Loading...
HomeMy WebLinkAboutExhibit 2-SUBTHIS DOCUMENT IS A SUBSTCTUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN + � r AT THE F ND OF THIS DOCUMENT. Substitute Item for RE 1, 2009 OCT -8 Ai 8: 08 Series 2009 Project List for Resolution Exhibit B ,Ano for Draft Preliminary Official Statement Appendix G C1 October 8, 2009 City Commission Agenda (Revisions are Underlined) SERIES 2009 PROJECT District 1 • In the area generally bounded by N.W. 27" Ave, N.W. 7'h St., N.W. 17th Ave., and N.W. 381h St., including the area along N.W. 36th St. from N.W. 27th Ave. west to the City limits, and N.W. 22"d Ave., N.W. 201h St., N.W. 17`h Ave., and State Rd. 836 -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by N.W. 36'h St., N.W. 7th Ave., State Rd. 836, and N.W. 17" Ave. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the area generally bounded by Tamiami Canal to N.W. 3`d St., and N.W. 42nd Ave. to the City limits, and the area generally bounded by N.W. 201h St., N.W. 42nd Ave., N.W. 7th St., and N.W. 27th Ave. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. District 2 • In the areas generally bounded by N.W. 1S' Ave., N.E. 14th St., Biscayne Bay, and Miami River, and N.W. 2nd Ave., N.E. 14'h St., and N.E. 36th St., and Biscayne Bay, and the area generally bounded by N.E. 36'h St., N.E. 87th St., N.E. 4th Ct., and Biscayne Bay -project components include: the design and construction of roadway improvements, including milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and drainage improvements. • In the area of South Miami Ave. Rd. from S.W. 1" Ct. to S. Miami Ave. -project components include: the construction of roadway improvements including street reconstruction, resurfacing, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. SUBMITTED INTO THE U?- oa992- EXE ibitz- sue PUBLIC RECORD FOR ITEMwLI ON /o-� • In the area east of Biscayne Blvd. on N.E. 83`d Rd., 85`h St., and 86th St. -project components include: the design and construction of roadway to include milling and resurfacing, swale restorations, new sidewalks, landscaping and roadway striping. • In an area generally bounded by N.E. 86th St., N.E. 83 Id Terr., Biscayne Blvd., and East Dixie Hwy. -project components include: the construction of roadway improvements, including milling and resurfacing, striping, swale restoration, sidewalk replacement, ADA compliant ramps, and drainage improvements. • In the area generally bounded by N.E. 58th St., N.E. 77th St., N.E. 4th Ct., and Biscayne Blvd. -project components include: the construction of roadway improvements, including, milling and resurfacing, sidewalk replacement, ADA compliant ramps, drainage improvements and landscaping. • In the areas generally bounded by the Miami River, S.W. 1St Ave., Rickenbacker Cswy., and Biscayne Bay, and S.W. 27th Ave., S. Dixie Hwy., Rickenbacker Cswy., and Biscayne Bay, and the area generally bounded by S.W. 24th St., S.W. 27th Ave., N. Prospect Dr., Biscayne Bay, and the City limits to the west -project components include: the design and construction of roadway improvements, including milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage and drainage improvements. • In the area of Bird Ave. from U.S. 1 to Aviation Ave. and McDonald St. from U.S. 1 to Jackson Ave. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, designated bicycle lanes, landscaping, signage, and striping. In the area of Venetian Causeway from Herald Plaza to the City limits -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improvements, landscaping, signage, and striping. In the area known as South Grove -project components include: the design and construction of speed humps and roadway improvements, including milling and resurfacing, swale restoration, drainage improvements, signage, and striping. In the area along U.S. 1 from 19th Ave. to 17th Ave. -project components include: roadway improvements, including milling and resurfacing, curbs, gutters, replacement of the existing roadway wall, and landscaping. � FF rWn W m Z u WZUO L2R0 U � � Z pF a:W A F � xm�F Fr�i000 • In the area known as San Marco and Biscayne Islands -project components include: drainage improvements, roadway improvements, milling and resurfacing, z F curbs, gutters, sidewalk replacement, ADA compliant ramps, swale restoration, w