Loading...
HomeMy WebLinkAboutFlagami West Phase II 200402 FIAGAMI WEST STORM SEWER IMPROVEMENTS PHASE IIB B-50695 Page 1 0# 3 Line No, Pay Item No. Pay I tem Description 1 101-1 M03ILIZATION Unit Quantity Unit Cost Cost 2 102-1 MaintenanceogfTraffic LS 1 $300,000.00 $300,000.00 3 104-11 Floating Turbidity Barrier LS 1 $190,000,00 $i90,00p.00 4 SPA Pavement Driveway Restoration (6" L.R Base 7 1" Asph) LF 290$30.00 $8,700.00 5 SP -2 Concrete Driveway Restoration, Including all types of surfaces SY 7,470 $7.5.00 $199,250,00 6 285-706 8" Llmerock Base (LRB 100) SY 1,595 $30.00 $47,850.00 7 285-711 12" Limerock Base (LRB 100) SY 23,634 $13.00 $307,242.00 8 327-70-19 Asphaltic Milling (3/4") Average SY 343 $16.00 $5,488.00 9 331-72Asphalt ic Concrete Type 5-112 Resurfacing (100 Ib/sy avgJ SY 58,946 $2.00 $117,892.00 10 400-1-2 Concrete Class I (Endwalls) SY 82,923 $6.00 $497,538.00 31 400-2-2Concrete Class II (Endwalls) CY 8 $500.00 $4,000,b0 12 415-1-3 Reinforcing Steel (Endwalls) CY 26 $700,00 $16,200.00 13 425-1-543 Drainage Structure Type "D" Inlet with " J -bottom" (<10" depth) L8 1,944 $10.00 $19,440.00 14 425-1-543 Drainage Structure Type"D" Inlet with " ]-bottom,, (>10" depth) EA 3 $15,800.40 $47,400.00 15 425-1-901-D4 Inlet Type D-4 (<10_ft.deep) EA 4 $19,700.00 $78,800.00 16 425-1-901-D5 Inlet Type D -S (<10-ft.deep) EA 82 $2,400.00 $196,800 00 17 425-1-901-D6 Inlet Type D-6 (<30-ft.deep) EA 11 $3,400.00 $37,400.00 18 425-1-902-D8 Inlet Type D-8 (<10-ft.deep) EA 21 $5,600.00 $117,600.00 19 425-1-901-D6 Inlet Type D-8 (>10-ft.deep) FA 5 $10,300.00 $51,500.00 20 425-2-101-D4EA ManholeType D-4 (<10-ft.depth) 7 $14,300.00 $100,100.00 21 425-2-101-D5EA ManholeType D-5 (<10 -ft 4 $2,400.00 $4,600.00 22 425-2-101-D5 ManholeType D-5 (>10-ft.depth) FA 17 $3,400.00 $57,800.00 23 425-2-101-D6ManholeType D-6 (<10-ft.depth) EA 3 $4,600.00 $13,800,00 24 425-2-102-D6EA ManholeType D-6 (>10-ft.depth) 8 $5,600.00 $44,800,00 25 425-2-101-D8 ManholeType D-8 (<10-ft.depth) EA 1 $8,000.00 $8,000.00 26 425-2-102-08 ManholeType D-8 (>10-ft.depth) EA 10 $10,300.00 $103,000.00 $14,300.00 $200,200.00 27 425-2-72 ManholeType "J-7" (<10-ft.depth) EA 14 EA 7 $4,400.00 $30,800.00 r=lagami/West End Phase II and Fairlawn Phase 118 Sewer Improvements Page 128 Bid No. 06-07.012 U 00402 FLAGAMUWEST END STORM SEWER IMPROVEMENTS PHASE IIB B-50695 Pa e 2 of 3 .Ina No. -Pay Item No. Pa Item pescrl tion 28 430-11-323 15" RCP (class III) Storm Sewer, any depth of cut Unit Quantity Unit Cost Cost 29 430-11-325 18" RCP (class III) Storm Sewer, any depth of cut LF 510 $39.00 $19,890.00 30 430-11-329 24" RCP (class III) Storm Sewer, any depth of cut LF 3,469 $46.00 $159,S74.00 31 430-11-333 30" RCP (class III) Storm Sewer, any depth of cut LF 1,334 $63.00 $83,790.00 32 430-11-338 36" RCP (class III) Storm Sewer, any depth of cut LF 3,147 $79.00 $248,613.00 33 430-11-340 42" RCP (class III) Storm Sewer, any depth of cut LF 3,825 $99.00 $378,675.00 34 430-11-341 48" RCP (class III) Storm Sewer, any depth of cut LF 1,073 $170.00 $]82,410.00 35 430-11-342 54" RCP (class III) Storm Sewer, any depth of cut LF 2,094 $200.00 $418,800.00 36 430-11-343 60" RCP (class III) Storm Sewer, any depth of cut LF 1,752 $230.00 $402,960.00 37 430-11-344 66" RCP (class III) Storm Sewer, any depth of cut LF 582 $270.00 $157,140.00 38 430-11-3456LF 72" RCP (class III) Storm Sewer, any depth of cut 1,085 $300.00 $325,500.00 39 430-81-029 24" Solid CAP Storm Sewer, any depth of cut LF 190 $320.00 $60,800.00 40 430-81-033 30" Solid CAP Storm Sewer, any depth of cut LF 182 $45.00 $8,190.00 41 443-70-3 18" CAP French Drain, any depth of cut LF 35 $65.00 $2,275.00 92 443-70-4 24" CAP French Drain, any depth of Cut LF 1,104 $70.00 $77,280.00 43 443-70-5 30" CAP French Drain, any depth of cut LF 1.896 $40.00 --T,-/-O,640.00 99 460-5-1 Manatee Barrier for 48" Endwail LF 702 $100.00 $70,200.00 95 460-5-2 Manatee B Barrier for 60" Endwali EA 1 $1,000.00 $1,000.00 46 460-5-3 Manatee Barrier for 72" Endwali EA 1 $1,200.00 $1,200.00 47 520-2-4 Concrete Curb Type "D" EA 1 $1,400.00 $1,400.00 48 522-1 Sidewalk Concrete (4" Thick, including ADA compliant ramp) LF 125 $18.00 $2,250.00 49 522 2 Sidewalk Concrete (6" Thick) SY 4,475 $36.00 $161,100.00 50 530-1 Rip Rap (sand cement) SY 527 842.00 $22,134.00 Sl 575-1.1 Sodding (Bahia) CY 15 $280.00 $4,200.00 52 580 332-2 Removing Existing Tree SY 44,241 $4.00 $176,964,00 EA 5 $500,00 $2,500.00 FlagamllWest End Phase 11 and Fairlawn Phase 116 Sewer Improvements Page 139 Bid No. 06-07-012 �p FLAGAM[/WEST END STORM SEWRTOTAI 1 $6,018,565.00 FlagamUWest End Phase It and Fairlawn Phase 418 Sewer improvements Bid No. 08.07-012 Page 140 00402 FLAGAMMEST END STORM SEWER IMPROVEMENTS PHASE 1113 B-50695 Page 3 of 3 Line No. Pay Item No. I Pay I tem Description Unit Quantity Unit Cost Coat 53 1 580-336 IRoot Prune and Trim Existing Treet EA 59 $500.00 $29,500.00 54 1 583-3 ITree (5 gallon container 19" to 7" heigt or spread) EA 2 $200,00 $400.00 55 583-4 Tree (15 gallon container 8' to 20' heigt or clear trunk) EA 22 $300,00 $6,600.00 % 584-3 Single trunk palms (5 gallon container 19" to 7' height or spread) EA 24 $400.00 $9,6W.00 57 584-4 Single trunk palms (15 gallon container 8' to 20' heigt or clear trunk) EA 13 $600.00 $7,800,00 58 1070-100-14 18" TideFlex Slip -in Type Check Valve Serie 37G EA 4 $3,000.00 $12,000.00 FLAGAM[/WEST END STORM SEWRTOTAI 1 $6,018,565.00 FlagamUWest End Phase It and Fairlawn Phase 418 Sewer improvements Bid No. 08.07-012 Page 140