HomeMy WebLinkAboutSubmittal-Lucia DoughertyCEMEX (f/k/a Rinker)
1600 and 1750 North Miami Avenue
Improvement costs for upgrades to the CEMEX Downtown Miami concrete plant over last 3 yrs
(approx.):
1. The new retention pond and reclaim system. — $800K
2. Yard repaving and speed bumps. - $70K
3. New grates over drainage pits. - $5K
4. City storm water drains cleaned. —190K
5. New central mixer drum. - $120K
6. Plant painted. - $46K
7. New sprinkler system. - $10K
8. New landscaping. - $25K
9. New speed belt structure. (Belt, rollers, head pulley, tail pulley, frame work etc.) - $40K
10. New water holding tank for batch water. - $10K
11. New dust collector on cement scale. - $10K
12. 2 New dust collectors on cement bins. (This was done before I arrived 2 years ago but they are
new) -$20K
13. Repaved the street in front and back of the plant (NE 17th St and NE 161h St) - $100K
14. State of the art security system. - $10K
15. New hydraulic pump - $12K
16. New liners in gob hopper and spare set for mixer drum. - $25K
Total of above - $1.493 M
List of some of the projects that materials were supplied to over the last few years:.
Quantum on the Bay
900 Biscayne
Met II
Axis
Capri - South Beach
10 Museum
Ice
Brickell on the River
Brickell on the River II
500 Brickell
o& . 02,095
og-oi31sct-Svb���ftod-Luc ia
09- 0iyo7.zt
The Plaza
Continuum I
Continuum II
Performing Arts Center
Parc Lofts
Filling Station Loft II
Poinciana
Epic