Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Exhibit 3
Item 004.02 Commissioner District 5 — Sidewalk Repair PROJECT IV Cost per unit Total Cost a Line No. Pay Item Description $p oa Item 1 8,000 sq. ft. of standard 4 -inch concrete sidewalk, more or less, including tree root and branch trimming, tree Units Quantity Square feet $ 850-c"' root removal and restoration of the area. 8,000 2 _ 500 sq. ft. of standard 6 -inch concrete sidewalk/ driveway, more or less, including tree trimming, tree root removal and restoration of the Square feet area. 500 3 8,500 sq. ft. of concrete sidewalk removal (concrete or asphalt), more or less, at any location. 8,500 Square feet 4 100 lin. ft. of standard or depressed concrete curb or concrete curb and gutter, more or less, including removal of existing curb or curb and gutter, and including adjacent pavement restoration, if necessary, as 100 Linear er Misc. 35-85-22. feet 5 Remove and dispose of one (1) tree stump, including roots, any size if necessary, at any location 6 Provide and install five (5), more or less, water meter boxes located in sidewalk to be replaced, at any 1 Each location 5 Each 7 100 sq. yd. of 1- inch thick Type "S -IIP' asphaltic concrete surface course including bituminous tack coat, as Square noted in theses ecifications. 100 8 100 sq. yd. of 8- inch thick cwmp`acted limerock base with primer oil surface including necessary clearing and S Square and grading, as noted in these specifications. 100 q 9 install 50 square feet of St. Augustine Solid Sod in place, if necessary, including planting soil, grading, __yard Square leveling of the swale area and top dressing. 50 10 500 sq, ft. of standard 6 -inch concrete driveway approach, more or less, including removal of existing feet concretelasphalt driveway approach, tree trimming, tree root removal and restoration of the area at any 500 Square citywide location. feet 11 _ Provide and install five (5), more or less, traffic signal pull boxes located in sidewalk to be replaced, if necessary- at any citywide location, 5 Each 12 500 sq. ft., more or less, of 6 -inch thick base preparation for locations where there are no existing Square sidewalks, including clearing and grading, new fill material, compaction and leveling of the area, etc. 500 f=eet 13 100 sq. ft. of removal, more or less, of existing asphalt, concrete or sod at swale areas, clearing and _ grading to 6 -inches lower than face of sidewalk/ curb including survey work for new elevations, installing new 6 -inch thick base preparation with appropriate fill material, compaction and leveling of the valley 100 Square drainage area, etc., in order to properly adjust rain water flow into existing catch basins as per Misc. 35-85- feet 27. 14 500 sq. ft. of standard 4 -inch concrete handicap ramp, including removal of existing concrete/asphalt ramp, sod, etc., clearing and grading, tree trimming, tree root removal, new fill material, compaction and leveling 500 Square of the area, etc. all as per Misc. 35-85-22C, feet 15 Special Provisions Item $ 2,000 Cost per unit Total Cost a quantity Units *Item $p oa Cost $ --% per sq. ft. $ 3$ 000.°Q $ (J. to $ 2155 0 �• $ ©.10 $ 850-c"' $ 2.0 °�2" $ 2,000 $ 50 $ 50 $ $SOO°a $p oa $�00os $q $q000. $ °9 $ "JG QA 5 $ j,UV ��3 $ $ z o" $ $ ��� $ %Itbo o $5,000.00 P 'x