HomeMy WebLinkAboutIII.4. Economic Impact Study & Environmental StudyF l3 1 n ! li l FI,i i
Certified Public Accountants & business Consultants
One SPUIIwasl Third AVCnlle 110 Last Broward BOL ilovard 2 15 501.1111 Monroe Streel
Suite 2100 Suite 1950 SCllle 600
Ward, Florida 33131 Port Lauderdale, 11011C1a 33301 Tallahassee. F100da 32301
7'0IephOII0: (305) 374-1574• Telephone: (954) 467-5400 Telepllorle: (850) 224-2994
FaCSIM110: (305) 372.8161 FaCS111111e1 (9S4) 467-6184 Facs1rdle: (850) 224.0099
Website; www.Sbccpa.conl
October 29, 2009
Lucia Daugherty, Esq.
Partner
Greenberg Traurig
1221 Brickell Avenue, 23rd Floor
Miami, Florida 33131
RE: Village Carver MUSP Application update
Ms. Daugherty,
Although there have been changes in our economic markets since 2007, the
aggregate economic impact we estimated in our prior report will not materially change.
The representation is predicated on the fact that while the cost of construction
has decreased in the range of 20-30%, the annual operating cost and project finance
charges have decreased as well. Additionally, and significantly, the project is less risky
(assuming financing remains in place).
The total number of temporary and permanent personnel remains the same.
Tax revenues associated with land values decreased from 2007 levels, but we
view this as a temporary, not permanent, valuation adjustment. Given when we
anticipate this project being completed, the change, if any, would not be significant.
Very truly yours,
SHARPTON4K.h
BRUNSON & COMPANY, P.A.
Dan, CPA/ABV
President
DKS/hr
THE SPINNAKER GROUP
501 SPINNAKER
WESTON, FL 33326
t www.thespinnakergroupinc.com
(954) 347-0967
Fax (954)-217-3614
RE: YMCA Village Carver Project Date: October 19, 2009
To Roberto Lavernia:
Regarding the YMCA Village Carver project proposed relocation of the parking garage from the eastern
portion of the site to the Phase II portion of the site. The proposed change does not affect the open space provided by
the project, the size of the building footprint, the building orientation or the amount of parking spaces being built. Due
to this condition the proposed change is considered non consequential from an environmental perspective. The
Environmental Impact Analysis provided in September of 2007 and submitted with the MUSP application should be
considered valid and consistent with the updated site plan.
Sincerely
T `
Jason Biondi
LEED AP
P'7786- 897- 7783
Building Commissioning - LEEDTM Consulting
BUILDING COMMSSIONINCs
yam`
ms`s.
VILLAGE CARVER
Economic Impact Analysis
Submitted to:
City of Miami
Prepared For
CARLISLE DEVELOPMENT GROUP
Prepared by:
SHARPTON, BRUNSON & COMPANY, P.A.
One Southeast Third Avenue
Suite 2100
Miami, Florida 33131
(305) 374-1574
TABLE OF CONTENTS
PAGE(S)
THE PROJECT OVERVIEW 1
EXECUTIVE SUMMARY
Introduction 2
Summary of Benefits 3
OBJECTIVES AND DEFINITIONS
Objectives 5
Definition of Economic and Tax Impact 5
Direct and Indirect Effects 5
Measures of Economic Impact 6
Description of Results 7
DISCUSSION OF THE RESULTS BY ECONOMIC INDICATORS
Impact Indicators
8
Results of Indicators
8
Impact of Construction
8
Impact of Ongoing Operations
9
Impact on Local Tax Revenues
9
Analysis by Economic Indicators
9
Employment
9
Wages
10
Output
10
Local Taxes
11
Public Sector Cost
12
Impact fees
12
EXHIBITS
Exhibit I: Summary of Economic Impact
13
Exhibit II: Impact and Other Fees
14
Village carver is a joint venture between
Carlisle Development Group, LLC and
Biscayne Housing Group, LLC to
develop and provide affordable housing
to residents of the City of Miami and
Miami -Dade County. The site is located
within the Little Haiti Neighborhood
Development Zone, at 401 NW 71
Street, Miami, Florida 33150. The gross
lot area is 340,000 square feet (7.81
acres) and the net lot area is 297,000
square feet (6.82 acres).
