HomeMy WebLinkAboutScrivener's Error MemoCITY OF MIAMI
OFFICE OF THE CITY ATTORNEY
MEMORANDUM
TO: Todd B. Hannon, City Clerk
FROM: Victoria Mendez, City Attorney % t for
DATE: March 6, 2024
RE: Resolution No. 23-0543 — Execute Agreement - Off System Construction and
Maintenance.
File No. 14974
At its December 14, 2023, meeting, the City Commission adopted the above referenced
agenda item, RE.2, authorizing the City Manager to execute an Off -System Construction and
Maintenance Agreement, with the Florida Department of Transportation, for the Project on State
Road 5 / Biscayne Boulevard from south of Northeast 5 Street to south of Northeast 11 Street,
Miami, Florida, which includes improvements on roads not on the state highway system and
Local Roadway Improvements. The Exhibit inadvertently printed without the last two pages.
The complete Exhibit "A" has been uploaded to the file and the file has been incremented
to Revision A.
VM/EMH/vja
Enclosure(s)
I 41-1 aner Erito(
FM# 443911-1-52-01
Page 1 of 13
OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT
Between
STATE OF FLORIDA, DEPARTMENT OF TRANSPORTATION
("DEPARTMENT")
and
The City of Miami, a Miami -Dade County, Florida municipality
("The City")
__ram
co
ui
THIS AGREEMENT is made and entered into as of August 22, 2023, by and through the STATE OF
FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida (the
"Department"), and The City of Miami a municipality (the "City"), collectively referred to as the
"Parties.
RECITALS
A. Upon approval of the Department's Work Program by the State of Florida Legislature,
and adoption by the Department Secretary, the Depai talent shall complete the various projects included
in the Department Work Program; and
B. Included in the Department Work Program is Project Number FM# 443911-1-52-01, SR-
5 from South ofNE 5th Street to South ofNE 1 lth Street (the "Project"). A portion of the Project includes
work on NE loth street, in the City of Miami, Miami -Dade County, Florida, a road not on the State
Highway System (See Attachment A); and
C. The City is the holder of ownership rights to NE 10th Street, a road not on the State
Highway System; and
D. The Parties agree that it is in the best interest of each party for the Department to
undertake and to complete all aspects of the Project, including but not limited to, the design, construction,
construction inspection, maintenance during construction, utilities, easements, and other associated
tasks; and
E. The Parties further agree that it is in the best interest of each party to enter into this
Agreement in order to allow the Department to construct and complete the Project.
Rev. 6/22 1
FM# 443911-1-52-01
Page 2 of 13
TERMS
NOW THEREFORE, in consideration of the premises, the mutual covenants and other valuable
considerations contained herein, the receipt and sufficiency of which are hereby acknowledged, the
Parties agree as follows:
1. The recitals in this Agreement are true and correct, and incorporated into and made a part hereof.
2. The Parties agree that the Depth t►iient intends to undertake and complete Project Number FM#
443911-1-52-01 which generally includes the following:
• Milling and resurfacing of the roadway pavement
• Upgrading the curb ramps according to the American with Disabilities Act
• Upgrading the drainage system by replacing the two drainage pumps and installing drainage
pipes and inlets according to plans_
• Upgrading the signing and pavement markings; and
• Upgrading the pedestrian signals at the intersections to meet standards.
The Project shall include improvements on NE 10th Street, from Sta 120+66.43 to Sta
120+95.31 and extending approximately 32 feet west of the FDOT right of way (for purposes
of this agreement, the "Off -System Project Limits"). The work within the Off -System Project
Limits shall include, but may not be limited to the following (hereinafter referred to as the
"Local Roadway Improvements"):
a) Installation of drainage inlet structures S-57 and S-59
b) Installation of 14" x 23: elliptical pipes connecting new drainage inlets to existing
drainage structures.
c) Installation of curb and gutter along NE l 0th Street
The Project shall further include all activities associated with or arising out of the construction
of the Local Roadway Improvements. In the event that the Project requires the acquisition of
additional right-of-way within the Off -System Project Limits, the Department shall acquire such
right-of-way in order to complete the Project. The City shall cooperate with and shall support the
Department's work efforts in this regard.
