Loading...
HomeMy WebLinkAboutR-23-0513City of Miami Resolution R-23-0513 Legislation City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com File Number: 14967 Final Action Date: 11/16/2023 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD 972/CORAL WAY/ SOUTHWEST 3 AVENUE FROM 400 FEET WEST OF SOUTHWEST 12 AVENUE TO BRICKELL AVENUE, MIAMI, FLORIDA, FOR GENERAL ROADWAY IMPROVEMENTS IN THIS CORRIDOR, INCLUDING IMPROVEMENTS ON ROADS NOT ON THE STATE HIGHWAY SYSTEM. SPONSOR(S): Commissioner Sabina Covo WHEREAS, the Florida Department of Transportation ("FDOT") has developed design plans Financial Management ("FM") Project No. FM 445998-1-52-01 for State Road ("SR") 972/Coral Way/Southwest 3 Avenue from 400 feet west of Southwest 12 Avenue to Brickell Avenue for the milling and resurfacing of the existing asphalt pavement, ADA improvements, upgrading pavement markings and replacing substandard signs, upgrading pedestrian signalization features and replacing signal and lighting pull -boxes ("Project"); and WHEREAS, FDOT intends to undertake and complete the Project, a portion of which includes work on roads not on the State Highway System but City of Miami ("City") right-of-way, specifically Southwest 31 Road from Station 43+50 to Station 43+85 Left/Right, SW 26 Road from Station 61+25 to Station 61+85 Left/Right, SW 25 Road from Station 64+90 to Station 65+80 Left/Right, SW 15 Road from Station 99+90 to Station 100+40 Right, SW 2 Avenue from Station 103+80 to Station 104+45 Left/Right, SW 1 Avenue from Station 110+85 to Station 111+30 Left/Right, South Miami Avenue from Station 116+65 to Station 117+65 Left/Right, and Brickell Avenue (for purposes of this agreement, the "Off -System Project Limits") and WHEREAS, the Project includes pavement restoration through milling and resurfacing, widening, upgrading pavement markings and replacing substandard signs, driveway reconstruction, and incidental sidewalk reconstruction and paver re -set due to proposed signalization improvements ("Local Roadway Improvements") and all activities associated with, or arising out of the construction of the Local Roadway Improvements; and WHEREAS, the Off -System Construction and Maintenance Agreement ("Agreement"), attached and incorporated as Exhibit "A," establishes the terms, conditions, and responsibilities of FDOT and the City to accomplish the Project and Local Roadway Improvements on the City's Streets; and WHEREAS, the City agrees with the terms and conditions in the Agreement, in substantially the attached form; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: City of Miami Page 1 of 2 File ID: 14967 (Revision:) Printed On: 12/6/2023 File ID: 14967 Enactment Number: R-23-0513 Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The City Manager is authorized to execute the Agreement, in substantially the attached form, with FDOT, for the Project on SR 972/Coral Way from south of Interstate 95 to east of Southwest 3rd Avenue, Miami, Florida, which includes improvements on roads not on the state highway system, and the Local Roadway Improvements. Section 3. This Resolution shall become effective immediately upon its adoption. APPROVED AS TO FORM AND CORRECTNESS: nde` z, City Httor ey 11/6/2023 1 The herein authorization is further subject to compliance with all legal requirements that may be imposed, including but not limited to, those prescribed by applicable City Charter and City Code provisions. City of Miami Page 2 of 2 File ID: 14967 (Revision:) Printed on: 12/6/2023