Loading...
HomeMy WebLinkAboutExhibit 2Synopsis — Kennedy Park Floating Dock, Design Permitting, Construction and Demolition of Existing Dock Budget Detail Task Amount Dock Design $15,000 Dock Permitting $20,000 Dock Construction $75,435 Demolition of Existing Dock $20,000 TOTAL $130,435 Contingency @ 15% $19,565 GRAND TOTAL $150,000 The project is to replace the existing floating dock for small craft at Kennedy Park, adjacent to the Sailing Center. The scope includes design and permitting, demolition of existing dock and the construction of a new dock. The project will be completed in one phase.