Rev. 6/22 2
FM# 443911-1-52-01
Page 3 of 13
n 7V• LID
-a
The Department will design and construct the _project in accordance with all applicable federal
and state laws and regulations and in accordance with Department design and construction
standards as set forth in the Department's guidelines, standards, and procedures. The Department
shall have final decision authority with respect to the design, the design review process, and
construction of the Local Roadway Improvements, and the relocation of any utilities that the
Department may determine to be required.
3. The Parties acknowledge and agree that the City will review the Project Design Plans ("Project
Design Plans") and shall submit its comments, if any, via Electronic Reviewer Comments
("ERC"). The Department shall provide the City access to the ERC, and the Department shall
use the ERC to submit the Project Design Plans for the City to review. When the Department
places the Project Design Plans in the ERC, the Department will designate a Comment Due Date
and a Response Due Date. The City shall submit its comments with regards to the Project Design
Plans on or before the Comment Due Date, and the Department shall respond to the City's
comments, if any, on or before the Response Due Date. If the City does not submit its comments
by the Comment Due Date, the City will be deemed to have approved the Project Design Plans
submitted by the Department. The review process for the Project Design Plans will be deemed
concluded when the Department has submitted the Final Project Design Plans to the ERC, and
the Comment Due Date and Response Due Date for the Final Project Design Plans have passed,
and the Department has addressed all of the City's comments that were submitted through the
ERC. Once the review process is concluded, the Department will construct the Project in
accordance with the Final Project Design Plans submitted through the ERC. The City
acknowledges and agrees that, during construction of the Local Roadway Improvements, the
Department will only utilize the services of law enforcement officers when required by the
Department's Standard Specifications for Road and Bridge Construction, and no additional
requirements will be imposed. No further agreements or permits shall be required for production
or construction of this Project.
Major modifications of the approved Project Design Plans must be submitted to the City for
review. A "Major Modification" is any modification that materially alters the kind or nature of
the work depicted in the approved Project Design Plans, or that alters the integrity or
maintainability of the Local Roadway Improvements, or related components. The City 's review
shall be within the reasonable time schedule proposed by the Department, in order to avoid delay
Rev. 6/22 3
FM# 443911-1-52-01
Page 4 of 13
to the Department's construction contract. In the event that. any Major Modifications are required
during construction, the Department shall be entitled to proceed with the modifications that are
necessary to complete the construction of the Project, and shall, upon identifying the need for a
Major Modification, immediately notify the City of the required changes prior to proceeding with
implementation of the same. It is specifically understood and agreed that any such changes during
construction shall not delay nor affect the timely construction schedule of the Project.
4. The City agrees to fully cooperate with the Department in the construction, reconstruction and
relocation of utilities that are located within the City's right-of-way, within the Off -System
Project Limits. The utility relocations, if any, which may be required by the Department for the
purposes of the Project, shall be done in accordance with the Department's guidelines, standards
and procedures. The Department shall submit the proposed utility relocation schedule to the City.
Utility relocations, if any, shall be done in accordance with the provisions of Chapter 337, F. S.
Additionally, the City agrees to fully cooperate with the Department in the removal of any
encroachments or permitted improvements, and in the modification of any driveway connections,
located within the City's right-of-way, within the Off -System Project Limits, that are in conflict
with the Project, and the City hereby authorizes the Department to take any legal action necessary
to effectuate the removal of any such conflicting encroachments or permitted improvements, and
to effectuate the modification of any such driveway connections.
The Department shall coordinate with the City for said removals or modifications, at no cost to
the City.
5. The City agrees to perpetually maintain the Local Roadway Improvements. To maintain means
to perform normal maintenance operations for the preservation of the Local Roadway
Improvements, which shall include but is not limited to, roadway surfaces, shoulders, roadside
structures, drainage, signing and pavement markers, lighting, and such traffic control devices as
are necessary for the safe and efficient use of the Local Roadway Improvements.
Additionally, the Parties understand and agree that the Department shall transfer any permit(s)
required for the construction of the Local Roadway Improvements, if any, to the City as the
operational maintenance entity, and the City agrees to accept said transfer and to be fully
responsible to comply with all operational and maintenance conditions of the permit(s), at its sole
cost and expense.
