Loading...
HomeMy WebLinkAboutAddendum NO.1GLENN MA RCOS Chief Procurement Officer PEDRO G. HERNANDEZ City Manager L,N ADDENDUM NO, 1 IFB NO. 108075,1 December 23, 2008 Invitation For Bid for Guardrail Installation and Repair TO: ALL PROSPECTIVE BIDDERS: Pursuant to discussions with prospective bidders at the mandatory pre-bid site visit conducted on. December 15, 2008, the following changes, additions, clarifications, and deletions amend the Bid Documents of the above captioned IFB, and shall become an integral part of the Contract Documents. Please note the contents herein and reflect same on the documents you have on hand. The following changes, additions, clarifications, and deletions amend the Bid Documents of the above captioned IFB, and shall become an integral part of the Contract Documents. Please note the contents herein and reflect same on the documents you have on hand. Section 2.15 PERMITS is amended to read as follows: The contractor must obtain all necessary permits (excavation, lane closure) prior to the start of any construction activities in the right of way. All permit fees will be waived by the City of Miami. Section 3.1 SPECIFICATIONS/SCOPE OF WORK has been amended along with corresponding Line Items. Please find below Questions from prospective Proposers and the City's Answers to those Questions received before the stipulated due date. Q1: The following are a few items that I believe should be added to the bid: 1) Rail only, to be powder coated. 2) Special post (if needed) should be on bid. 3) Thrie beam (if needed) should be on bid. 4) Safety pipe rail (if needed) should be on bid. Al: 1) See the newly amended Line Items. 2) See the newly amended Line Items. 3) Thrie beam shall not be used in conjunction with the work associated with this solicitation. 4) See the newly amended Line items. ALL OTHER TERMS AND CONDITIONS OF THE 1FB REMAIN THE SAME. Sincerely, Glenn Marcos, CPPD, CPPB, FCPM, FCPA Director/Chief Procurement Officer City of Miami IFB 108075,1