HomeMy WebLinkAboutR-23-0543City of Miami
Resolution R-23-0543
Legislation
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
File Number: 14974 Final Action Date: 12/14/2023
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM
CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY
THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD 5 /
BISCAYNE BOULEVARD FROM SOUTH OF NORTHEAST 5 STREET TO
SOUTH OF NORTHEAST 11 STREET, MIAMI, FLORIDA, FOR GENERAL
ROADWAY AND DRAINAGE IMPROVEMENTS IN THIS CORRIDOR,
INCLUDING IMPROVEMENTS ON ROADS NOT ON THE STATE HIGHWAY
SYSTEM.
SPONSOR(S): Commissioner Sabina Covo
WHEREAS, the Florida Department of Transportation ("FDOT") has developed design
plans Financial Management ("FM") Project No. FM 443911-1-52-01 for State Road ("SR") 5 /
Biscayne Boulevard from south of Northeast 5 Street to south of Northeast 11 Street for the
milling and resurfacing of the existing asphalt pavement, Americans with Disabilities Act ("ADA")
improvements, upgrading the existing drainage system by replacing two (2) storm drainage
pumps and installing pipes and inlets, upgrading signing and pavement markings, and
upgrading pedestrian signalization ("Project"); and
WHEREAS, FDOT intends to undertake and complete the Project, a portion of which
includes work on roads not on the State Highway System that is a City of Miami ("City") Right -
of -Way, specifically Northeast 10 Street extending approximately 32 feet west of the FDOT
Right of Way line (for purposes of this agreement, the "Off -System Project Limits"); and
WHEREAS, the Project includes installation of two (2) drainage structures, installation
of 14" x 23" elliptical pipes connecting the new drainage inlets to the existing drainage structures
and installation of curb and gutter ("Local Roadway Improvements") and all activities associated
with, or arising out of the construction of the Local Roadway Improvements; and
WHEREAS, the Off -System Construction and Maintenance Agreement ("Agreement"),
attached and incorporated as Exhibit "A," establishes the terms, conditions, and responsibilities
of FDOT and the City to accomplish the Project and Local Roadway Improvements on the City's
Streets; and
WHEREAS, the City agrees with the terms and conditions in the Agreement, in
substantially the form attached and incorporated as Exhibit "A";
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
City of Miami Page 1 of 2 File ID: 14974 (Revision: A) Printed On: 3/7/2024
File ID: 14974
Enactment Number: R-23-0543
Section 2. The City Manager is authorized' to execute the Agreement, in substantially
the attached form, with FDOT, for the Project on SR 5 / Biscayne Boulevard from south of
Northeast 5 Street to south of Northeast 11 Street, Miami, Florida, which includes improvements
on roads not on the state highway system, and the Local Roadway Improvements.
Section 3. This Resolution shall become effective immediately upon its adoption.
APPROVED AS TO FORM AND CORRECTNESS:
11/15/2023
1 The herein authorization is further subject to compliance with all legal requirements that may be
imposed, including but not limited to, those prescribed by applicable City Charter and City Code
provisions.
City of Miami Page 2 of 2 File ID: 14974 (Revision: A) Printed on: 3/7/2024