Rev. 6/22 4
FM# 443911-1-52-01 LJ
Page 5 of 13
Notwithstanding the requirements hereof, maintenance during construction shall be the
responsibility of the Department and its Contractor,` as sets forth in paragraph 9 of this Agreement.
6. The Parties acknowledge and agree that the City 's right-of-way and the improvements and
structures located within the City's right-of-way, are and will remain under the ownership of the
City, and that the Department will not have any ownership interest in the right-of-way,
improvements, or structures located thereon or installed therein pursuant to this Project.
7. The Department shall require its construction Contractor to maintain, at all times during
construction, Commercial General Liability insurance providing continuous coverage for all
work or operations performed under the construction contract. Such insurance shall be no more
restrictive than that provided by the latest occurrence form edition of the standard Commercial
General Liability Coverage Form (ISO Form CG 00 01) as filed for use in the State of Florida.
The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a
$5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess
policy, or such other minimum insurance coverage that may be required by the Department for
the construction of the Project, in accordance with the Department's Standards and Specifications
for Road and Bridge Construction. The Department shall further cause its Contractor to name
the City and the Department as additional insured Parties on the afore -stated policies, and to
provide evidence of Workers' Compensation Insurance in accordance with the laws of the State
of Florida and in amounts sufficient to secure the benefit of the Florida Workers' Compensation
law for all employees.
8. The Depaitalent shall notify the City at least 48 hours before beginning construction within the
City's right-of-way. Such notification may be provided via email to the Department of
Resiliency and Public Works, and the notice requirements set forth in paragraph 20 shall not
apply to this paragraph.
The Department agrees that the City may, at reasonable times during the construction of the Local
Roadway Improvements, inspect the Contractor's construction site and perform such tests as are
reasonably necessary to determine whether the goods or services required to be provided by the
Contractor, pursuant to the Contractor's Construction Agreement with the Department, conform
to the terms of said Construction Agreement. Upon request by the City, the Department shall
coordinate with its Contractor to provide access to the City for performance of said inspections.
During the construction work related to the Project, the City shall fully cooperate with any such
Rev. 6/22 5
FM# 443911-1-52-01
Page 6 of 13
__MTh
P _ 7DzA
work being performed by the Department and the De_partfi is contractors. The City shall not
commit nor permit any act which may delay or interfere with the performance of any such work
by the Department or the Department's contractors, unless the Department agrees in writing that
the City may commit, or permit said act.
9. Maintenance during construction within the Off -System Project Limits, commencing as of the
first date of construction, shall be the responsibility of the Department's
Contractor. Notwithstanding, neither the Department nor its Contractor shall be responsible for
mowing or removing litter during construction of the Project. After completion of construction,
the City shall assume all maintenance responsibilities for the Local Roadway Improvements.
Upon completion of construction, the Department is required to invite the City on the Final
Inspection of the work within the Off -System Project Limits and will incorporate legitimate City
concerns that are within the scope of the contract into the final Project punch list to be corrected
by the Contractor. Notice for Final Inspection shall be delivered via email to the Department of
Resiliency and Public Works and the notice provision of paragraph 20 shall not be
applicable. However, if the City does not attend the Final Inspection, the Department shall
proceed to conduct the Final Inspection, finalize the Project punch list, and issue a Notice of
Final Acceptance to its Contractor. The Final Inspection shall be performed, and the Notice of
Final Acceptance shall be issued in accordance with the Department's Standard Specifications
for Road and Bridge Construction and the Construction Project Administration Manual
(CPAM).
Upon issuance of the Notice of Final Acceptance to the Contractor, the Department shall provide
a copy of said notice to the City As of the date of the Notice of Final Acceptance, the City shall
be immediately responsible for the maintenance of the Local Roadway Improvements and shall
further accept the Local Roadway Improvements. The Department, however, shall have the right
to assure completion of any punch list by the Contractor. Notwithstanding the issuance of the
Notice of Final Acceptance, the City may notify the Department Project Manager of deficiencies
in the Local Roadway Improvements that may be covered by the warranty provisions in the
contract between the Department and its Contractor. The Department shall enforce the warranty
if remedial action is required by the warranty provisions, as determined by the Department.