Village Carver will be built in three
phases. Phase I is a 9 story high-rise
for the elderly, consisting of 112 one
bedroom/one bathroom units, totaling
68,206 square feet of rentable space.
Phase II is an 8 story high-rise for the
elderly, consisting of 98 one
bedroom/one bathroom units, totaling
59,677 square feet of rentable space.
Phase III is an 11 story high-rise for
families, consisting of 48 one bedroom
units; 40 two bedroom units, and 10
three bedroom units totaling 78,650
square feet of rentable space. The
construction will be concrete block
stucco; floor of reinforced concrete;
plaster over lathe or drywall over wood
stud walls and cement roof.
Village Carver will set-aside 100% of the
units for very -low and low-income
individuals &/or households. There is a
tremendous demand for affordable units
in the Miami -Dade market. This site
offers the prospect of creating
affordable units to meet that demand.
The area has been experiencing new
development which includes multifamily
rental rehabilitation and new
construction. The immediate vicinity
has a number of relatively old single
family and substantial number of small
retail businesses. The Little Haiti
neighborhood, and the northeast section
of the City of Miami in particular, have
suffered years of disinvestment
evidenced by low-end retail,
sub -standard housing and relatively
high rents (based on square footage).
The area is recently a focus of public
sector and private sector re-
investment.
This proposed community has
excellent proximity to public
transportation and highway 1-95.
This provides easy access for the
residents to all directions in the
county. Village Carver is also located
a short distance away from
employment centers (offices, retail
and industrial) schools, houses of
worship, parks, stores, hospitals, fire
station, library and other community
services.
Carlisle and Biscayne Housing are
committed to attracting, serving and
keeping their residents. Village
Carver presents a great opportunity
to provide a unique living experience
to the very low and low-income
population of Miami. In order to
enhance the quality of life of the
residents, special programs and
activities will be implemented at no
cost to the residents.
In addition to meeting all building
code, Fair Housing Act, and
Americans with Disabilities Act
requirements, the development will
have all of the required features and
amenities for the elderly demographic
such as a multi -functional community
center with library and computer lab
ad unit amenities will include air
conditioning, cable TV hook-up,
ceiling fan, and window treatments.
This document represents an in-depth This analysis encompasses the
economic and tax benefits analysis of entire Project and estimates the
the development and operation of economic and tax benefits for
affordable housing facilities. both its developmental and
The Project currently contemplated is operational phases.
comprised of the following
components:
❑ 308 residential units.
❑ 381 parking spaces.
The Project will bring significant
economic benefits to the city of
Miami (the City). This section
summarizes the impact of the
project on employment, public sector
revenues and other economic
benefits as a result of the
development.
Employment
Employment considerations include
the direct employment resulting from
the Project. Average developmental
construction phase employment will
be for approximately 132 employees
and the Project management is
expected to employ 12 people for
on-going maintenance and
operations of the facilities.
Wages
To compute the wages associated
with the new employment we started
with budgeted data directly related to
the developmental and operational
phases of the Project, and we
incorporated data from our research
on retail sales. Total direct and
indirect impacts expected from
wages associated with the new
development approximate the
following:
One Time $33,825,600
Annual $ 939,600
Tax Revenue
The estimate of the public sector
revenues associated with the
development includes taxes and
other revenues generated directly
by the Project. Although ,public
sector costs are important
elements in measuring fiscal
impact, these benefits have not
been quantified in this document.
This analysis only measures the
benefits derived from the
development. Annual tax revenue
expected to be created totals
$11839,141.