landscaping, signage, and striping, z u z District 3 a v a • In the area along N.W. S. River Dr. from N.W. 1st St. to N.W. 4th St. -project C .a x components include: the design and construction of roadway resurfacing, curbs, z 0 z gutters, drainage improvements, sidewalk replacement, lighting improvements, z v O landscaping,signage, and striping. z V�0 o =— • In the areas generally bounded by N.W. 9th St., N.W. 171h Ave., W. Flagler St., a v Y �, and N.W. 22nd Ave., and N.W. 7th St., N.W. 14th Ct., N.W. 9th St., and N.W. 17th � � m < Ave. -project components include: the design and construction of drainage system, resurfacing, curbs, gutters, sidewalk replacement, ADA compliant ramps, and striping. • In the areas generally bounded by N.W. 9th St., N.W. 12th Ave., W. Flagler St., and N.W. 22"d Ave., and N.W. 7th St., N.W. 22nd Ave., W. Flagler St., and N.W. 27th Ave., and the area generally bounded by S.W. 27th Ave., S.W. 9th St., S.W. 12th Ave., and W. Flagler St. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by S.W. 17th Ave., S.W. 8" St., S.W. 12" Ave., and S. Dixie Hwy.; and S.W. 12th Ave., S.W. 7" St., and N.W. S. River Dr.; and S.W. 7th St., S.W. 12th Ave., and S. Dixie Hwy. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. District 4 • In the area generally bounded by S.W. 16th St., S.W. 27th Ave., S.W. 22nd St., and S.W. 32nd Ave. -project components include road improvements to include sidewalk replacement, curb and/or gutter replacement, ADA compliant ramp construction, swale restoration, landscaping, signage, milling and resurfacing, and striping. • In the areas generally bounded by S.W. 37th Ave., N.W. 7th St., S.W. 27th Ave. and S. W. 24th St., and N.W. 43rd Ave., N.W. 7th St., N.W. 37th Ave., S.W. 8th St., and the area generally bounded by S.W. 27" Ave., S.W. 91h St., S.W. 17th Ave., and S. Dixie Hwy. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. w Z In the area generally bounded by Tamiami Canal Rd., N.W. 3`d St., S.W. 43`d z m v Ave., and S.W. 8th St. -project components include: the design and construction a c of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting F z �_- improvements, landscaping, signage, and striping. z v O In the area known as Shenandoah various intersections -project components include: the construction of traffic circles, including related drainage vim, Q improvements, curbs, gutters, milling and resurfacing, landscaping, and = �- pavement markings. F�nm< In the area known as Flagami various intersections -project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. In the area known as Silver Bluff various intersections -project components include: the construction of traffic circles, including related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, and pavement markings. District 5 In the areas known as Liberty City, Curry Taylor and Buena Vista Heights, generally bounded by N.W. 19th Ave., N.W. 58th St., N.E. 4th Ct., and N.W. 36th St., and N.W. 17th Ave., N.W. 71s' St., N.E. 4th Ct., and N. W. 58th St. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas known as Oak Grove, Little Haiti and Little River, generally bounded by N.W. 7th Ave., N.W. 791h St., N.E. 4th Ct., N.W. 71St St., and N.W. Miami Ct., N.E. 84th St., N.E. 4th PI., and N.E 791h St. -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. In the areas generally bounded by N.W. 7th Ave., N.W. 36`h St., N.W. 1St Ave., and the Miami River, and State Rd. 836, N.W. 7" Ave., and the Miami River, including the areas known as Wynwood and Spring Garden -project components include: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • Northwest Road and Storm Sewer Improvements project in the area generally bounded by N.W. 71st St., N.W. 7th Ave., N.W. 62nd St., and N.W. 12th Ave - project components include: the construction of drainage improvements, milling and resurfacing, curbs, gutters, sidewalks replacement, ADA compliant ramps, and swale restoration. • Buena Vista Heights Improvements Phase II in the area generally bounded by N Miami Ave., N.W. 2nd Ave., N.W. 401h St., and N.W. 46th St. -project components include: the design and construction of roadway improvement, including widening and milling and resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, landscaping, and striping. Multi -District • Citywide -project