Upon completion of all work related to construction of the Project, the Department will be
required to submit to the City final as -built plans for the Local Roadway Improvements and an
Rev. 6/22 6
FM# 443911-1-52-01
Page 7of13
c 8: Os
engineering certification that Optistruction was„ completed in accordance with the plans.
Additionally, the Department shall vacate those portions of the City's right-of-way used to
construct the Local Roadway Improvements, and shall remove the Department's property,
machinery, and equipment from said portions of the City's right-of-way. Furthermore, the
Department shall restore those portions of the City's right-of-way disturbed by Project
construction activities to the same or better condition than that which existed immediately prior
to commencement of the construction of the Project.
10. Upon submission by the Department of a deed, with accompanying sketch and legal description,
for the transfer to the City of any additional right-of-way acquired by the Department within the
Off -System Project Limits, the City shall forthwith submit the same to its governing board or
commission for approval and acceptance of such additional right-of-way.
11. This Agreement shall become effective as of the date both parties hereto have executed the
Agreement. Prior to commencement of construction, the Department may in its sole discretion
terminate this Agreement if it determines that it is in the best interest of the public to do so. If
the Department elects to terminate this Agreement, the Department shall deliver formal notice of
termination to the City as set forth in paragraph 20 of this Agreement.
12. In the event that any election, referendum, approval, ratification, notice or other proceeding, or
authorization is required to carry out the Project, the City agrees to expeditiously initiate and
consummate, as provided by law, all actions necessary with respect to any such matters, with
time being of the essence.
13. The Department may utilize federal funds to design and construct the Project. In the event that
the Project shall be constructed using federal funds, all costs incurred must be in conformity with
applicable federal and state laws, regulations, and policies and procedures.
14. The Department's performance and obligations under this Agreement are contingent upon an
annual appropriation by the Legislature. If the Department's funding for this Project is in multiple
fiscal years, funds approval from the Department's Comptroller must be received each fiscal year
prior to costs being incurred.
15. In the event that this Agreement is in excess of $25,000, and the Agreement has a term for a
period of more than one year, the provisions of Section §339.135(6)(a), Florida Statutes, are
hereby incorporated into this Agreement and are as follows:
Rev. 6/22 7
Rev. 6/22
FM# 443911-1-52-01
Page 8 of 13
TN 8.05
"The department, during any fiscal yea!, shall not expend money, incur any liability, or enter
into any contract which, by its terms, inv-olves:tia expenditure of money in excess of the amounts
budgeted as available for expenditure during any such fiscal year. Any contract, verbal or
written, made in violation of this subsection is null and void, and no money may be paid on such
contract. The department shall require a statement from the comptroller of the department that
funds are available prior to entering into any such contract or other binding commitment of
funds. Nothing herein contained shall prevent the making of contracts for periods exceeding 1
year, but any contract so made shall be executory only for the value of the services to be rendered
or agreed to be paid for in succeeding fiscal years; and this paragraph shall be incorporated
verbatim in all contracts of the department which are for an amount in excess of $25, 000 and
which have a term for a period of more than 1 year."
16. The Department is a state agency, self -insured and subject to the provisions of Section 768.28,
Florida Statutes. Nothing in this Agreement shall be deemed or otherwise interpreted as waiving
the Department's sovereign immunity protections, or as increasing the limits of liability as set
forth in Section 768.28, Florida Statutes.
17. A modification or waiver of any of the provisions of this Agreement shall be effective only if
made in writing and executed with the same formality as this Agreement.
18. This Agreement shall be governed by the laws of the State of Florida. Any provision hereof
found to be unlawful or unenforceable shall be severable and shall not affect the validity of the
remaining portions hereof. Venue for any and all actions arising out of or in any way related to
the interpretation, validity, performance or breach of this Agreement shall lie exclusively in a
state court of appropriate jurisdiction in Leon County, Florida.
19. No term or provision of this Agreement shall be interpreted for or against any party because that
party's legal counsel drafted the provision.
