HomeMy WebLinkAboutLarqcon Group, Inc.Larqcon Group, Inc. Direct Construction Development (Hard) Costs Simpson Park Cost Description of work Code 01.000 GENERAL CONDITIONS 02-000 SITE CONSTRUCTION 02.001 SITE CONSTRUCTION / PARK EXTENSION (PARTIAL BUDGET) 06-000 METALS 06.000 WOOD & PLASTIC 09.000 FINISHES 12-000 FURNISHINGS 16-000 ELECTRICAL TOTAL BUDGET Cost Calculation Phase Rev.5-27; 6/112009 Simpson Park, Hammock, Miami, Florida Remarks / Qualifications $3,159.02 Seater in all 4 sides $0.00 Signage, Benches & trash receptacle NOT INCLUDED Electrical Work - Labor and rough materials, Landscaping Lighting $29,914.55 fixtures. FPL fees NOT INCLUDED $200,000.00 Layoutfsurveying, General Labor, Temporary Utilities, Dumpsterfrrash removal, Final Cleaning, Project $43,483.92 Superintendent/,Supervisor, Insurance. Demolition / clearing / tree relocation and trimming, Under wood deck/ weed barrier, Landscape materials, Protection and temporary care of existing trees /wall during construction. DOES NOT $15,675.90 INCLUDE ORCHIDS DISPLAY The total cost for the additional work will exceed this amount THE ADDITIONAL COSTS WILL BE COVERED WITH THE $4,318.00 FUNDRAISING EFFORTS - TBD Shop drawings for steel erection and construction, Wood house - entry pavilion. DOES NOT INCLUDE GATE/SCREEN FOR THE $73,514.66 HOUSE IPE Wood Deck. Includes P.T. framing (2" x 8"- 2" x 10" beams, .joists), joist seats, bolts/nuts/washers/nails/screws, etc. IPE finish $29,933.95 decking materials (514 x 6" deck) . $3,159.02 Seater in all 4 sides $0.00 Signage, Benches & trash receptacle NOT INCLUDED Electrical Work - Labor and rough materials, Landscaping Lighting $29,914.55 fixtures. FPL fees NOT INCLUDED $200,000.00 largcon Group, Inc. Direct Construction Development (Hard) Costs Simpson Park Cost Description of work Code Items not in Contract - Exclusions & Qualifications 1 Design & Engineering 2 Blueprints/Couder/FedEx 3 Structure/Engineering Inspections 4 Miscellaneous expenses 5 Storm drainage structures 6 Contingency budget 8 'Permits cost inclu m proses g 9 Concrete tests or soil tests if required 10 Water Meters connection or electrical service 11 Paint 12 Handrails & Railings 13 Benches 14 Trail Pathways Cost Calculation Phase 2 Version 2; 5/26/2009 7 (blb9 .:r.fl. 70.01 a� Simpson Park, Hammock, Miami, Florida Remarks / Qualifications Additional funds besides the $200K are required for complete park implementation. Fundraising efforts will take place to come up with the additional funds estimated in additional $50K Original bench design was expensive, so It will be proposed to create benches out wood and stone combination with a lower budget which shall be also covered by the additional fundralsing efforts. Originally proposed to be done in mulch, however Park & recreation Dept. + DERM wish them to be in crushed shell, which is more expensive. we will try to do the best, but most likely only one path will be done as discussed during meeting with all parties. U-• C,>.