HomeMy WebLinkAboutTabulation of BidsItem
No, Description
Securing with plywood and lumber on an
1 as -needed basis
Flat Fee Add -On for Emergency Service
as Requested by Contract Administrator (3
hour response time)
NOTE:
Resecuring building openings previously
secured by Contractor with plywood and
lumber using existing materials, as
requested by Contract Administrator
2 (Labor only)
Securing buildings with concrete block and
stucco in accordance with Florida Building
3 Code on an as -needed basis
Drain and fill-in pools using compressed
4 clean -fill on an as -needed basis
TOTAL:
Ft. 1
TABULATION OF BIDS
IFB NO. 152131: SECURING/BOARDING UP OF VACANT PROPERTY
Royal Regions Incorporation Tropex Construction Services Inc Paul Davis Restoration of Greater Miami
PRIMARY SECONDARY
Est. Unit Extended Unit Extended Unit Extended
Qty-._ I Price: Amount: I Price: Amount: Price: Amount:
15000
201
Ft. 3000
Yd. 1 327
N
0
N
R
E
S
P
0
N
S
V
E
*Deemed non-responsive for failure to
possess the required licenses.
Prepared by: Maritza Suarez, 7/22/09 Page 1 of 3
$ 3.75 /sq. ft. $ 56,250.00 $ 3.92 /sq. ft. $ 58,800.00
$ 50.00
$ 18.00 /hr. $ 360.00 $ 79.37 /hr. $ 1,587.40
$ 12.50 /sq. ft. $ 37,500.00 ® $ 25.00 /sq. ft. $ 75,000.00
$ 65.00 /cu.yd. $ 21,255.00 A $ 23.80 /cu.yd. $ 7,782.60
$ 115,365.00 $ 143,170.00
Approval:
�tt
nt D rector/Designee
Item
No. Description
Securing with plywood and lumber on an
1 as -needed basis
Flat Fee Add -On for Emergency Service
as Requested by Contract Administrator (3
hour response time)
NOTE:
Resecuring building openings previously
secured by Contractor with plywood and
lumber using existing materials, as
requested by Contract Administrator
2 (Labor only)
Securing buildings with concrete block and
stucco in accordance with Florida Building
3 Code on an as -needed basis
Drain and fill-in pools using compressed
4 clean -fill on an as -needed basis
TOTAL:
Prepared by: Maritza Suarez, 7/22/09
I Sq. Ft.
(Hour
TABULATION OF BIDS
IFB NO. 152131: SECURING/BOARDING UP OF VACANT PROPERTY
Trintec Construction Inc.* South Florida Maintenance Sv
Est. Unit Extended Unit Extended
yt'. Price: Amount: Price: Amount:
15000 $ 5.75 /sq. ft. $ 86,250.00 $ 14.00 /sq. ft. $ 210,000.0
Sq. Ft. 3000
Cu. Yd. 1 327
$ 650.00
Minimum trip charge of $350 to apply
$ 65.00 /hr. $ 1,300.00
4 hour minimum to apply
1 $ 25.00 /sq. ft. $ 75,000.00
$ 130.00 /cu.yd. $ 42,510.01
Minimum Transport charge of $85.00
to apply if less than 6 yards of fill
required.
$ 205,060.01
Cost of Aerial lifts if required will be
additional and is not included in unit
$ 22.00 /hr. $ 440.00 j
f $ 6.00 /sq. ft. $ 18,000.00 j
$ 25.00 /cu.yd $ 8,175.00 1
$ 236,615.00 i
Darcon Group Corp.
Unit Extended
Price: Amount:
$ 16.00 /sq. ft. $ 240,000.00
$ 300.00
$ 85.00 /hr. $ 1,700.00 1
$ 43.00 /sq. ft. $ 129,000.00
$ 105.00 /cu.yd. $ 34,335.00
$ 405,035.00 1
r C-1— Vel"
Approval:
Page 2 of 3 epartm t Dir ctor/Designee
Item
No. Description
Securing with plywood and lumber on an
1 as -needed basis
Flat Fee Add -On for Emergency Service
as Requested by Contract Administrator (3
hour response time)
NOTE:
Resecuring building openings previously
secured by Contractor with plywood and
lumber using existing materials, as
requested by Contract Administrator
2 (Labor only)
Securing buildings with concrete block and
stucco in accordance with Florida Building
3 Code on an as -needed basis
Drain and fill-in pools using compressed
4 clean -fill on an as -needed basis
TOTAL:
Prepared by: Maritza Suarez, 7/22/09
TABULATION OF BIDS
IFB NO. 152131: SECURING/BOARDING UP OF VACANT PROPERTY
Green Environmental Sol. & Consulting K.M. Engineering Consultants, Inc
Est. Unit Extended Unit Extended
UOM Qtt: Price: Amount: Price: Amount:
Sq. Ft. 1 15000 $ 20.00 /sq. ft. $ 300,000.00 $ 20.00 /sq. ft. $ 300,000.00
20
Sq. Ft. 3000
Cu. Yd. 1 327
$ 50.00 /hr. $ 1,000.00
$ 20.00 /sq. ft. $ 60,000.00 1
$ 25.00 /cu.yd. $ 8,175.00
$ 369,175.00
1 $ 500.00
1 $ 30.00 /hr. $ 600.00
$ 35.00 /sq. ft. $ 105,000.00
C $ 50.00 /cu.yd. $ 16,350.00
$ 421,950.00
NCI Construction Co.*
Unit Extended
Price: Amount:
$ 33.62 /sq.ft. $ 504,300.00
$ 50.00
Promised date two days after NTP.
$ 98.33 /hr. $ 1,966.60
Promised date, two days after NTP,
$ 69.22 /sq. ft. $ 207,660.00
i
Promised date, two days after NTP.
$ 18.50 /cu.yd. $ 6,049.50
Promised date, two days after NTP.
$ 719,976.1(
*Alternate Bid provided not considerec
Approval:
Page 3 of 3 epart 17
t Di ector/Designee