HomeMy WebLinkAboutExhibitAMENDMENT NO.2 TO CONSTRUCTION CONTRACT MIAMARINA PIER NO. 5 REPAIRS AND DINNER KEY MARINA PIER NO. 3 REPAIRS, B -30325/60474A This Amendment No. 2 to the Contract dated February 25, 2009, (the "Contract") between the City of Miami, a municipal corporation of the State of Florida ("CITY"), and Shoreline Foundation, Inc. ("CONTRACTOR") for the project entitled "Miamarina Pier No. 5 Repairs/Dinner Key Marina Pier No. 3 Repairs, B -30325/60474A", ("PROJECT") is entered into this day of , 2009. RECITALS WHEREAS, the Contract was entered into pursuant to the approval of the City Manager as part of the City's Expedite List pursuant to Ordinance 13045, total award amount of $1,085,500, as stated in the original Contract Documents for the PROJECTS; and WHEREAS, there is an additional owner contingency of $108,550 for a total contract amount of $1,194,050; and WHEREAS, pursuant to Resolution No. 09-3072, Amendment No. 1 authorized an increase to the Contract by $41,449.82, from $1,194,050, to a total not to exceed amount of $1,235,499.82, due to unforeseen conditions and Owner requested changes such as revisions to the plans requested by FEMA due to flood elevation changes and owner requested construction services that were not included in the original scope of work; and WHEREAS, it is now necessary to amend the Scope of Work for the Miamimarina Pier No. 5 Repair Project, B-30325, to include additional work due to unforeseen conditions involving the furnishing and installation of a timber fender and replacement of existing timber piles at south end of the new dock, and for owner requested changes, including installation of electrical room louvered doors with a panic device and self contained emergency light, an ice maker panel feeder and breaker, reinforced concrete footing in the electrical room and renewal of the Builder's Risk insurance policy; and WHEREAS, Amendment No. 2 will increase the Contract by $53,110.10, from $1,235,499.82, to a not to exceed amount of $1,288,609.92; NOW THEREFORE, for the considerations hereinafter set forth: The Agreement dated February 25, 2009, is hereby amended as follows: 1. ADDITIONAL WORK is hereby revised to include all labor, materials and equipment required to perform the additional work due to unforeseen conditions involving the furnishing and installation of a timber fender and replacement of existing timber piles at south end of the new dock, and for owner requested changes, including installation of electrical room louvered doors with a panic device and self contained emergency light, an ice maker panel feeder and breaker, reinforced concrete footing in the electrical room and renewal of the Builder's Risk insurance policy. Additional Work shall be performed in a manner consistent will all applicable terms and conditions of the Contract Documents. 2. CONTRACT SUM is hereby increased by an amount not to exceed $44,449.82, �$53,110.10, thereby increasing the total Contract Sum to 944e Millien Two HundFed ThiFty Five FE) ir— UREIred--NiRetJr� Re DellaFs •+nrJ lnight, TWG ron+S ($1 236 499 92 One Million Two Hundred Eighty Eight Thousand Six Hundred Nine Dollars and Ninety Two Cents ($1,288,609.92). All other terms and conditions of the Contract are in effect and remain unchanged. ATTEST CITY OF MIAMI, By: By: Priscilla A. Thompson, City Clerk Pedro G. Hernandez, City Manager APPROVED AS TO LEGAL FORM AND APPROVED AS TO INSURANCE CORRECTNESS REQUIREMENTS: By: By: Julie 0. Bru, City Attorney LeeAnn Brehm, Risk Management Director CONTRACTOR, ATTEST: SHORELINE FOUNDATION, INC By: By: Corporate Secretary John McGee, Vice President Shoreline Foundation, Inc. (Affix Corporate Seal) 1)