Loading...
HomeMy WebLinkAboutExhibit 4- � PROJECT ANALYSIS FORM CIP 2 Date Prepared: 6 -Oct -2008 Capital Improvements &Trans Transportation NON-CIP P P P ❑ VERSION PROGRAM 341 -Streets & Sidewalks AREA 3 -infrastructure & Environment PROJECT NAME: District 5 - Sidewalk Repairs & ADA PROJECT NO: B -30377E ADDRESS i LOCATION: Districtwide DISTRICT: 5 PROJECT TEAM: Horizontal PROJECT CONTRACTED COST: CATEGORY: Streets and Sidewalks PROJECT EST. COST: $ 250,691.00 CLIENT DEPT: 122-T&T-Transportation & Transit CURRENT FUNDS: $ 250,691.00 CLIENT CONTACT: Ola Aluko TEL.: (305) 416-1471 FUTURE FUNDS: DESIGN MANAGER: John DePazos (CIP) TEL.: 305-416-1094 FUND SHORTFALL: CONSTR. MANAGER: Elyrosa Estevez TEL.: 305-416-1217 PROCUREMENT: Conventional EST. DESIGN START: 11/01/08 EST. BID ADV.: EST. CONSTRUCTION START: 11/01/08 EST. DESIGN END: 12/31/09 EST. AWARD DATE: EST. CONSTRUCTION END: 12/31/09 PRODUCTION PHASE (3 -DES) % of I Estimated Design % of j Contracted Design Prime Consultant: 0000 To be Assigned CODE Const Const 1 Outside Consultant - Prime Basic Design Fee 1.01 2 CIP - Design Management 1.04 cn 3 General Production Phase contingency 1.01 4 cn Estimated Contracted PRODUCTION TOTALS U J Q CONSTRUCTION PHASE (4 -CON) Contracted Construction 1- Estimated Construction b Prime Contractor: 0000 To be Assigned CODE Y (Formal Bid, Informal Bid or C-) PM JOC Method) Q 1 Construction Cost (Prime Contractor) 2 90% $ 219,124.00 0 2 Construction Contingency Allowance 2 10% $ 24,348.00 Z 3 Estimated Contracted o CONSTRUCTION TOTALS LU $ 243,472.00 `= CONSTRUCTION ADMINISTRATION (8 -CEO) I CODE Estimated CEO Contracted CEO 1 Construction Engineering Observation (CEO) Consultant 3.01 Cn I— 2 Construction Management by CIP Construction Manager 3.04 W 3 Construction Inspections by CIP Inspector 3.02 4 JOG Administration - The Gordian Group 3.03 U 5 LU Estimated Contracted CONSTRUCTION ADMINISTRATION TOTALS a- ADMINISTRATIVE EXPENSES (6 -ADM) CODE Estimated ADMIN Contracted ADMIN 1 CIP Department (Mgmt/Budget/ProcuremenUComm.) 4 3.0% $ 7,219.00 2 -v1 Estimated Contracted ADMINISTRATIVE EXPENSES TOTALS Is 7,219.00 ADDITIONAL PROJECT TASKS CODE Estimated TASKS Contracted TASKS 1 Estimated Contracted ADDITIONAL PROJECT TASKS TOTALS B -30377E PROJECT GRAND TOTAL Estimated 11 Contracted $ 250,691.00 PAF FORM Printed on: 10/6/2008 Page 1 of 2 PAF FORM CREATED ON 10/31/06 Executed PAF MUST be electronically distributed to the following individuals: Director of the Client Department, Yvette'Maragh, Edwige De Crumpe, Senior Project Manager and Project Manager. PAF FORM Printed on: 10/6/2008 Page 2 of 2 PAF FORM CREATED ON 10/31/06 Sidewalk repairs throughout District 5 LU AVAlt_A8t_E 0 U AWARD :NAME=AND NUMBER U 356005-1 Streets Bond Program - Series 1 341330 Citywide Transportation An W 250,691.00 LL 0 G. Operating Cost Associated with Project: YEAR 1 YEAR 2 1 YEAR 3 IYEAR 4 YEAR 5 Executed PAF MUST be electronically distributed to the following individuals: Director of the Client Department, Yvette'Maragh, Edwige De Crumpe, Senior Project Manager and Project Manager. PAF FORM Printed on: 10/6/2008 Page 2 of 2 PAF FORM CREATED ON 10/31/06 AVAlt_A8t_E FUTURE AWARD :NAME=AND NUMBER 356005-1 Streets Bond Program - Series 1 341330 Citywide Transportation An $ 250,691.00 LL B=30377E FUNDBRAND07AL " A�TiAL PRc�JECTED - $ 250,691.00 %0 -f 0 initiated by: Elyrosa Estevez Date: [ t Project Manager Signatur Approved by: John De Pazos Date: % Senior Project Manager Si ure Z Reviewed by: David Mendez Date: Assistant Director. Capital Improvements nature { 1— Reviewed by: Yvette Maragh q 1 1 �-�G v l Date: p CIP Budget Administrator Signature 4 I J Verified by: ) bW j 6 f+ M C zu j -t K Initials Program Controls Staff Signature Accepted by: Ola Aluko 4 Date: Director. Capital Improvements Approved by: Stephanie Grindell 5aAA R Date: } ( d d u Director. Public Works Signaturd I ORIGINAL TO: Melanie Whitakerl 8th Floor Inititals No Homeland Defense Bond Appropriated to this Project 0 Z Executed PAF MUST be electronically distributed to the following individuals: Director of the Client Department, Yvette'Maragh, Edwige De Crumpe, Senior Project Manager and Project Manager. PAF FORM Printed on: 10/6/2008 Page 2 of 2 PAF FORM CREATED ON 10/31/06