Output
The estimate of total economic
impact is measured by total
output. This analysis measures
the economic impact of
developmental costs and ongoing,
operational expenditures. To
determine the effect of respending
within the City, we utilized a
multiplier to compute total direct
and indirect benefits. Total output
expected to be generated, as a
result of the developmental and
operational phases of the Project
will approximate the following:
One Time $ 107,353,940
Annual $ 2,185,885
Significant Community Benefits:
➢ Jobs
Wages
➢ Taxes
Economic Activity
Residents' Spending Impacting Local
Businesses:
➢ Food
➢ Recreation/Entertainment
➢ Transportation
➢ Retail
The following table and charts summarize the economic impact of the Village Carver
development.
Economic Activity Stimulated
Output
Wages
Taxes
Jobs Created
CONSTRUCTION
PERIOD ANNUAL
IMPACT RECURRING
$ 107,353,940 $ 2,185,885
33,825,600 939,600
1,839,141
$ 141,179,540 $ 4,964,626
132 12
4
Objectives
The objective of this analysis is to provide
information on the various benefits
created by the Project and to prepare an
estimate of such benefits to the City.
Our analysis is based on an economic
model, which estimates economic and tax
impacts of various projects on a
designated area. The model is
specifically tailored to the City of Miami
(the City).
Definition of Economic and Tax Impact
The construction and subsequent
operation of the Project will create
important benefits within the City. These
benefits include new income, new jobs,
new tax revenue and new economic
activity impacting upon every sector of
the local economy. Moreover, through
the multiplier effect of respending and
reinvesting, indirect economic benefits
are added to the direct benefits brought
about by initial construction expenditures,
the expenditures from ongoing operations
and new spending at the retail
enterprises.
Direct and Indirect Effects
The total economic impact of public and
private projects and policies on a region
does not end with the impact from the
initial construction expenditures; the
continued benefits to the local economy
must also be considered. Income to firms
furnishing construction materials and
services is subsequently converted into
employee salaries, material purchases,
investment in plant and equipment,
savings, profits, purchases of services,
and a variety of other economic activities.
Income to laborers is subsequently
respent for purchasing of food,
housing, transportation, education,
entertainment, medical and dental
services, clothing, personal services,
and a wide variety of other goods
and services.
Furthermore, income to the
governmental unit is respent as
salaries, purchases, and support of
a variety of programs, including
education, transportation, and social
services. In turn, individuals, firms,
and governments furnishing these
goods and services again spend
their income for more purchases,
salaries, investments, and savings.
In this manner, indirect benefits
result each time the initial sum is
respent, and the additional sum
available in the local economy
induces further job creation,
business development and savings.
Quantification of these indirect
benefits has been the object of
considerable economic study.
Because economic relationships are
so complex in our modern society,
no single area or political unit is a
completely self-contained economic
unit. Therefore, purchases from
other areas and political units are
necessary, and goods services are
exported in return.
As purchases are made from other
units, some of the benefits of
economic respending are lost to the
local economy. Ultimately, a smaller
and smaller portion of the initial sum
would remain, until, after several
rounds of respending, an
insignificant sum is left.
The indirect effects can be viewed as
a set of "ripples" in the economy.
Indirect, like direct, resources require
labor, materials, equipment and
services for their production to induce
further job creation and spending of
wages.
The "ripple" of the indirect effect
multiplies the original impact of the
purchase. The common measure of
the magnitude of the "ripple" effect is
called a multiplier. A multiplier
measures the total magnitude of the
impact on each particular economic
indicator as a multiple of the initial,
direct effect. For instance, a
multiplier of "1" would signify no
"ripple" effects as the total impact is 1
times the initial impact, while a
multiplier of "2" would imply that the
total impact is 2 times the direct
effect.
The actual magnitude of a multiplier
depends on the likelihood the goods
and services purchased in a region
would be produced in, or provided
from the region.
The model we used to estimate the
total economic impact incorporates a
multiplier developed by utilizing past
consumption and production patterns
in the City.
