Loading...
HomeMy WebLinkAboutTabulation of BidsTABULATION OF BIDS IFB NO. 1108075,11 GUARDRAIL INSTALLATION AND REPAIR Item: Description # 1 Furnish and install guardrail (roadway) end anchorage assembly, parallel type # 2 Furnish and install guardrail (roadway) end anchorage assembly type II (2) Furnish and install guardrail (roadway) painter green (Forest Green 8810-6058) # 3 with wood, block and steel post Repair and replace green (Forest Green 8810-6058) painted guardrail (roadway) # 4 wood, block and steel post. Repair and replace guardrail (roadway) and wood, block and steel post with asphalt mowing strip 2" thick by 3 feet wide and pipe railing as needed. #5 Furnish and install guardrail, shop bent with wood, block and steel post in asphalt # 6 with asphalt mowing strip 2"thick by 3 feet wide. Furnish & install guardrail (roadway) with wood, block and steel post in asphalt with asphalt mowing strip 2" thick by 3 feet wide and optional pipe railing. #7 # 8 Furnish and install guardrail post (special) Total Price: *C. Slagter Construction deemed non-responsive due to bidder's failure to acknowlei Addendum #1 (which added an additional Line Item - #8) to the IFB. Prepared By: Charles F. Johnson, December 31, 2008 $ 76,302 Igo and submit a bid pursuant to Fence Masters, Inc. C. Slagter Construction Est Extended Extended UOM '; f tv- ,'; Unit Price Amount ::Unit Price Amount Each 2:P1 $3,055.00 lea $6110 N Each 2 . $1,083.00 /ea $2166 - N Linear ft. 250 ;, $37.76 11ft $9,440, R E Linear ft .? 250 > $39.94 lift $9,985 S P Linear ft. 250;, $108.93 lift $27,233 N Linear ft. 50:x= $53.801ift $2,690 '- Linear ft. 300':' $62.26lift $18678 E Each 50 $195.00 lea $9,750. $ 76,302 Igo and submit a bid pursuant to