components include: Miscellaneous sidewalk replacements and construction of ADA compliant improvements. • In the area generally bounded by Biscayne Blvd., Miami Ave., S.E. 2nd St., and N.E. 3 d St., and along N.W. 8th St. from N.W. 2nd Ave to N. E. 2nd Ave. -project components include: the construction of road improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, drainage system improvements, ADA compliant ramp construction, milling and resurfacing, lighting, landscaping, and pavement markings including crosswalks. • In an area generally bounded by N.W. 201h St., State Rd. 836, N.W. 7th Ave., and N.W. 17th Ave. -project components include: the design and construction of roadway improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, milling and resurfacing, and landscaping. • In the area generally bounded by S. 9th St., S. 10th St., S.W. 15tAve., and S.E. 1s' Ave. —project components include: the construction of a pump station and drainage system improvements, roadway improvements, including milling and resurfacing, curbs and/or gutter replacement, and sidewalk reconstruction. Or if such project components cannot be constructed as provided above, such other roadway and sidewalk improvements, as may be determined by the City, including but not limited to milling and resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant improvements, lighting improvements, landscaping, signage, and striping, in the areas described above or in any other areas as may be determined by the City. —. ■waft f1IN, ■ 1,9r Ir SUBSTITUTED SERIES 2009 PROJECT District 1 • In h,ea e generally bounded by N.W. 27"' Ave, N.W. 7"St., N.W. 17"' Ave., and N.W. 38" St., incldin the area along N.W. 36`h St. from N.W. 27t" Ave. west to the City limits, and N.W. 22nd Ave., N.W. 0' St., N.W. 17" Ave., and State Rd. 836 -project components include: the design and constru 'on of roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, 'dewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signa e, and striping. • In the area generally b nded by N.W. 36"' St., N.W. 7'h Ave., State Rd. 836, and N.W. 17`h Ave. - project components inclu e: the design and construction of roadway resurfacing, swale restoration, curbs, gutters,ainage improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, ndscaping, signage, and striping. • In the area generally bounded by Ta%Oiami Canal to N.W. 3`d St., and N.W. 42"d Ave. to the City limits, and the area generally bounde y N.W. 20' St., N.W. 42nd Ave., N.W. 7"' St., and N.W. 27"' Ave. -project components include: t e design and construction of roadway resurfacing, swale restoration, curbs, gutters, drainage %sip"age, ovements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscapingand striping. District 2 • In the areas generally bounded by N.W. 1" Ave., N.E. 14t., Biscayne Bay, and Miami River, and N.W. 2"d Ave., N.E. 141" St., and N.E. 361h St., and Biscay eBay, and the area generally bounded by N.E. 36th St., N.E. 87'h St., N.E. 4t" Ct., and Biscayn Bay -project components include: the design and construction of roadway improvements, ' cluding milling and resurfacing, curbs, gutters, striping, swale restoration, sidewalk re acement, ADA compliant ramps, lighting improvements, landscaping, signage, and drainage im rovements. • In the area of South Miami Ave. Rd. from S.W. 1St Ct. to 5. Miami Ave.-pro),qct components include: the construction of roadway improvements including street reconst%iction, resurfacing, drainage improvements, sidewalk replacement, ADA compliant ramps, lightingnprovements, landscaping, signage, and striping. SUBSTITUTED • In the area east of Biscayne Blvd. on N.E. 83" Rd., 85"' St., and 86" St. -project components include: the design and construction of roadway to include milling and resurfacing, swale \ restorations, new sidewalks, landscaping and roadway striping. • 1 an area generally bounded by N.E. 86'h St., N.E. 83`d Terr., Biscayne Blvd., and East Dixie Hwy. -pr 'ect components include: the construction of roadway improvements, including milling and resu ing, striping, swale restoration, sidewalk replacement, ADA compliant ramps, and drainage improvements. • In the area ge erally bounded by N.E. 58'h St., N.E. 77"' St., N.E. 4th Ct., and Biscayne Blvd. - project componis include: the construction of roadway