There will be significant economic
benefit derived from the expenditures
of the residents of the Project on
eating, drinking, grocery, recreation,
retail etc. This report does not include
the economic impact of such
expenditures.
Measures of Economic Impact
Various measures can be used to
indicate the impact of a policy or
project on a region. Specifically,
for this study, they are the
increases in local employment,
wages, tax revenue and output that
result. Definitions of these
measures are as follows:
Employment is measured full-time
equivalent jobs.
Wages include wages, salaries,
and proprietor's income only. They
may include non -wage
compensation, such as pensions,
insurance, and other fringe
benefits. Wages are assumed to
be expended by households in the
area at which the wage-earner
works.
Local taxes include additional
revenues from both ad valorem and
non ad valorem assessments.
Direct expenditures include those
sums expended for land
acquisition, site preparation and all
hard and soft costs associated with
a project.
Indirect expenditures are those
sums expended within the local
economy as a result of the "ripple"
effect described earlier.
Output describes total economic
activity, and is essentially
equivalent to the sum of direct and
indirect expenditures (exclusive of
wages and taxes).
Description of Results
For the purpose of describing the
total economic benefits of the
Project, the related expenditures
and economic activity stimulated
have been broken into two
categories:
➢ Developmental
Annual Recurring
Developmental expenditures
include those expenditures related
to the design and construction
phase of the Project and related
amenities.
Annual recurring activities
stimulated are those expenditures
incurred in connection with the
ongoing operation of the Project,
and the sales and expenditures of
the retail enterprises leasing
space at the Project.
7
Impact Indicators
We measured the Project's impact on
four commonly used indicators of
economic activity.
Those indicators are:
➢ Jobs
➢ Wages
➢ Total output
➢ Local taxes
Results of Indicators
Exhibit I details the Project's direct and
indirect impact on the above economic
indicators for Miami. A summary of
such impact follows:
DEVELOPMENT
The economic indicator most commonly
measured, and publicly reported on to
gauge the economic impact of a public
project is output. The impact of a
project on the indicator output is often
referred to as the project's economic
impact.
Impact of Construction
The site preparation and construction
expenditures, including soft costs and
impact fees are estimated at $75
million. Such activity will create
approximately 132 new full time
equivalent jobs and employ a maximum
of 167 workers during peak periods.
The workers will earn approximately
$18 million in direct wages.
(One Time)
OUTPUT
WAGES TAXES
EMPLOYMENT
Direct
$ 57,127,469
$ 18,000,000
132
Indirect
50,226,471
15,825,600
$ 107,353,940
$ 31825,600
132
ANNUAL
Operational:
Direct
$ 1,163,200
$ 500,000 $1,839,141
12
Indirect
1,022,685
$ 2,185,885
$ 939,60 alIL9..141
12
Impact of Ongoing Operations
As a result of the on-going operation and
maintenance of the Project, Miami will
gain approximately 12 new, permanent
full-time equivalent jobs. The wages of the
workers who obtain these positions will
provide an impact of approximately $940
thousand annually.
The total expenditures for the Project's
operations, will provide a new, permanent
impact of $2.2 million annually to the
City's economy. This impact consists of
the effects of the direct expenditures from
the maintenance, security and day-to-day
operation of the Project, and the multiplied
effects of such spending thus creating
indirect benefits.
Impact on Local Tax Revenues
As a result of the construction and
operation of the Project, various state, city
and city governments and agencies would
gain an estimated annual tax benefit of
$1.8 million.
Analysis by Economic Indicators
Our analysis of the economic and tax
benefits of the Project was done by each
major phase of the Project. We identified
the major phases to be developmental
and operational.
This analysis determines the economic
benefits to the City by identifying such
benefits for each of the phases.
The effects on economic indicators
used to measure benefits
(employment, wages, output and
taxes) were computed for each
phase.
