Loading...
HomeMy WebLinkAboutIII.3. Site Utility StudyWMENSun-Tech Engineering, Inc. 1600 West Oakland Park Boulevard Fort Lauderdale, Fl. 33311 I.m.ginecrs Q Planners 0 Surveyors (954) 777-3123 /Fax (954) 777-3114 E-mail: suntech@suntecheng.com October 21, 2009 City of Miami Attn: Roberto Lavernia 444 S.W. 2nd Avenue Miami, FL 33130 RE: YMCA CARVER MUSP STATEMENT OF CONSISTENCY -SITE UTILITY STUDY STE PROJECT No. 05-2978 Dear Mr. Lavernia: Sun -Tech Engineering, Inc has reviewed the revised site plan and we confirm that the Utility Study prepared in 2007 is still accurate and valid for the revised MUSP. The drainage characteristics have changed but have not compromised the ability to construct the proposed development. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, SUN -TECH ENGINEERING, INC. ��VV � William C. Lips, P.E. Florida Registration No. 61741 Cc: Oscar Sol, The Carlisle Group Iris Escarra, Greenberg Traurig P.A. Heidi Henderson, STE K:\Project Docs\05-XXXX\05-2978 YMCA Village Carver\Letters\Lettel'008 City MUSP-Site Utility.doe Vow MCA VILL, AGE CAR_V ER 401 N.W. 71St STREET MIAMI, FLORIDA 33150 SITE UTILITY STUDY APRIL 2007 PREPARED FOR: BIS CAYNE HOUSING GROUP, INC. 150 SE Second Ave, Suite 1202, Miami, Fl, 33131 THE CARLISLE GROUP 2950 SW 27"' AVENUE, SUITE 200, MIAMI, FLORIDA 33133 PREPARED BY: is SUN—TECH ENGINEERING, INC. 1600 WEST OAKLAND PARK BOULEVARD FORT LAUDERDALE, FLORIDA 33311 954-777-3123 954-777-3114 (fax) www.suntech &suntechenll.com YMCA Village Carver Site Utility Study April 2007 I. INTRODUCTION The project site is located at 401 NW 71" Street, Miami, Florida 33150 and has a net area of 6.81 acres. An affordable elderly & family residential community is proposed consisting of three separate phases. Phase I consists of a 9 story elderly apartment building having 112 units and an attached parking garage. Phase II consists of an 8 story -98 unit elderly apartment building with an attached parking garage and Phase III consists of an 11 story -98 unit family apartment building with an attached parking garage. Driveway connections are proposed onto NW 71St Street and NW 72"d Terrace. II. DRAINAGE SYSTEM General Runoff Characteristics The proposed site does not include a lake or an offsite drainage connection so all stormwater runoff shall be collected and stored within on-site exfiltration trench. The drainage system must be designed to accommodate the traditional runoff generated from the horizontal surfaces, and in addition Miami -Dade DERM requires that for high rise buildings, the proposed drainage system also take into account runoff from one-third of the largest vertical building face. Preliminary drainage calculations are shown in Exhibit A. Site Coverage Data Horizontal Areas AREA ac. PERCENT Building 0.94 14% Paved (On grade Parking & Roads) 2.48 36% Sidewalk 0.86 13% Garage 1.03 15% Green (Landscaping,) 1.50 32% TOTAL 2.44 100% Vertical Areas (1/3 of the building faced Phase I Tower (1/3 x 205' x 95') 0.15 Phase II Tower (1/3 x 205' x 95') 0.15 Phase III Tower (1/3 x 205'x 95') 0.15 TOTAL 