improvements, including, milling and resurfacing, siclZ k replacement, ADA compliant ramps, drainage improvements and landscaping. • In the areas generally bou ed by the Miami River, S.W. 1st Ave., Rickenbacker Cswy., and Biscayne Bay, and S.W. 27" Ave., S. Dixie Hwy., Rickenbacker Cswy., and Biscayne Bay, and the area generally bounded by S.Nanesurfacing, 'h W. 27'h Ave., N. Prospect Dr., Biscayne Bay, and the City limits to the west -projes include; the design and construction of roadway improvements, including millcurbs, gutters, striping, Swale restoration, sidewalk replacement, ADA cps, lighting improvements, landscaping, signage and drainage improvements. • In the area of Bird Ave. from U.S. 1 to Aviationve. and McDonald St. from U.S. 1 to Jackson Ave. -project components include: the design an construction of roadway resurfacing, Swale restoration, curbs, gutters, drainage improvements, idewalk replacement, ADA compliant ramps, lighting improvements, designated bicycle Ian landscaping, signage, and striping. • In the area of Venetian Causeway from Herald Plaza to the 'ty limits -project components include: the design and construction of roadway resurfacing,ale restoration, curbs, gutters, drainage improvements, sidewalk replacement, lighting improve ents, landscaping, signage, and striping. • In the area known as South Grove -project components include: the de"14n and construction of speed humps and roadway improvements, including milling and resurfacin'g, swale restoration, drainage improvements, signage, and striping. • in the area along U.S. 1 from 19'h Ave. to 17'h Ave. -project components include: rN improvements, including milling and resurfacing, curbs, gutters, replacement of the roadway wall, and landscaping. SUBSTITUTED In the area known as San Marco and Biscayne Islands -project components include: drainage improvements, roadway improvements, milling and resurfacing, curbs, gutters, sidewalk replacement, ADA compliant ramps, Swale restoration, landscaping, signage, and striping. District 3 • In the are along N.W. S. River Dr. from N.W. 1" St. to N.W. 4"' St, -project components include: the design a d construction of roadway resurfacing, curbs, gutters, drainage improvements, sidewalk repla ement, lighting improvements, landscaping, signage, and striping. • In the areas genera bounded by N.W. 91h St., N.W. 17'h Ave., W. Flagler St., and N.W. 22"d Ave., and N.W. 7'h St., N.W. 4"' Ct., N.W. 9"' St., and N.W. 17'h Ave. -project components include: the design and construction f drainage system, resurfacing, curbs, gutters, sidewalk replacement, ADA compliant ramps, an triping. • In the areas generally bounded y N.W. 9"' St., N.W. 12'h Ave., W. Flagler St., and N.W. 22nd Ave., and N.W. 7"' St., N.W. 22"d Ave., . Flagler St., and N.W. 27" Ave., and the area generally bounded by S.W. 27'h Ave., S.W. 9 t., S.W. 12'h Ave., and W. Flagler St. -project components include: the design and construction roadway resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk repla ment, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by S.W. 17'h Ave. S.W. 8"' St., S.W. 12'h Ave., and S. Dixie Hwy.; and S.W. 12th Ave., S.W. 7th St., and N.W. S. River r,; and S.W. 7"' St., S.W. 12'h Ave., and S. Dixie Hwy. -project components include: the design nd construction of roadway resurfacing, swale restoration, curbs, gutters, drainage improveme ts, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, si age, and striping. District 4 • In the area generally bounded by S.W. 16'hSt,, S.W. 27th Ave., S.W.nd St., and S.W. 32nd Ave. - project components include road improvements to include sidewalk lacement, curb and/or gutter replacement, ADA compliant ramp construction, swale restoratio ,landscaping, signage, milling and resurfacing, and striping. • In the areas generally bounded by S.W. 37'h Ave., N.W. 7'h St., S.W. 27th Ave. a S. W. 24th St., and N.W. 43`d Ave., N.W. 7`h St., N.W. 37`h Ave., S.W. 8th St., and the area general bounded by S.W. 27th Ave., S.W. 9' St., S.W. 17th Ave., and S. Dlxie Hwy. -project components in ude: the design and construction of roadway resurfacing, swale restoration, curbs, gutters, dra age improvements, sidewalk replacement, ADA compliant ramps, lighting improvements, landscaping, signage, and striping. SUBSTITUTED In the