Loading...
HomeMy WebLinkAboutMemoMemorandum "® Date: May 6, 2009 To: Lisa Spadafina, Manager Coastal Resources Section From: Wilbur Mayorga P.E., Chief Pollution Control Division Subject: Revised Spoil Management and Disposal Plan dated April 16, 2009 and submitted by Consulting Engineering and Sciences Inc., for the proposed Maintenance Dredging for the City of Miami's Ademar and Davis Canals (Permit CCO2-390). The Pollution Control Division (PCD) has reviewed the revised Spoil Management and Disposal Plan received April 16, 2009 for the above referenced project and approves the plan with the following conditions: 1. Free water collected in the lined water collection sump (storm water pond) shall be sampled and the samples analyzed for copper and zinc. The sample results along with a disposal plan shall be submitted for DERM review and approval prior to the material being disposed. The 1 inch soil cover placed atop the 40 mil containment liner shall be properly disposed along with the dried sediment and the containment liner. Be advised that since the sediments were not characterized then disposal shall be to a lined landfill. Copies of the disposal receipts shall be submitted to the DERM. Be advised that final approval for disposal at a landfill must be obtained from the landfill operator. For approval for disposal at a Miami -Dade County owned landfill, contact Lee Casey, Department of Solid Waste Management, at (305) 594-1500. 3. Given that the trucks will actually access the containment area during loading, DERM requires a truck wheel wash station to be configured into the design prior to the trucks exiting the containment area. If you have any questions concerning the above contact Loma Bucknor at (305) 372-6700.