0.45 TOTAL IMPERVIOUS AREA (including vertical areas) 5.65 79% PERVIOUS AREA 1.50 21% TOTAL RUNOFF AREAS 7.15 100% Page 2 of 5 YMCA Village Carver Site Utility Study April 2007 Permit Criteria South Florida Water Management District (SFWMD) Per the above site coverage data, this project requires an Environmental Resource Standard General Permit, in accordance with the SFWMID Permit Information Manual, Volume IV, Chapter 40E-40. Miami -Dade County Dept. of Environmental Resources Management DERM In accordance with Section D-4 of the Miami -Dade Public Works Manual, the drainage system must be designed to store the required water quality treatment volume or the runoff generated from the 5 year -1 hour storm event, which ever is greater. The minimum parking grade must be above the 5 year -1 hour storm elevation. These calculations are shown on Exhibit A. Note: DERM requests that the drainage systems for the parking levels below roof, not subject to direct rainfall, be kept separate from the site drainage. Minimum Grade Criteria Parking Lot/Road Grade- Min. of: 5 year -1 hour storm elevation Moot below back of sidewalk grade Minimum Perimeter Grade- 25 year -3 day storm elevation Finished Floor Elevation- Min. of 100 year -72 hour storm elevation 8" above crown of City Rd. FEMA Base Flood Elevation(See Exhibit B) Project Discharge This project does not have an offsite drainage connection unless a drainage well is permitted. If drainage wells are permitted at this location, the drainage system can be designed to store the required water quality treatment volume and then discharge any additional runoff directly into the drainage well. Drainage Wells Drainage Wells are regulated by the Department of Environmental Protection and the main limiting criteria permitting their use is such that the well casing shall penetrate a zone containing a minimum of 10,000 mg/L Total Dissolved Solids (TDS). A test hole has been drilled and tested to a depth of 200 feet and the minimum TDS was not obtained. Due to the excessive costs to drill a well casing below 200 feet, the test well was abandoned without reasonable assurance of the minimum TDS. Page 3 of 5 YMCA Village Carver Site Utility Study April 2007 III. WATER DISTRIBUTION SYSTEM Miami -Dade Water and Sewer Department owns and operates the public water mains in this area. The existing water mains adjacent to the project are as follows: NW 5th Avenue- Twenty (20) inch NW 71" Street- Eight(8)inch NW 72"d Terrace- Six (6) inch Pursuant to a request for Service Agreement from MD-WASD, "the preliminary "Points of Connection (P.O.C.)" were determined by MD- WASD dated January 29, 2007 and state the following: "Connect to an existing twenty (20) inch water main in N. W. Sth Avenue and N. W. 71" Street and extend a sixteen (16) inch w.m. easterly in N. W. 71" Street to the southeast corner of the property, interconnecting to an existing eight (8) inch w.m. at that location. Any public water main extension within the property shall be twelve (12) inch minimum diameter. If two (2) or more fire hydrants