area generally bounded by Tamiami Canal Rd., N.W. 3`" St., S.W. 43`d Ave., and S.W.. 8'h St. -project components include: the design and construction of roadway resurfacing, Swale rstoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ra ps, lighting improvements, landscaping, signage, and striping. • In the a ea known as Shenandoah various intersections -project components include: the construc%ag, f traffic circles, including related drainage improvements, curbs, gutters, milling and resulandscaping, and pavement markings. • In the area knowas Flagami various intersections -project components include: the construction of tra'c circles, including related drainage improvements, curbs, gutters, milling and resurfacing, lands ping, and pavement markings. • In the area known as Silver tuff various intersections -project components include: the construction of traffic circles, ' cluding related drainage improvements, curbs, gutters, milling and resurfacing, landscaping, an pavement markings. District 5 • in the areas generally bounded by N.W. 1 h Ave., N.W, 58`h 5t., N.E. 4'h Ct., and N.W. 36'h St., and N.W. 17" Ave., N.W. 71S` St., N.E. 4`h Ct., nd N. W. 58"' St. -project components include: the design and construction of roadway resurfa ing, Swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA comp ' nt ramps, lighting improvements, landscaping, signage, and striping. • In the areas generally bounded by N.W. 7"' Ave., N.W. 79 St., N.E. 4`h Ct., N.W. 71St St., and N.W. Miami Ct., N.E. 84`h St., N.E. 4`h PI., and N.E 79`h St. -pr 'ect components include: the design and construction of roadway resurfacing, Swale rest\'on,urbs, gutters, drainage improvements, sidewalk replacement, ADA compliant rampg improvements, landscaping, signage, and striping. • in the areas generally bounded by N.W. 7'h Ave., N.W. 361h St., N.W. 1" e., and the Miami River, and State Rd. 836, N.W. 7`h Ave., and the Miami River -project comp vents include: the design and construction of roadway resurfacing, Swale restoration, curbs, gu e", drainage improvements, sidewalk replacement, ADA compliant ramps, lighting improve ents, landscaping, signage, and striping. • In the area generally bounded by N.W. 71" St., N.W. 7'h Ave., N.W. 62nd St., and N.W. 1111h Ave - project components include: the construction of drainage improvements, milling and SUBSTITUTED resurfacing, curbs, gutters, sidewalks replacement, ADA compliant ramps, and swale restoration. • In the area ger►erally bounded by N. Miami Ave., N.W. 2nd Ave., N.W. 401h St., and N.W. 46", St. - project components include: the design and construction of roadway improvement, including widening and milling and resurfacing, Swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant ramps, landscaping, and striping. Multi -District • Citywide -project components include: Miscellaneous sidewalk replacements and construction of ADA compliant improvements. • In the area generally bounded by Biscayne Blvd., Miami Ave., S.E. 2nd St., and N.E. 3`d St. -project components include: the construction of road improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, drainage system improvements, ADA compliant ramp construction, milling and resurfacing, lighting, landscaping, and pavement markings including crosswalks. • In an area generally bounded by N.W. 201h St., State Rd. 836, N.W. 7th Ave., and N.W. 17`h Ave. - project components include: the design and construction of roadway improvements, such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, milling and resurfacing, and landscaping. • In the area generally bounded by S. 91 St., S. 10" St., S.W. 1" Ave., and S.E. V Ave. —project components include: the construction of a pump station and drainage system improvements, roadway improvements, including milling and resurfacing, curbs and/or gutter replacement, and sidewalk reconstruction. Or if such project components cannot be constructed as provided above, such other roadway and sidewalk improvements, as may be determined by the City, including but not limited to milling and resurfacing, swale restoration, curbs, gutters, drainage improvements, sidewalk replacement, ADA compliant improvements, lighting improvements, landscaping, signage, and striping, in the areas described above or in any other areas as may be determined by the City.