive use areas.
• No Hotel or Hotels on site.
• Inclusion of one or two of the identified Boat
Ramps included in the Master Plan.
• Re- inclusion of the BMX and Mountain Bike
trails.
• Creation of an Implementation Committee.
• Cleaning up the landfill and examine possible
leaking from the site into the bay.
Proper remediation.
• Increase the buffer areas between nature areas
(i.e. mangrove) and the proposed playing fields.
• Historic Virginia Key Beach continued restoration.
October 8, 2009
City Commission
MOTION
To defer Item PZ.1 to the first scheduled
City Commission meeting in May 2010.
• Immediately allow a mountain bike
facility on North Point,
• Immediately move forward with the
remediation of the landfill and utilize the
$45 million in Miami -Dade County funds
for same, and
• To ensure the Virginia Key Beach Park
Trust has the flexibility in its efforts to
construct, operate, or maintain the
proposed Civil Rights Museum complex
and any other facilities as the Trust may
deem necessary in order for the
Museum to survive
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Waterfont
Advisory
Board
and
City
Commission
Action
JULY 2010
Public Consensus Building and Project Schedule following
City Commission Deferral on October 8, 2009
• December 10, 2009- First Workshop at • May 4, 2010- Final UM Studio presentations
Lummus Park with UEL by architecture students
• January 14, 2010- Second Workshop at
Lummus Park with UEL
• February 3, 2010- Mountain Bike Course
Layout at North Point site
• February 11, 2010- Discussion Item at City
Commission. Deferral to July 22, 2010.
• May 5, 2010- Meeting with UM / UEL/ City
Administration at Mayor's Office
• July 1, 2010- Meeting at County Public
Works Department (Basin Area Plan)
• July 13, 2010- Waterfront Advisory Board
• July 15, 2010 -Parks Advisory Board
• March 27, 2010- Dade Heritage Trust and
Virginia Key Public Planning Coalition • July 21, 2010- Planning, Zoning and Appeals
presentations at Rusty Pelican & design Board
workshop at VKBPT offices
• July 22, 2010- City Commission Meeting
• April 27, 2010- City and County
Commissioners / Staff / UM at City Hall
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Public
Consensus
Building
and
Project
Schedule
JULY 2010
SUSTAINABILITY CRITERIA
1. Structures to follow USGBC's LEED
Criteria for environmental
sustainability standards
2. Use of Best Management Practices
for stormwater management
• permeable surfaces for trails,
parking areas, and roadways,
• bioswales/raingardens,
• green roofs and rain cisterns for
runoff collection, etc)
3. Use of onsite renewable energy resources
(i.e. wind, sun, rain, etc)
4. Use of reclaimed water from Sewage
Treatment Plant for irrigation and other
non -potable water needs
5. Conservation of ecologically -sensitive areas
with some opportunities for environmental
education
6. Encouraging use of biking and pedestrian
circulation through extensive island -wide
trails
7. Reuse of brownfields and landfill area for
green recreational opportunities
8. Use of environmentally -friendly products
and practices for maintenance of parks and
recreation areas
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Sustainability
Criteria
JULY 2010
VIRGINIA KEY
CONSENSUS
MASTER PLAN
NOTE:
This is a Conceptual
Plan. Site elements
such as parking
garage, marina design
and surface parking
area locations may
change.
JULY 2010
VIRGINIA KEY
CONSENSUS
MASTER PLAN
North Point
Existing
Conditions
60.3 acres
JULY 2010
LAND USE SUMMARY
Mountain biking: 33.12 acres (54.9%)
S
Eco Campground: 3.36 acres (5.6%) `
Information Center/restrooms: 0.02 acres (0.03%)
VIRGINIA KEY
Playground/Biker's was h down: 0.72 acres (1.19%)
Pervious parking:1.08 acres (1.79%)
7
CONSENSUS
Hammock/trails/beach: 22.0 acres (36.49%) 11
MASTER PLAN
TOTAL NORTH POINT: 60.3 acres (100%)
North Point Park
`s 2
13
13
LEGEND
11
1. Mountain Bike Trails
2. Eco Campground
1
12
3. Biker's wash down area
4. Information Center with
Restroorns
11
13
5. Pervious parking
y
(100 spaces)
6
6. Enhanced public beach
12
7. Future upland habitat
restoration
B. Restored mangroves
9. Bill Sadowski Nature
Preserve
10. Miami-Dade WASA
tiy,
4
Treatment Plant
11. Observation opportunities
12. Perimeter Multiuse
Nature Trails
13. Coastal Hammock
} 10
,a3,tMt1!