are to be connected to a public w.m. within the property then the water system shall be looped with two (2) P.O. C. Separate connections for fire lines and fire hydrants are required". Phase I water and fire service is proposed directly from the proposed 16" water main within N.W. 71" Street including a 4" water service for the apartment building, a 6" fire service, and one fire hydrant. A twelve (12) water main extension is proposed on-site, from which one fire hydrant is proposed, maintaining a maximum distance of 300 feet between hydrants. Phase II & III shall extend and loop the twelve (12) water main to the existing twenty (20) inch water main within NW 5th Avenue. Water services, fire services and fire hydrants shall be provided to Phases II & III by the looped on-site twelve (12) inch water main. The estimated average daily water consumption from this project is 61,600 gallons per day (gpd), as calculated in Exhibit C. Page 4of5 YMCA Village Carver Site Utility Study April 2007 IV. SANITARY SEWER SYSTEM MD-WASD owns and operates an eight (8) inch gravity sewer main in N.W. 71St Street and N.W. 72"d Terrace. Pursuant to the above referenced preliminary P.O.C., MD-WASD determined the following: "Connect to any of the existing eight (8) inch gravity sewers in N. W. 71" Street and/or N. W. 72 Terrace. " Phases I & II which are adjacent to N.W. 71St Street shall connect to the existing 8" gravity sewer main within N.W. 71St Street. Phase III, located in the northeast corner of the site, shall connect to the existing 8" gravity sewer main within N.W. 72"d Terrace. The estimated average daily sewage flow from this project is 61,600 gpd, as calculated in Exhibit C. V. SOLID WASTE MANAGEMENT On -Site receptacles for refuse and recyclables are proposed within each of the buildings. Regular pick-up service shall be provided by either the City of Miami Solid Waste Department and/or an approved private hauling company. Page 5 of 5 SUN -TECH ENGINEERING, INC. DATE: 4/11/2007 1600 W. OAKLAND PARK BLVD. REV: FORT LAUDERDALE, FL 33311 BY: KKS EXHIBIT A SURFACE WATER MANAGEMENT CALCULATIONS FOR YMCA VILLAGE CARVER - ULTIMATE BUILD -OUT HORIZONTAL SURFACE LAND USE BREAKDOWN LAND USE AREA PERCENT BUILDING 0.94 14% PAVED AREAS 2.48 36% SIDEWALK 0.86 13% GREEN 1.50 22% GARAGE 1.03 15% TOTAL 6.81 100% VERTICAL BUILDING FACES BUILDING WIDTH HEIGHT 1/3 x AREA (AC.) Phase I Tower Phase II Tower Phase III Tower 205 205 60 95 95 95 0.15 0.15 0.04 TOTAL 0.34 ADJUSTED GRADING PARAMETERS LAND USE BREAKDOWN* LAND USE AREA PERCENT FROM TO BUILDING 1.28 18% 11.5 100 PAVED AREAS 2.48 35% 9 11 SIDEWALK 0.86 12% 10 11.45 GREEN 1.50 21% 8 11 GARAGE 1.03 14% 17.00 100 TOTAL* 7.15 100% TOTAL RUNOFF AREAS* LAND TYPE AREA PERCENT IMPERVIOUS 5.65 79% PERVIOUS 1.50 21% TOTAL 7.15 100% *DERM requires additional runoff generated from the vertical building faces be incorporated into the surface water management system. Exfiltration Trench Total Exfiltration Volume V(ac-in)= L x [K x (H2W + 2H2DU-D�2 + 2H2Ds) + (1.39 x 10"4)WD„l = 89.2 = 7.44 ac -ft Trench Stage -Storage