HomeMy WebLinkAboutMemo 1TO Pedro G. Hernandez, P.E. City Manager FROPA : Ola O. Aluko CIP Director CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM DATE : June 11, 2009 SUBJECT: Amend List of Projects under Economic Stimulus Ordinance REFERENCES: Ordinance No. 13045 ENCLOSURES: FILE : The Department of Capital Improvements Program (CIP) wishes to amend the list of projects under the Economic Stimulus Program enacted December 12, 2008 by the City Commission. Please see below scope of work for those projects being added to Attachment A- 6/25/09 (Revised). Construction South Police Substation Hurricane Protection Upgrade Project, B-30592 The project consists of providing hurricane protection for the windows and the circular main front entrance at the 2 -story police substation. Phase I includes the preparation of a design analysis report to retrofit the building with protective screening and impact resistant window/glass system. Phase II includes the purchase and installation of a selected system based on the Phase I report. This project is located at 2200 West Flagler Street. • North Police Substation Hurricane Protection Upgrade Project, B -30592A Project consists of providing hurricane protection for the windows and front entrance at the existing 2 -story police substation. Astorino will provide Design Analysis for retrofitting building with storm panels, shutters and/or impact resistant glass. This project is located at 1000 NW 62nd Street. Stadium Parking Garage- CM@Risk, B-30648 The project consists of the construction of the proposed Parking Structures and surface lots bound by NW 7th Street to the north, NW 3rd Street to the south, NW 17th Avenue to the west, and NW 14th Avenue to the east. The four parking structures will consist of multi- level parking structures (designated P1, P2, P3, and P4). In addition there will be six associated surface parking lots located to the east and west of the site. The P1 and P2 structures will have five parking levels, and the P3 and P4 structures will have six parking levels (inclusive of the ongrade parking in both cases). The structures will include approximately 60,000 ft' for retail space on the ground floors of structures P1 and P2. Fairlawn Storm Sewer Improvements Project, B-50704 The project consists of the construction of a storm sewer system including road improvements such as damaged sidewalk replacement, damaged curb and/or gutter replacement, ADA compliant ramp construction, re -sod of swales, milling & resurfacin th th g Selected roads bounded by W. Flagler Street to SW 8Street, SW 47Avenue to SW 57 h Avenue. Kinloch Storm Sewer Improvements Project, B-50705 The project includes storm sewer and road improvements and is divided into two phases: Phase I consists of exfiltration trenches, manholes, inlets, cross drains, swale trenches, and surface restoration. Phase II consists of a connection to an existing outfall, old exfiltration trenches will be replaced with new ones, manholes, inlets, swale trenches and surface restoration. Phase I and II will also include road improvements with street blocks only impacted by the drainage construction. Design 77-1 Dinner Key Marina Dockmaster Building, B-60464 Design and Construction of a new Dock Master's office at Dinner Key Marina. The Design Phase consists of drawings, permits and specification to accommodate a three story building facility to serve as the Dinner Key Marina and Harbormaster's (Mooring) administration building, done in accordance to federal, State, and local building codes. The first floor will support limited parking, a handicap accessible elevator, laundry facilities, stairwell access, and storage room. The second floor will house a customer lounge/computer access area, library, and customer showers/restrooms area and possible customer convenience store. The third floor will also allow access to an outdoor balcony with a wing. Total square footage is estimated at 6,900 (Gross Area). The project is located at 3400 Pan American Drive. Professional Services Solicitation • NE 2nd Avenue CEO Services, B-78508 Consultant shall provide construction engineering and observation services as required during the Construction Work on NE 2nd Avenue. This project is receiving federal stimulus funds as part of the 2009 American Reinvestment and Recovery Act (ARRA) designed to stimulate the national economy.