HomeMy WebLinkAboutR-78-0567• • mm mm Orporation; and RESOLUTION NO 7 8' 5137 RESOLUTION ACCEPTING THE COMPLETED WORK ItERFORMED BY LS MILTOII CONSTRUCTION CORPORA.. TION AT A TOTAL COST OF n92,316,60 FOR THE ADMINISTRATION BUTLDIN1 ,-, FOUNDATION WORK (REVISED); AND AUTHORIZING A FINAL PAYMENT OF $20,400,00 === materials have been paid in full in connection with and WHEREAS, the City Manaxer and the Department of Works recommend that the completed work be accepted WHEREAS, there exist t a contract dated March 9) 978 between the City of Miami and L, Milton Construction WHEREAS, the work has been satisfactorily completed and L. Milton Construction Corporation has furnished the required documents certifying that all bills for labor and aforesaid (SU PFOT1V'Eic A DOCUM ENTSri FOLLOW" contract; final payment made to the contractor the NOW, THEREFORE, BE 1T RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: 'Section I. The completed work performed by L. Milton Construction Corporation for the ADMINISTRATION BUILDING - . . , 4,'OONDATION WORK (REVISED) at a total cost aktaltWg.irt.6{1)rFx :.•. .. is hereby approved.' ITEM N I: Section 2. The proper officials of the City of Miami a.re hereby authorized to pay $20,400.00 to L. Milton Con - ruction Corporation as full and final payment for all work erfcrmed and all materials furnished in connection with theADMINISTRATION BUILDING - POUNDATION WORN (REVISED). PASSED AND ADOPTED this 14TH day oP SUMMER 1978. 0) q. ()NIT', Cl-mv CLE PREPARED AND AP77,0VE1) :H. ROBERT 7, CLAR A5?,T3TANT CITv ATTnTMv MAURICE A, FERRE MAURICE A. FERRE,MAvOR AS ',_10 ND C/RECTNES: 7 8 - 5 6 7 =-= f • • • • 1 / r "1,14f1. •i C � ' �. N o u :v lo, JO8eph R. Grassie City Manarer • /-e-ll r.'(r` • V c rt t, William E. Parkes Director Department of Public Workg Ott Fl t+_tom r 7Sente fiber 141 1978 '' B3185 ADMINISTRATION BUILDING +'OtJNDATION WORK (Revised) Milton Construction Corporation has completed the project consisting of constructing; foundations and earth work, including concrete spread footings, columns and walls, masonry wall, membrane waterproofing, and back"illinr of selected materials to grade at the east side of N. W. 3 Avenue between N. W. 2-3 Streets. The original contract amount was for $195, 000. 00, but the completed contract amount is 1).192,316.60, and it was completed on time. It is now in order for the Commission to accent the completed work and authoriNe final payment, after all conditions are met. THE DEPARTr4:NT OF PUBLIC W0RS RECOMMENDS THE ADOPTION OF A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHOR- IZING A FINAL PAvr-1ENT 07 $20,400.00 TO L. MILTON CON- STRUCTION CORPORATION FOR THE ADMINISTRATION BUILDING - FOUNDATION WORK (REVISED) . AH: he 'SUPPORTIVE TS FOLLOW" 8-567 II IIIIIIII111111_1111■iiu..''u"' iiii r7mAL COPSfrRUCTION FACT SHE 'l FOR THE CITY MPNAGER 3,0B,INUM Administration Fuilding - Foundation Work (ReVised) E-,S18SC CONT1ACTOR to Milton Construction Corporation JOB SCOPE The project consists cf foundations and earthwork including concrete spread footinrs, concrete columns and walls, masonry wall, membrane waterproofing, and backfilling of selected materials to grade located on the east side of N. W. 3 Avenue between N.1!. 2-3 Streets. REASON FOR WORK SOURCE OF FUNDS Construction of new Administration Building Title I Funds - Economic Development Administration Grant PROJECT Bids Received: 3/8/78 HISTORY Contract Awarded: 3/23/78 Preconstruction Meeting: 3/17/78 CONTRACT TII•E STARTED 3/27/78 CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COI%PLETION DATE 9 days delay from rain and 40 Working, days. plus 15 days to demolish and remove from site existing building on property acouired as part of building site. 6/23/78 6/19/78 BID AI"OU.;T t195, 000.OQ CONTRACT FIIIA.L COST t192, 316. 60 CURRENT ITEM FOR CONSIDERATION Resolution to accept completed work a final payment to the contractor.