Employment
Employment is one of the most
important economic benefits of the
Project. It is one of the most
accessible and direct benefits for the
City's residents and it's residents and
is a primary means by which
developmental, operational and
maintenance expenditures generate
indirect economic benefits. A portion
of this employment occurs on-site as
a result of new spending at the retail
enterprises, and a portion is derived
from on-going operations of the
Project. Further employment is
generated off-site by the expenditures
of employees of the Project and
businesses located in the Project, at
area businesses.
As can be seen in Exhibit I, total
short-term (developmental)
employment will average 132
employees over a thirty-six month
period and a total on-going
employment will average 12.
The total on-going positions can be
summarized as follows:
Management
Security
Parking
Maintenance/Facilities
P
Wages
The analysis deemed wages are a direct
by-product of employment. As discussed
in the above section, both on-site and off-
site jobs are created. There were both
temporary and permanent in nature.
To compute the wages associated with
the new employment we started with
budgeted data directly related to the
developmental and operational phases of
the Project.
Employment, such as construction related
employment, was obtained directly from
construction estimates. These numbers
were tested for reasonableness.
Output
The output generated, as a result of the
development and operations of the
Project, is caused by the following type of
expenditures:
➢ Development costs expended in the
City (100%)
➢ Annual operational expenditures of
management company
➢ New spending in the locality by
employees of businesses
located in the Project
To incorporate the impact of dollars
being respent and/or reinvested in the
City, a multiplier was applied to total
direct output. A multiplier of 1.8792
was used to determine total direct
and indirect output created by the
Project. This multiplier indicates that
for every $100 spent in Miami,
another $187.92 will be respent or
reinvested in Miami. This multiplier
was obtained from the Dade City
Planning Department.
Direct output from the developmental
phase of the Project is primarily a
result of developer costs. These
costs include land acquisition, site
preparation and soft and hard costs
relating to the Project's construction.
To determine the total output we
determined what development costs
were expected to be or had been
spent in Miami.
Total direct output during the
development phase is $57 million.
Total indirect output created by the
direct respending in Miami is $50
million. Thus total Miami Output from
the development of the Project is
$107 million.
The final component of output results
from the direct operating expenditures
of the Project, and the indirect
benefits created as a result of the
multiplier effect on direct output.
The Developer provided us with an
annual operating budget for the
Project. An overall assumption was
made that all expenditures would be
spent initially in the City.
10
Output (Contd.)
The total operating expenditures
incorporate all estimated expenses of
the ongoing operation of the Project.
The impact of the retail enterprises
was measured separately as an
economic indicator.
To incorporate the potential
respending and reinvesting in Miami,
the multiplier effect was measured.
By applying a multiplier of 1.8792 to
the total direct output from operating
expenditures and the retail
enterprises, we determined total
output (direct and indirect) from on-
going operating expenditures and
retail sales.
Local Taxes
A key and significant benefit
generated from the development and
operation of the Project is taxes.
Several types of tax revenue will be
generated from this project including
ad valorem taxes. Specific ad
valorem taxes include real and
personal property taxes. Other taxes
include occupational taxes and
community development taxes.
New real property taxes will be
assessed on the Project. The
assessment is based on a
predetermined mileage rate being
applied to the taxable value of the
real property. We computed real
property taxes for the developmental
phase based on the cost of the
development of the Project.
This assessment base is very
conservative since tax on real
property typically is assessed on
appraised values and not actual
cost.
The basis for ongoing taxes is also
overall cost. The mileage rate was
obtained from the City Tax
Collectors office relative to the
Project's location. The projected
annual real property taxes are
approximately $1.8 million.
Total ad valorem taxes assessed
by Miami -Dade County are
allocated based on mileage rates to
certain governmental entities.
Listed below is the allocation of
projected tax revenue.
City Operating
$ 624,966
School Operating
573,960
County Operating
419,033
Debt Service - City
46,344
Debt Service -County
21,269
South Florida Water
44,553
Library Operating
36,269
School Debt Service
30,896
Florida Inland Navigation 2,873
Environmental Projects 7,463
Children's Trust 31,515
TOTAL $ 1,839,141
11
Local Taxes (Contd.)
