HomeMy WebLinkAboutR-78-0456RESOLUTION NO, 7 8" 4 5 6 A RESOLUTION ACCEPTING THE COMPLETED WORK PERFORMED BY D.M,P, CORPORATION AT A TOTAL COST OF $32,694.50 FOR THE SOUTH GROVE BICYCLE PATH MODIFICATION AND AUTHORIZING A FINAL PAYMENT OF $3,269.45 WHEREAS, there exists a contract dated March 24, 1978 between the City of Miami and D.M.P. Corporation; and WHEREAS, the work has been satisfactorily completed, and D.M.P. Corporation has furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The completed work performed by D.M.P. Corporation for SOUTH GROVE BICYCLE PATH MODIFICATION at a total cost of $32,694.50 is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $3,269.45 to D.M.P. Corporation as full and final payment for all work performed and all materials furnished in connection with SOUTH GROVE BICYCLE PATH MODIFICATION PROJECT. PASSED AIJD ADOPTED this 13 day of _ JULY , 1978. ATTEST: (32/773 PH G, ONGIE, CITY CLERI: PREPARED AND APPROVED BY: ROBEPT F. CLARK ASSISTA'JT CITY ATTORNEY MAURICE A. FERRE MAURICE A.. FERRE, M A Y 0 R "DOCUMENT INDEX ITEM NO...�..�.” APPROVED AS TO FORM AND CORRECTNESS: r . GE C TY ATTORNEY 24 CM; CT 11.4M1. LOflTDA TO: rnr),.1: Joseph AB Crassie City Manager er• )1: ,Vat?rtreco William E, Parkes Director Department or Public Works MEMOP.ANDU,',i 3'' 1 0 i s O?E'OCES: July 13) 1978 FILE: t.442o SOUTH GROVE BICyCLE PATH MODIFICATION Corporation has completed the project consisting of widening and reconstruction or 4500 feet of bicycle path within public right or way, The Bike's Path is located on Main Hwy, between Franklin Avenue and Douglas Road and on Douglas Road between Main Hwy. and Ingraham Hwy. The original contract amount was ror t33)135.00, but the completed contract amount is t32,694.50, and it is was completed on time. It is now in order for the Commission to accept the com- pleted work and authorize final payment, after all condi- tions are met. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OP A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHORIZING A FINAL PAYMENT OF $3,269.45 TO D.M.P. CORPORATION FOR THE SOUTH GROVE BICYCLE PATH MODIFICATIONS PROJECT. mar OB NAME CONTRAC"bR JOB SCOPE N}}A CC)N ' GTtOM_?A_ _T..S I ' FOR 'gE _CITY MAtIACtt. South Grove Bicycle Path Modifications D-4420 im.P. Corporation Widening and reconstruction of 4500 feet of bicycle path within public right of way. The Bike Bath's located on Main Hwy between Franklin Avenue and Douglas Road and on Douglas Road between Main Hwy. and Tngraham Hwy. REASON 'OR WORK Improvement to existing bike path. SOURCE OF FUNDS Reimbursement Grant up to $25,000 from Dade County Highway Bond Funds PROJECT Bids Received: 2/2/78 FISTORY Contract Awarded: 3/23/78 Preconstruction Meeting: 3/30/78 CONTRACT TIME STARTED 4/18/78 CONTRACT TIME SCHEDULED COMPLETION DATE 40 Working; Days 6/13/78 ACTUAL COMPLETION DATE 6/7/78 BID AMOUNT $33,135.00 CONTRACT FINAL COST 532,694.50 CURRENT ITEM FOR CONSIDERATION Resolution to accept completed work and authorize final payment to the contractor. 78-456 Wier- •11— mirr