N
W
:;. ht4
r
t,.
GRAPHIC SCALE
so 0 100 200
JULY 2010
1Q
LEGEND
1. Renovated Boat Launch with
Canoe/Kayak Rentals and ,7. "
Food Concessions. (Existing
to be improved)
M VIRGINIA KEY
2. Elevated Boardwalks with CONSENSUS
Environmental Educational MASTER PLAN
Signage. (Existing to be
improved)
"' . , • 1Iile, Shrimper's
3. Existing Parking to be Lagoon,
improved with bio-swales and Public Beach
pervious pavement. and Coastal
Hardwood
4. Beach Pavilion and Facilities Hammock
Building, Playground/Tot-lot, Restoration
Beach Volleyball Courts, and
Public Picnic Area (Existing to
y4 be improved)
1 rfj, s f 3 5. Enhanced Existing Public
Beach Area and Trails
5 6. Coastal Hardwood Hammock
Restoration Area with
Enhanced Interpretive Trail
System with Environmental
T' Education Opportunities
{ (minor improvements and
additions to existing trails)
7. Public Restrooms and Shelter N
Building (Existing to be
improved)
JULY 2010
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Landfill
Existing
Conditions
116.5 acres
N
On
JULY 2010
LAND USE SUMMARY
Sport Fields: 19-9 acres (17%)
Pervious Parking: 2.2 acres (1.8%)
Recreation Center & Restroom 0.5 acres (0.5%)
Open Meadow: 9.0 acres (7.7%)
Mangroves & Hammock: 85.0 acres (73%)
TOTAL LANDFILL: 116.5 acres (100%)
)
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Landfill Park
LEGEND
1. Softball I Little League
(4 fields)
2. Soccer I Football
(4 fields)
3. Tennis (4 courts)
4. Existing / restored
mangroves
5. Batting Cage
6. Open Meadow
7. Recreation Center
8. Playground
9. Pervious parking
(160 spaces)
10. Restrooms
11. Coastal Hammock I
Nature Trails
12. Existing parking along
Arthur Lamb Road
N
ED
GRAPHIC SCALE
h%...d—
50 0 100 200
JULY 2010
LAND USE SUMMARY
Sport Fields: 19-9 acres (17%)
Pervious Parking: 2.2 acres (1.8%)
Recreation Center & Restroom 0.5 acres (0.5%)
Open Meadow: 9.0 acres (7.7%)
Mangroves & Hammock: 85.0 acres (73%)
TOTAL LANDFILL: 116.5 acres (100%)
)
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Landfill Park
LEGEND
1. Softball I Little League
(4 fields)
2. Soccer I Football
(4 fields)
3. Tennis (4 courts)
4. Existing / restored
mangroves
5. Batting Cage
6. Open Meadow
7. Recreation Center
8. Playground
9. Pervious parking
(160 spaces)
10. Restrooms
11. Coastal Hammock I
Nature Trails
12. Existing parking along
Arthur Lamb Road
N
ED
GRAPHIC SCALE
h%...d—
50 0 100 200
JULY 2010
Miami skyline
viewing point
BILL SADOWSKI CRITICAL
WILDLIFE AREA
Wildlife watch tower
.:jy OP ,
°i
0 Rt��~
VIRGINIA KEY
CONSENSUS
MASTER PLAN
BILL SADOWSKI
CRITICAL WILDLIFE
AREA:
ENVIRONMENTAL
EDUCATIONAL
TRAILS
YT
�Q
JULY 2010
` r �f li
LAO
West Lake Park, Florida
Park, Broward County, Florida
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Bill Sadowski
Critical Wildlife
Area:
Environmental
Educational
Trails
JULY 2010
RICKENBACKER
MARINA
RUSTY PELICAN
RESTAURANT
MAST ACADEMY
r�
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Basin Area
Properties
Existing
Conditions
42.2 acres
JULY 2010
4
'�_� `yam;' ♦ _ �� - �j� �.' ��
j
. �r .1' 'r .yam,.. � .. w e� s . --. .: die • �� h 1 6•+ p uT�.
. ,.,•-,.tom+= .t.. , .. „ .. ... .. ,.
10
�I
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Basin Area
Properties
.1119
This is a Conceptual
Plan. Site elements
such as parking
garage, marina design
and surface parking
area locations may
change
JULY 2010
VIRGINIA KEY
CONSENSUS
MASTER PLAN
Transportation
Plan
1. Bus Route
Service
2. Water Transit
Service
3. Solar Powered
Tram
4. Green Parking
N
On
GRAPHIC SCALE
h8��^
50 0 100 200
JULY 2010