Loading...
HomeMy WebLinkAboutTabulation of BidsItem No, Description Securing with plywood and lumber on an 1 as -needed basis Flat Fee Add -On for Emergency Service as Requested by Contract Administrator (3 hour response time) NOTE: Resecuring building openings previously secured by Contractor with plywood and lumber using existing materials, as requested by Contract Administrator 2 (Labor only) Securing buildings with concrete block and stucco in accordance with Florida Building 3 Code on an as -needed basis Drain and fill-in pools using compressed 4 clean -fill on an as -needed basis TOTAL: Ft. 1 TABULATION OF BIDS IFB NO. 152131: SECURING/BOARDING UP OF VACANT PROPERTY Royal Regions Incorporation Tropex Construction Services Inc Paul Davis Restoration of Greater Miami PRIMARY SECONDARY Est. Unit Extended Unit Extended Unit Extended Qty-._ I Price: Amount: I Price: Amount: Price: Amount: 15000 201 Ft. 3000 Yd. 1 327 N 0 N R E S P 0 N S V E *Deemed non-responsive for failure to possess the required licenses. Prepared by: Maritza Suarez, 7/22/09 Page 1 of 3 $ 3.75 /sq. ft. $ 56,250.00 $ 3.92 /sq. ft. $ 58,800.00 $ 50.00 $ 18.00 /hr. $ 360.00 $ 79.37 /hr. $ 1,587.40 $ 12.50 /sq. ft. $ 37,500.00 ® $ 25.00 /sq. ft. $ 75,000.00 $ 65.00 /cu.yd. $ 21,255.00 A $ 23.80 /cu.yd. $ 7,782.60 $ 115,365.00 $ 143,170.00 Approval: �tt nt D rector/Designee Item No. Description Securing with plywood and lumber on an 1 as -needed basis Flat Fee Add -On for Emergency Service as Requested by Contract Administrator (3 hour response time) NOTE: Resecuring building openings previously secured by Contractor with plywood and lumber using existing materials, as requested by Contract Administrator 2 (Labor only) Securing buildings with concrete block and stucco in accordance with Florida Building 3 Code on an as -needed basis Drain and fill-in pools using compressed 4 clean -fill on an as -needed basis TOTAL: Prepared by: Maritza Suarez, 7/22/09 I Sq. Ft. (Hour TABULATION OF BIDS IFB NO. 152131: SECURING/BOARDING UP OF VACANT PROPERTY Trintec Construction Inc.* South Florida Maintenance Sv Est. Unit Extended Unit Extended yt'. Price: Amount: Price: Amount: 15000 $ 5.75 /sq. ft. $ 86,250.00 $ 14.00 /sq. ft. $ 210,000.0 Sq. Ft. 3000 Cu. Yd. 1 327 $ 650.00 Minimum trip charge of $350 to apply $ 65.00 /hr. $ 1,300.00 4 hour minimum to apply 1 $ 25.00 /sq. ft. $ 75,000.00 $ 130.00 /cu.yd. $ 42,510.01 Minimum Transport charge of $85.00 to apply if less than 6 yards of fill required. $ 205,060.01 Cost of Aerial lifts if required will be additional and is not included in unit $ 22.00 /hr. $ 440.00 j f $ 6.00 /sq. ft. $ 18,000.00 j $ 25.00 /cu.yd $ 8,175.00 1 $ 236,615.00 i Darcon Group Corp. Unit Extended Price: Amount: $ 16.00 /sq. ft. $ 240,000.00 $ 300.00 $ 85.00 /hr. $ 1,700.00 1 $ 43.00 /sq. ft. $ 129,000.00 $ 105.00 /cu.yd. $ 34,335.00 $ 405,035.00 1 r C-1— Vel" Approval: Page 2 of 3 epartm t Dir ctor/Designee Item No. Description Securing with plywood and lumber on an 1 as -needed basis Flat Fee Add -On for Emergency Service as Requested by Contract Administrator (3 hour response time) NOTE: Resecuring building openings previously secured by Contractor with plywood and lumber using existing materials, as requested by Contract Administrator 2 (Labor only) Securing buildings with concrete block and stucco in accordance with Florida Building 3 Code on an as -needed basis Drain and fill-in pools using compressed 4 clean -fill on an as -needed basis TOTAL: Prepared by: Maritza Suarez, 7/22/09 TABULATION OF BIDS IFB NO. 152131: SECURING/BOARDING UP OF VACANT PROPERTY Green Environmental Sol. & Consulting K.M. Engineering Consultants, Inc Est. Unit Extended Unit Extended UOM Qtt: Price: Amount: Price: Amount: Sq. Ft. 1 15000 $ 20.00 /sq. ft. $ 300,000.00 $ 20.00 /sq. ft. $ 300,000.00 20 Sq. Ft. 3000 Cu. Yd. 1 327 $ 50.00 /hr. $ 1,000.00 $ 20.00 /sq. ft. $ 60,000.00 1 $ 25.00 /cu.yd. $ 8,175.00 $ 369,175.00 1 $ 500.00 1 $ 30.00 /hr. $ 600.00 $ 35.00 /sq. ft. $ 105,000.00 C $ 50.00 /cu.yd. $ 16,350.00 $ 421,950.00 NCI Construction Co.* Unit Extended Price: Amount: $ 33.62 /sq.ft. $ 504,300.00 $ 50.00 Promised date two days after NTP. $ 98.33 /hr. $ 1,966.60 Promised date, two days after NTP, $ 69.22 /sq. ft. $ 207,660.00 i Promised date, two days after NTP. $ 18.50 /cu.yd. $ 6,049.50 Promised date, two days after NTP. $ 719,976.1( *Alternate Bid provided not considerec Approval: Page 3 of 3 epart 17 t Di ector/Designee