20. In accordance with Executive Order No. 11-02 the Department's Vendor/Contractor(s) shall
utilize the U.S. Department of Homeland Security's E-Verify system, in accordance with the
terms governing use of the system, to confirm the employment eligibility of.
i. all persons employed by the Vendor/Contractor during the term of the Contract to
perform employment duties within Florida; and
ii. all persons, including subcontractors, assigned by the Vendor/Contractor to perform
work pursuant to the contract with the Department.
8
FM# 443911-1-52-01
Page 9 of 13
21. All notices required pursuant to the terms hereof, shall be in writing and shall be sent by first
class United States Mail, facsimile transmission, hand delivery or express mail. Notices shall be
deemed to have been received by the end of five (5) business days from the proper sending thereof
unless proof of prior actual receipt is provided. Unless otherwise notified in writing, notices shall
be sent to the following:
To the City:
Arthur Noriega
Miami City Manager
444 SW 2nd Ave
Miami, FL, 33130
To the Department:
Director of Transportation Operations
State of Florida, Department of Transportation
1000 N.W. 111th Avenue
Miami, Florida 33172
C')
22. The City, by and through Resolution No. , attached hereto as Exhibit "
15
has duly authorized the execution and delivery of this Agreement and agrees to be bound by the
terms hereunder, and has further authorized the Mayor or his designee to take all necessary steps
to effectuate the terms of this Agreement.
Rev. 6/22 9
FM# 443911-1-52-01
Page 10 of 13
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the dates
exhibited, by the signatures below.
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
By: By:
Name:
Title:
Name:
Title: Director of Transportation Operations
Date: Date:
Attest:
Name:
Title:
Approved as to form and legality: Department Legal Review:
By:
Name:
•i
Rev. 6/22 10
j 4
CITY OF MIAMI,
a Florida municipal corporation
ATTEST:
BY:
ToddB.FIa
City Clerk
Arthur . Nflega
City Manager
APPROVED AS TO LEGAL FORM AND APPROVED AS TO INSURANCE
CORRECTNESS:
BY:
•--t)-t-)r)
Victoria Mendez
A/C -Rif
City Attorney
#23-2455
REQUIREMENTS:
BY:
Anne -Marie Sharpe, Director
Risk Management
71.
--C")co
(11
ATTACHMENT A
ATTACHMENT A
"O
r-
117
Co
LEGEND
I I
Limits of Off System Agreement
+65.75
142.64' LT,
EXIST. 18" PIPE
+56.31
END C&G TYPE p 143.84' LT.
MATCH EXIST. CURB VVH1
STA. +66,43
124.31LT.
CONST. 14"x23"
ELLIP. PIPE
EXIST. 42" yvP HIP2E
R/W LINE 1 VVH2A
• " 4114
EX.IT,•98T!Ct,4i4LE WARN INC •"
‘...) (TO BE REPLACED) 31
' ---- ..... . .. • • 1"
344
US-1/SR-.5 (SB)
tg 5R-5
.+15A
+15.47
14.96' LT
, 34 47
r •Yr ,e • 4 92' LT
4
US-1/SR-5 (NB) (NB) 0-/
+39 97
88.02' RT,
EXIST. DETECTABLE WARNING
(TO BE REPLACED)
+67.78
87.69' RT.
-
PAVERS
DETECTABLE WARNINGS
MILLING 5 RESURFACING
RECONSTRUCTION
BOLLARD
REVISIONS
6 54
15 11 RT
,‘478 17
• 15.11' RT
+18.77
90
// 39
"/6 it/
39
/6 63' RT.
EXIST 18" PIPE OPENING
TO BE PLUGGED
+94.46
143.86' LT,
EIV05;&)G• TYPE F
MATCH EXIST. CURB ° I° Feet
EXIST. TO BE REMOVED
+98.67
144 07' LT.
127.88' LT.
STA +95.31 40
ELLIP PIPE Er 0X1 c 085 RNET isl wNRTG tm3P 16:1 .vp:6:01 p. E.. , ,,,. . . .., „,..0 1.7 7 :. i ... ,
VV131 ,4 ... t , .,, t i
CONST 14"x23" .r.'-'1 i Y CI! '. E :- •
'-tiblelgiTMEVISL,FgRiT2-L.g. .,„ _ _
5.4.p.: J....T..„-------- 7 -
vvn,s
+aviv.767. :---
+783
94.12' LT
;01411 29 3. •
II '3 LT 8',„•'',:j• ,i,',.,,,
Oft/
OHO '
"L. 42"uP/137".....7"-`• ZAICIIFE'4X4/1"77CEURF' 4.8"
+97,39 STA.