Calcs. Stage (ft) Storage (ac -ft) 3 0.00 3.5 0.93 4 1.86 4.5 2.79 5 3.72 5.5 4.65 6 5.58 6.5 6.51 7 7.44 Trench Characteristics L= 1000 W= 4 KA,g= 5.31 E-04 H2= 6.00 Du= 4.00 DS 9.00 STAGE -STORAGE CALCULATIONS Assume Linear Progression for all Areas Stage Area acres Storage (ft-NGVD) (ac -ft) PAVED AREAS SIDEWALK GREEN Total 3.0 0.00 0.00 0.00 0.00 0.00 3.5 0.00 0.00 0.00 0.00 0.93 4.0 0.00 0.00 0.00 0.00 1.86 4.5 0.00 0.00 0.00 0.00 2.79 5.0 0.00 0.00 0.00 0.00 3.72 5.5 0.00 0.00 0.00 0.00 4.65 6:0 .0.00 0.00 0.00 0.00 5.58 6.5 0.00 0.00 0.00 0.00 6.51 7.0 0.00 0.00 0.00 0.00 7.44 7.5 0.00 0.00 0.00 0.00 7.44 8.0 0.00 0.00 0.00 0.00 7.44 8.5 0.00 0.00 0.25 0.25 7.50 9.0 0.00 0.00 0.50 0.50 7.69 9.5 0.62 0.00 0.75 1.37 8.15 10.0 1.24 0.00 1.00 2.24 9.06 10.5 1.86 0.30 1.25 3.41 10.47 11.0 2.48 0.60 1.50 4.57 12.46 11.5 2.48 0.86 1.50 4.84 14.81 Project Location Hydraulic Details Design Water Level= 3.00 Allowable Discharge* = N/A csm = Total Area x N/A / 640 = * DISCHARGE/POSIT/VE OUTFALL NOT AVAILABLE Design Storm Rainfall Amounts (in.) Storm Frequency DERM inches 24 hr 72 hr 5 year 7.1 12.72 10 year 8.7 17.88 25 year 14.6 100 year 19.8 Soil Storane Calculation N/A cfs A. Total Pervious Area = 1.50 acres B. Depth to Water Table = 6.5 feet C. From SFWMD Permit Information Manual, Vol. IV, Figure E-1, For 'Developed/Compacted Normal Typical Sandy(Coastal)', the Cumulative Available Soil Storage is: Sp = 8.18 inches D. Site Soil Storage = Sp x (Pervious Area/Total Area) 1.72 inches Water Quantity Calculations A. Calculate the Runoff in Inches. Q= (Rainfall - 0.2 x Soil Storage)2 / (Rainfall + 0.8 x Soil Storage) QSyr-1day= 5.39 inches Q10yr-1dy 6.93 inches Q25yr-3dy= 12.72 inches Q100yr-3day 17.88 inches B. Calculate the Runoff Volume V= Q x Project Area (1 ft / 12 in) V5yr-1day= 3.21 ac -ft V1oyr-1day= 4.13 ac -ft V25yr-3dy 7.58 ac -ft V100yr-3day 10.66 ac -ft 3 C. Using the stage -storage chart and the runoff volumes calculated above, the corresponding stages can be interpolated. Stage5yr-1day= 4.73 ft Stageloyr-1day= 5.22 ft Stage25yr-3dy= 8.73 ft Stage,00yr-3day= 10.55 ft Water Quality Calculations (Note: Ignore Vertical Building Faces, include garage parking areas) A. Compute the first inch of runoff from the entire site. = 1 inch x Total Area x (1 ft / 12 in) 0.57 ac -ft B. Compute 2.5 inches times the percentage of imperviousness. a. Site Area (SA), for water quality pervious/impervious calculations onl SA= Total Area - (roof + lake) 5.87 Acres b. Impervious Area (IA), for water quality pervious/impervious calculations PWI IA= Site Area(SA) - Pervious Area = 4.37 Acres C. Percentage of imperviousness for water quality %imp= (IA / SA) x 100% 74.44 % d. For 2.5 inches times percentage of imperviousness 2.5 inches x %imp 1.86 inches e. Compute volume required for quality detention inches to be treated x (total - lake) x (1 ft / 12 in) = 1.06 ac -ft (CONTROLS) C. Since 2.5 inches times the percentage of impervious is greater than the first inch of runoff over the entire site, the volume to be treated is: Volume to be treated = 1.06 ac -ft Interpolating from the Stage -Storage Table, the Volume to be treated is met at a stage of: Stage (Water Quality) = 3.57 ft 4 =EXH`�I B 17'B xF JJ r NW 76TH ST � `r 1,t4w M {Ll 3 z Z Z NW 75TH ST VI z 75TH ST 74TH ST Dade C Nw 74TH ST 744' 73RD TE APPROXIMATE SCALE NW 73RD ST Nw' 3RD -ST 1000 0 1000 FEET incor NW 72ND S NW 72ND ST E X. I NATIONAL FLOOD INSURANCE PROGRAM CITY OF MIAMI o Nw 70TH ST III I { x z NW 69TH ST ro TIRM " 3 j a I FLOOD INSURANCE RATE MAP r "- 68TH ST o NW 68TH ST x NW 67TH ST Z Z Z Z Z Z Z z z I DADE COUNTY, FLORIDA Nw 67tH st AND INCORPORATED NW 66TH ST Nw 66TH S7 95 AREAS. I I Nw 65tH ST Nw 65TH ST z l0 j hflhi;� I!?`l,iili I,�I ILII PANEL 180 OF 625 *NW 64TH ST Nw 64TH S7 < = > Q !L III'I{li{! �!!! (SEE MAP INDEX FOR PANELS NOT PRINTED) (jf 63RD S Z I�II� .,jl; Iiil zN CONTAINS: I x x ST Q r = n n N N NW 63RD ST Nw 53RD Z !t . COMMUNITY NUMBER PANEL SUFFIX I .!..a l! Z ; 3 3 Z 14'S"' , :'�.°. T.i lij� •` • = ; I NW 61ST ST JJE,+ NW 60TH ST 3 NW 60TH ST;1lII{!I!iiil Nw 60tH St z Nw 59TH TE NW 59TH S7 > a U �-'�;'? •.Ii z 58TH TE NW 59TH ST • .,,.. 'III NW z z iil '.:o,;ir--. l; = z Z NW 58TH ST Z 3 Z NW 58TH S it 1 j II1 MAP NUMBER ll= p 12 02 5 Jl. d1V0 Z .- NW 57TH ST Nw 56TH ST z x S z z 2 x z p NW 57TH S z NW 56TH s15 i 11� - .n N" MAP REVISED ' MARCH 2, 1994 Nw 55TH TE NW 55TH SIIIj]1'^O y I� NW 55TH ST II II ngeen£ Agency {II Fed -al Emergeac7 Menm This is an official copy of a portion of the above referenced flood map. It < was extracted using F -Mfr On -Line. This map does not reflect changes NW 53RD ST or amendments vdhich may have been made subsequent to the date on the NW 53RD ST title block. For the latest product information about National Flood Insurance r > > program flood maps check the FEMA Flood Map Store at www.mso.fema.gov SUN -TECH ENGINEERING, INC. DATE: 4/20/07 1600 W. OAKLAND PARK BLVD. REV.: FORT LAUDERDALE, FL 33311 BY: WCL EXHIBIT C ESTIMATE OF WATER & WASTEWATER FLOWS FOR YMCA VILLAGE CARVER AVERAGE DAILYFLOW FLOW(gpd) TOTAL TYPE OF USE NO. OF UNITS PER UNIT FLOW(apd) Residential Apartments 308 200 61,600 AVERAGE DAILY FLOW = 61,600 gpd 0.062 mgd ESTIMATED PEAK FLOW POPULATION (P) = NO. UNITS x 2 PEOPLE/UNIT x 1/1000 = 0.462 (THOUSANDS) PEAKING FACTOR= (18 + p112) / (4 + pv2) 4.0 PEAK FLOW = ADF X PEAKING FACTOR 245,885 gpd 0.246 mgd Notes: 1, gpd = gallons per day 2. mgd = millon gallons per day 3. No industrial wastewater is anticipated to be generated. '-g a s� sa � pp IN ', (230-0 'tb '0d '89 '8"d)9 ('2!'0'0 '8S 8'd) A1a3d0 d NO v1S8 S a3nla 31llr Ala3d0ad N011V158 S a3n!6 3 1i z E — — — — — — — — — — — — -"� — — — — — — — ----- — — — — — — — — — p— e r U1 EJ III z u -z I m Q III � `L 1.-41 — 2r a I, Irlliiu� �;1,IIII,I II � �II iLJ m�g p p I I • � i i Skf I M ( a 1 I r�. 51 C ry ' fr { ,7 .SSI 1 -dF I 161 i .T f i �en u P I i s pp {I - P oozo-000-zu�-�o ne onod zvi (-a7o 'M '�d 'o -a'd Lk-£S-Zt NOIl03S lNnDO NOSJ3h] g _ 30 NOIl230d 4' mo m �o c'nxiza vz W4. -a to �m A o> iv > I®g aA W YMCA VILLAGE CARVER Sun -Tech Engineering, Inc. p A ENGINEERING EXHIBIT D I