HomeMy WebLinkAboutR-78-0456RESOLUTION NO, 7 8" 4 5 6
A RESOLUTION ACCEPTING THE COMPLETED WORK
PERFORMED BY D.M,P, CORPORATION AT A TOTAL
COST OF $32,694.50 FOR THE SOUTH GROVE
BICYCLE PATH MODIFICATION AND AUTHORIZING
A FINAL PAYMENT OF $3,269.45
WHEREAS, there exists a contract dated March 24,
1978 between the City of Miami and D.M.P. Corporation;
and
WHEREAS, the work has been satisfactorily completed,
and D.M.P. Corporation has furnished the required documents
certifying that all bills for labor and materials have been
paid in full in connection with the aforesaid contract; and
WHEREAS, the City Manager and the Department of Public
Works recommend that the completed work be accepted and final
payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLORIDA:
Section 1. The completed work performed by D.M.P.
Corporation for SOUTH GROVE BICYCLE PATH MODIFICATION at a
total cost of $32,694.50 is hereby approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $3,269.45 to D.M.P. Corporation
as full and final payment for all work performed and all
materials furnished in connection with SOUTH GROVE BICYCLE PATH
MODIFICATION PROJECT.
PASSED AIJD ADOPTED this 13 day of _ JULY , 1978.
ATTEST:
(32/773
PH G, ONGIE, CITY CLERI:
PREPARED AND APPROVED BY:
ROBEPT F. CLARK
ASSISTA'JT CITY ATTORNEY
MAURICE A. FERRE
MAURICE A.. FERRE, M A Y 0 R
"DOCUMENT INDEX
ITEM NO...�..�.”
APPROVED AS TO FORM AND CORRECTNESS:
r . GE
C TY ATTORNEY
24
CM; CT 11.4M1. LOflTDA
TO:
rnr),.1:
Joseph AB Crassie
City Manager
er•
)1:
,Vat?rtreco
William E, Parkes
Director
Department or Public Works
MEMOP.ANDU,',i
3''
1 0 i s
O?E'OCES:
July 13) 1978 FILE: t.442o
SOUTH GROVE BICyCLE PATH
MODIFICATION
Corporation has completed the project consisting of
widening and reconstruction or 4500 feet of bicycle path
within public right or way, The Bike's Path is located on
Main Hwy, between Franklin Avenue and Douglas Road and on
Douglas Road between Main Hwy. and Ingraham Hwy. The
original contract amount was ror t33)135.00, but the
completed contract amount is t32,694.50, and it is was
completed on time.
It is now in order for the Commission to accept the com-
pleted work and authorize final payment, after all condi-
tions are met.
THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OP A
RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHORIZING A
FINAL PAYMENT OF $3,269.45 TO D.M.P. CORPORATION FOR THE
SOUTH GROVE BICYCLE PATH MODIFICATIONS PROJECT.
mar
OB NAME
CONTRAC"bR
JOB SCOPE
N}}A CC)N ' GTtOM_?A_ _T..S I '
FOR 'gE _CITY MAtIACtt.
South Grove Bicycle Path Modifications D-4420
im.P. Corporation
Widening and reconstruction of 4500 feet of bicycle
path within public right of way. The Bike Bath's
located on Main Hwy between Franklin Avenue and
Douglas Road and on Douglas Road between Main Hwy.
and Tngraham Hwy.
REASON
'OR WORK Improvement to existing bike path.
SOURCE OF
FUNDS Reimbursement Grant up to $25,000 from Dade County
Highway Bond Funds
PROJECT Bids Received: 2/2/78
FISTORY Contract Awarded: 3/23/78
Preconstruction Meeting: 3/30/78
CONTRACT
TIME
STARTED 4/18/78
CONTRACT
TIME
SCHEDULED
COMPLETION
DATE
40 Working; Days
6/13/78
ACTUAL
COMPLETION
DATE 6/7/78
BID AMOUNT $33,135.00
CONTRACT
FINAL COST 532,694.50
CURRENT
ITEM FOR
CONSIDERATION
Resolution to accept completed work and authorize
final payment to the contractor.
78-456
Wier-
•11—
mirr