Loading...
HomeMy WebLinkAboutLetterDecember 9, 2008 Robert Fenton, Project Manager & Senior Assistant to the City Manager 444 NW 2 Avenue Miami, Florida 33130-1910 Re: General Environmental Consulting Services Grapeland Heights Park Miami, Miami -Dade County, Florida Bureau Veritas Proposal Number 2602.08.810R2 Monitoring Only Plan Proposal Dear Mr. Fenton: Bureau Veritas North America, Inc. (Bureau Veritas) proposes to provide the services identified below for the project entitled Grapeland Heights Park. I. GENERAL Pursuant to your request, Bureau Veritas understands that the Pollution Remediation Section of the Department of Environmental Resources Management (DERM) requires Groundwater Monitoring at select monitoring wells for a minimum of one-year for the above - referenced facility. On November 15, 2007, DERM approved quarterly groundwater monitoring for arsenic from monitoring wells MW -3, MW -9, MW -29, MW -30, MW -31, and MW -32 (see attached Figure 1). Bureau Veritas field verified that only MW -3 still remained on site. However, the integrity of this well needs to be determined. There are two wells on- site (MW -8 and an unknown well) which Bureau Veritas may be able to substitute for MW -9 and MW -29. However, the integrity of these wells must also be determined. Bureau Veritas will discuss this option with DERM. Once DERM has decided about using the on-site wells and Bureau Veritas has verified the integrity of the on-site wells, Bureau Veritas may need to reinstall a total of six monitoring wells. If the monitoring wells can not be placed in the same location(s), then Bureau Veritas will submit to DERM a site map which proposes the new location(s) and install the new well(s) upon DERM approval. II. SCOPE OF WORK Based on Bureau Veritas's understanding of the project requirements, Bureau Veritas proposes the following: A. Task 1 -Quarterly Groundwater Monitoring 1. Determine the integrity of MW -3, MW -9, MW -29, MW -30, MW -31, and MW -32. BUREAU VERITAS NORTH AMERICA, INC. Tel:(305)651-8483 10125 NW l 16L' Way, Suite 18 Fax: (305) 651-4460 Miami, Florida 33178 www.us.bureauveritas.com December 9, 2008 WORK ORDER PROPOSAL 2602.08.810R2 Bureau Veritas Page 2 2. Discuss with DERM the option to utilize MW -9 and the unknown monitoring well as a sampling location provided the integrity of the wells prove to be viable. 3. Based on the viability and integrity of the wells, install up to 6 shallow monitoring wells as approved by DERM. 4. Install six monitoring wells with a mobilization cost of $375/day, which will take 2 days. The cost per monitoring well installation is $475. Bureau Veritas will only charge the City of Miami based on the actual number of monitoring wells that have been reinstalled. 5. Sample each monitoring well quarterly for arsenic via the EPA Method 200.7. 6. Place the purge water in one fifty-five gallon drum for each quarterly sampling event and disposed of properly. B. Task 2 -Reporting 1. Prepare the report for each sampling event for DERM review and approval. 2. Each report will include the sample results, tables, figures, and historical data. III. SUBCONSULTANTS The below listed Sub -Consultants will assist in the performance of the Work. SubConsultant Name Specialty or Expertise None Task, Sub -task, or Activity ID # IV. SCHEDULE OF WORK — TIME OF PERFORMANCE Consultant shall submit the Deliverables and perform the Work as depicted in the tables below. SCHEDULE OF DELIVERABLES Task, Sub -task, or Activity ID # Major Task, Sub -Task, Activity, or Deliverable Duration (specify weeks or calendar days) Delivery Date* (cumulative weeks, or calendar days) Task 1, 1 Verify integrity of wells 1 day NTP + 2 Task 1, 2 Receive approval for well locations from DERM 7 days NTP +9 Task 1, 3-4 Install up to 6 monitoring wells 2 days NTP +21 Task 1, 5-6 Sample 6 monitoring wells for 4 quarters 2 days/quarter NTP +24 Task 2, 1-2 Prepare report for each quarter 2 weeks/quarter NTP +45 Immediately upon receipt of authorization to proceed, the outlined scope of services will be initiated. The referenced quarterly reports will be submitted to the City of Miami within three business days of receipt of laboratory data, which will be requested utilizing standard turnaround times. An updated schedule, indicating actual delivery dates, based on the above durations, will be provided to the City upon receipt of the NTP. V. COMPENSATION Consultant shall perform the Work detailed in this Proposal for a Total fee of $18,615.77. The City shall not be liable for any fee, cost, expense or reimbursable expense or other compensation beyond this amount. Said fee includes an allowance for Reimbursable Expenses required in connection with the Work, which shall not exceed $100.00. Said Reimbursable December 9, 2008 WORK ORDER PROPOSAL 2602,08.810R2 Bureau Veritas Paae 3 Expenses shall be used in accordance with the Agreement Provisions and shall conform to the limitations of Florida Statutes § 112.061. SUMMARY OF COMPENSATION" Task, Sub - task, or Activity ID # Major Task Name and/or Activity Description Fee Amount Fee Basis Task 1, 34 Installation of wells 3,225 Lump Sum, Not to Excee Task 1, 5-6 Laboratory Analysis 10,560 Lump Sum, Not to Excee Lump Sum, Not to Excee Lump Sum, Not to Excee Lump Sum, Not to Excee Subtotal - Professional Fees 4,730.77 Allowance for Reimbursable Expenses 100 TOTAL 18,615.77 Lump Sum, Not to Excee VI. ADDITIONAL SERVICES The City may establish an allowance for additional services requested by the City and for unforeseen circumstances, which shall be utilized at the sole discretion of the City. VII. PROJECT MANAGER CONSULTANT'S Project Manager for this Work Order assignment will be Margaret Silva. Submitted by: Bureau Veritas North America, Inc. A*— Prepared by: Reviewed by: Approved by: Alexander D. Acosta ` f r Margaret Silva, P.G. Robert Fenton, Senior Assistant Manager