34 49
+77.49
.... IT, •
EXIST. DETECTABLE WARNING -
(TO BE REPLACED)
BEGIN C&G 7 YPE F +77.80
MATCH EXIST. CUR 19 61' RT.
Innir,
51/ '. 4.,S.P4' 1Vi3z6'
, • • • +37.5
C5318 . 94 8 77.91' RT.
7.35 +56.20;
46.53 RT. gl VIRIZOli TO AD.ILI5sTrApUg08X8
77.44'
17.41 +03.85
vvi 17
EXIST. DETECTABLE
WARNING
(TO BE REPLACED)
+00.10
85,57' RT.
CONST. 30" PIPE
°EXIST. WV (TO BE ADJUSTED BY MDWASD)
C)EXIST. SEWER MH (TO BE ADJUSTED BY MDWASD)
°EXIST. STORM MH (TO BE ADJUSTED BY CONTRACTOR)
°EXIST MH (TO BE ADJUSTED BY FPL)
()EXIST. SEWER VALVE (TO BE ADJUSTED BY MWASSTD)"3.5.
MAURICE A. FERRE PARK . '
ENGINEER OF RECORD
DATE
DESCRIPTION
DATE
DESCRIPTION
GODFREY A. O. LAMPTEY, P.E., PTOE
LICENSE NUMBER 68261
GOAL ASSOCIATES INC.
14750 NW 7/171 COURT. SUITE 320
MIAMI LAKES, FL 33016
+77.05
13,03 LT.
444.10
CONST. 36" PIPE
+75.29
67.10' RT.
+58.12
8.45' or
'" 7 "1 8 • j
'6400' LT
CONST .36' PIPE
+84 09
63 86' i7
, ''+26.01' 071110A ....,
,
.
+VI 88 . , n
,t,.'
END C&G TYPE 1
66 14' ir , '",63.
"." • • • • • ..7`,.9 r
.771.
MATCH EXIST olt,P..,
.. STA +25 81 ., - / 9
BEG431 C&G TYPE F
32 85' LT
CO1g7;47.36" PIPE
722 1,13'
END C&G TT PE I.
MATCH EXIST CURL:
•SrA 14015.98
15 1.21-T.
13.10' LT,
+86.88
19.49' RE
END C&G TYPE F
MATCH EXIST. CURB. •
STA. +86.94•
REPLACE LIGHTING PULLBOX
STA +77.72 73.27 RT.
, ZEgi
FYI57' DETECTABLE WARNING
pPV1
erk 1ST DR -11N4"'79ftE
t (le AN A 01.-.1.,WE'Vl I I 0;
END C&G TYPE F
635-2-11j1 EA MATCH EXIST. CURB
-STA. 492.89
; .
. . .
4r L l'pf: .0H r= EX 1ST: DRAINAGE -WE Li.V1.0.-`''Cg1 "
s 4r'rrr BE JE,T CLEAN & RE-DEVELPFL..
110.191,5111.
+75.62
+71.50
12 72' RT.
+71.4
CSN259TO 24" DIP
CONST. 30" PIPE 82.64' AT'
S. ft)
R/W LINE
+44.23
\ 81 50' RT.
+41.71
82.19' RT.
BE6VN C&G TYPE F
MATCH Exist. CURB
STA. +41.22
83.61. RT.
+40.54 •
93.18' RT;:?,,,
Cr
STATE OF FLORIDA
DEPARTMENT OF TRANSPORT4TION
ROAD NO.
COUNTY
FINANCIAL PROJECT ID
SR 5
MIAM1-DADE
443911.1.52.01
x c
EXIST. DETEC A WARNING
(TO BE REPLACED)
CURVE C2
PI = 122+57,61
a 10.46'44" (RT)
= 02°3616"
= 207.55
= 413.88
= 2,200.00
PC = 120+50.06
PT = 124+63.94
= NC
ROADWAY PLANS
"0
0
01
8
SHEET
NO.
15