HomeMy WebLinkAboutExhibit 2Synopsis — Coconut Grove Baywalk General Development Report and Public Pier Design and Permitting
Budget Detail
Task
Amount
Pier Design
$228,000
Pier Permitting
$60,000
GDR
$62,000
TOTAL
$350,000
The project includes components of the City of Miami's Master Plan for the Coconut Grove Waterfront.
The scope is to produce a General Development Report that will include a bathymetric study, sea grass
study and engineering study of the sea wall structures along the Dinner Key section of the Baywalks.
The public pier will be designed and permitted for future use as a pier that can accommodate shrimping
and commercial fishing boats as well as other vessels. This first phase of the project includes the GDR
and pier design and `permitting.