HomeMy WebLinkAboutVol. I. Sec. B.1. Section 1304 Information Form, Application Forms; Supplementary MaterialsMiami Ballpark/ MUSP Application
Section §1304 Information
In accordance with the requirements of Section §1304 of the City's Zoning Ordinance, the
following information is provided in connection with this Application for Major Use Special
Permit for the Miami Ballpark.
Application forms; supplementary materials:
1. Statement of ownership and control of the proposed development activity.
The subject property is owned by the City of Miami, a municipal corporation of the
State of Florida. A small portion of the site is owned by Miami Dade County, Florida.
The Property is free from any zoning or code violation and/or liens. Copies of the deeds
for the various parcels comprising the Property are provided under Tab A.9.
2. Statement describing in detail the character and intended use of the development
activity.
The Miami Ballpark project proposes the construction and development of a 37,000 seat
retractable roof baseball stadium with 61,678 square feet of accessory retail space and 96
multifamily residential units lining four parking garage structures that will provide
4,840 offstreet parking spaces for the facility. An additional 969 parking spaces will be
provided on surface parking lots. Development is intended in three phases. The first
phase consists of the construction of the baseball stadium. The second phase consists of
the construction of the parking garages, accessory retail areas, and the improvement of
the surface parking lots. The third and final phase will include the residential
component of 96 multifamily residential units.
3. General location map, showing relation of the site or activity for which special
permit is sought to major streets, schools, existing utilities, shopping areas, important
physical features in and adjoining the project or activity and the like.
Various aerial photographs are included in the application. Also enclosed are a general
location map and a context map of the project depicting the massing and location of
surrounding buildings within an extensive radius. See, Tab C-7.
4. A site plan containing the title of the project and the names of the project planner,
and developer, date, and north arrow and, based on an exact survey of the property
drawn to a scale of sufficient size to show.
The general information requested and shown in the Context Plan and the Ground
Floor Plan, is provided under Tab C-7.
5. Boundaries of the project, any existing streets, buildings, watercourses, easement
and section lines.
The boundaries of the project and the location of streets, and all easements are shown
on the Survey of the Property and included under Tab C-7.
6. Exact location of all buildings and structures.
The Property is presently undeveloped. The location of the proposed buildings is
shown on the Site Plan and included under Tab C-7.
7. Access and traffic flow and how vehicular traffic will be separated from
pedestrian and other types of traffic.
A detailed analysis of the site access, traffic flow, and traffic impact is set forth in the
Traffic Impact Study under Tab C-8.
8. Off-street parking and off street loading area.
The project includes four offstreet parking garages and four surface parking lots. The
project includes 4,840 parking spaces in the four parking garages of which 106 are
reserved spaces for the 96 residential dwelling units. In addition, 969 parking spaces
are provided on surface lots for a total of 5,809 parking spaces.
The ballpark stadium provides extensive loading areas to serve the facility. It includes
a four truck loading dock, as well as internalized parking areas for television and media
vehicles.
9. Access to utilities and point of utilities hookups.
A detailed study of the utilities, including loads, and connections is included in the Site
Utility Study located under Tab C.3.
-2-
10. Tabulation of total gross acreage in the project and the percentages thereof
proposed to be devoted to various permitted uses:
Tabulations of proposed uses are included within the Project Data Sheet included under
Tab A.6.
11. Tabulation showing the total project density in dwelling units per acre.
The project proposes residential development at a density of 3 DU/net acre.
12. Storm Draining and Sanitary Sewerage Plans
A detailed study of storm drainage, water distribution, and waste water generation is
included in the Site Utility Study located under Tab C.3.
13. Architectural definitions for buildings in the development; exact number of
dwelling units, size, and types, together with typical floor plans of each type.
Typical floor plans for the various residential units are shown on the Site Plan. All
drawings are located under Tab C.7.
14. Landscaping plan, including types, sizes and locations of vegetation and
decorative shrubbery, and showing provisions for irrigation and future maintenance.
A detailed landscape plan showing vegetation and plantings for the project, including
the surface lots is included under Tab C.7.
15. Additional data, maps, plans or statements as may be required for the particular
use or activity involved.
A Preliminary Public Safety and Emergency Management Plan as required for major
sports facilities, is included under Tab C.5.
# 6062124_vl