Although not quantified, the City, through its
receipt of allocated state sales taxes will
receive an additional benefit as a result of the
development and operation of the Project,
and from the retail enterprises.
Public Sector Costs
Impact fees
Very significant factors in measuring the
economic impact on a specific region of a
project are impact and other required
development fees. A summary of these fees
are listed below:
➢ City of Miami Developmental Impact Fee
➢ City of Miami Developmental Admin Fee
➢ Miami -Dade County Roadway Impact Fee
➢ Miami -Dade County School Impact Fee
➢ Building Permit Fee
➢ Installation Energy Fee
Other Fees
For the purpose of this economic impact
analysis, fees are included as a part of the
direct development cost (output). Impact fees
total approximately $2.1 million and other
fees total approximately $588 thousand.
These fees are shown in detail in Exhibit II.
12
Exhibit I Summary of Economic Impact
Exhibit II Impact and Other Fees
i1 =1 Ar--. : - •
111 111 +
./1 11 111
NOW"-- ••S . 11 111 •;v
• moi• di
rA FA Rxg
• � Id Hca :+..
...11
132
12 $ 1,839,141
144 $ 1,839,141
13
(IMPACT AND OTHER FEES:
IA. Development Square Footages:
1) Total gross building area (with parking)
2) Maximum development area (FAR)
3) Gross parking area
B. Impact Fees:
1) City of Miami Developmental Impact Fee
2) Developmental Impact Administration Fee
3) Miami -Dade County Roadway Impact Fee
4) Miami -Dade County School Impact Fee
Total of all Impact Fees
C. Non -Impact fees:
1) Miami Dade W.A.S.A. "connection fees"
2) Building Permit Fee
3) Installation Energy Fee
4) Major Use Special Permit Application Fee
5) Miami -Dade County Code Compliance
6) Radon Gas Fee
7) Fire Plan Review Fee
8) Ground Cover Fee
9) Land Use/Zoning
10) Zoning Review for Building Permit Fee
11) Certificate of Occupancy Fee
12) Application Fee
Total of all Non -Impact Fees
Total of all Fees for Project
Square Footage
363,586
251,172
84,420
Amount
$ 1,448,216
43,446
270,116
378,093
$ 2,139,871
430,584
58,191
33,559
30,000
27,300
1,455
2,764
432
2,968
60
250
35
$ 587,598
$ 2,727,469
Source: City of Miami Planning, Building and Zoning Department.
Miami Dade County Impact Fees
14
k�
�errt�7�l�13�
313,26
P1`�'�tit�,(}aes�rrinak�.rgftltt��tt�u t�t�n�
RE: YMCA Village Carver MUSP Application September 17`x', 2007
Environmental Impact Analysis Statement (EIAS)
To Whom It May Concern:
After review and consideration of the proposed project MUSP application provided to me by Greenberg
Traurig P.A., and prepared by Corwil .Architects, Greenberg Traurig P.A., Richard Garcia and Associates, Sharpton
Brunson & Co., and SunTec Engineering dated May 2007, it is determined that the YMCA Village Carver will have a
favorable impact on the immediate neighborhood. Based on the elements and potential impact of the development in
the context of the environmental and social conditions of the study area, this EIAS takes into consideration the
following environmental issues: the economy, public services, environment and housing supply within the City of
Miami.
A complete economic impact analysis provided by Sharpton Brunson & CO. P.A. is included in the MUSP
application, Tab 4. In summary the report states that the increase in employment opportunity as a measure of full time
equivalent jobs, wages, local taxes, direct expenditures, indirect expenditures and output generated by the project are
determined to be a positive economic result of the proposed project. Please see Tab 4 of the MUSP application for
further analysis.
The effect of YMCA Village Carver on public services will be multi faceted. The Projects' relationship to
traffic flow, pedestrian movement and transportation access is thoroughly examined by Richard Garcia Associates and
can be found under Tab 2 in the MUSP application. By channeling development to areas like this with existing
infrastructure, greenfeild space, natural habitats, the impact on natural resources can be protected. Communities with
at least ten basic services within a half mile radius reduce the impact of vehicular traffic, improve productivity, alleviate
parking problems, and promote healthy levels of outdoor physical activity. Similarly YMCA Village Carver will
promote public transit use due to its close proximity to bus stops with a variety of bus lines within % mile. Bus stops
for lines 2, 9, 10, 202 are within walking distance of this project and provide service to schools, light rail, malls, and
city centers. A large number of people are willing to use mass transit if it is convenient and facilities are provided.
This strategy can potentially reduce the energy demand for transportation which would cut CO2 emissions and lessen
the negative effects of building high rise sites by reducing parking. In addition YMCA Village Carver will be
providing laundry facilities, a library, computer lab, 24 hr on call manager, housekeeping assistance, meditation
gardens, access to health professionals, recreation rooms and community life oriented classes. Having these amenities
YMCA Village Carver will supplement and add value to the neighborhood, provide a sense of community, improve the
quality of life through its public services. Providing facilities for recycling would help to reduce the amount of waste
bound for our landfills and also help alleviate the strain on our virgin resources.
The proposed site for YMCA Village Carver is a previously developed site which is not considered prime
farmland, a greenfield, an habitat for any species on the threatened or endangered species lists and is not within 100 feet
of wetlands, or public park land. Since this site has been previously disturbed, damage to the environment is limited
and more sensitive land can be preserved. Erosion and sediment control measures should be outlined by the civil
engineer and performed by the general contractor during construction. South Florida Water Management District
requires a Storm Water Pollution Prevention Plan as per the National Pollutant Discharge Elimination System. An
Erosion and Sediment Control Plan may be a requirement of that standard. Creative and careful site design has been
used to integrate the natural setting with the buildings thus allowing a connection between the built environment and
natural spaces. The developers' proposed plan exceeds the requirements for open space by 36,637 square feet. The
building footprint is only 25% of the 7.8 acre site. The remaining area exists as picnic area, landscape area, recreational
area, and minimal surface parking. This will provide a connection to the natural environment, while promoting a sense
of community. Using a high percentage of native or adaptive species for the landscaping in these areas will help restore
habitat and may reduce water needs for irrigation. Additionally all major occupied areas within the units have access to
vision glazing for 50% of the space furthering the residents tie to the outside and natural light. Further more the
majority of parking being provided at YMCA Village Carver will be covered, garage type parking, This will help
reduce the urban heat island effect, of a project this size, which can be detrimental to site habitat, wildlife and migration
-�
Building Commissioning • LEEDTnr Consulting
PLAI04NC Cl7t.!/. ss"7IG
C
corridors. Using a highly reflective roofing membrane and light colored concrete for uncovered parking and roadways
will reduce the heat island effect even further and possibly reduce HVAC loads and energy costs.
SunTech Engineering has determined that the stormwater management planned for the project will improve
both treatment and drainage. Storm water flows will be managed with on site exfiltration trenches additional
improvements are proposed for two separate city right — of — ways, NW P Ave. and NW 7151 St. landscaping and
drainage. Improvements include two lanes of roadway, grass swales, and connecting 5ft sidewalk area. This strategy
will be used to control the quality and quantity of stormwater as it replenishes the Biscayne Aquifer.
Issues pertaining to the supply of affordable, elderly housing are addressed in the Project Description portion
of the MUSP application as well as within the Economic Analysis under Tab 2.
Regarding environmental impacts associated with this project, it is my professional opinion that the proposed
development site is appropriate and has a favorable impact within the immediate neighborhood and its environment.
While developing the design for YMCA Carver and building on this site, consideration should be given towards using
water efficiently, maximizing energy efficiency, using environmentally appropriate materials, and monitoring indoor
environmental quality. In this way the impact of development upon our natural environment can be minimized and the
performance of our built environment can be maximized.