HomeMy WebLinkAboutR-78-0567•
•
mm
mm
Orporation; and
RESOLUTION NO 7 8' 5137
RESOLUTION ACCEPTING THE COMPLETED WORK
ItERFORMED BY LS MILTOII CONSTRUCTION CORPORA..
TION AT A TOTAL COST OF n92,316,60 FOR THE
ADMINISTRATION BUTLDIN1 ,-, FOUNDATION WORK
(REVISED); AND AUTHORIZING A FINAL PAYMENT
OF $20,400,00
===
materials have been paid in full in connection with
and
WHEREAS, the City Manaxer and the Department of
Works recommend that the completed work be accepted
WHEREAS, there exist t a contract dated March 9)
978 between the City of Miami and L, Milton Construction
WHEREAS, the work has been satisfactorily completed
and L. Milton Construction Corporation has furnished the
required documents certifying that all bills for labor and
aforesaid
(SU PFOT1V'Eic
A
DOCUM ENTSri
FOLLOW"
contract;
final payment made to the contractor
the
NOW, THEREFORE, BE 1T RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLORIDA:
'Section I. The completed work performed by L. Milton
Construction Corporation for the ADMINISTRATION BUILDING -
. . ,
4,'OONDATION WORK (REVISED) at a total cost aktaltWg.irt.6{1)rFx
:.•. ..
is hereby approved.' ITEM N I:
Section 2. The proper officials of the City of Miami
a.re hereby authorized to pay $20,400.00 to L. Milton Con -
ruction Corporation as full and final payment for all work
erfcrmed and all materials furnished in connection with
theADMINISTRATION BUILDING - POUNDATION WORN (REVISED).
PASSED AND ADOPTED this 14TH day oP SUMMER 1978.
0)
q. ()NIT', Cl-mv CLE
PREPARED AND AP77,0VE1)
:H. ROBERT 7, CLAR
A5?,T3TANT CITv ATTnTMv
MAURICE A, FERRE
MAURICE A. FERRE,MAvOR
AS ',_10 ND C/RECTNES:
7 8 - 5 6 7
=-=
f
•
•
•
•
1
/ r "1,14f1.
•i C � ' �. N o u :v
lo, JO8eph R. Grassie
City Manarer
•
/-e-ll r.'(r` • V c rt t,
William E. Parkes
Director
Department of Public Workg
Ott Fl t+_tom r
7Sente fiber 141 1978 '' B3185
ADMINISTRATION BUILDING
+'OtJNDATION WORK (Revised)
Milton Construction Corporation has completed the
project consisting of constructing; foundations and
earth work, including concrete spread footings,
columns and walls, masonry wall, membrane waterproofing,
and back"illinr of selected materials to grade at the
east side of N. W. 3 Avenue between N. W. 2-3 Streets.
The original contract amount was for $195, 000. 00, but
the completed contract amount is 1).192,316.60, and it
was completed on time.
It is now in order for the Commission to accent the
completed work and authoriNe final payment, after all
conditions are met.
THE DEPARTr4:NT OF PUBLIC W0RS RECOMMENDS THE ADOPTION
OF A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHOR-
IZING A FINAL PAvr-1ENT 07 $20,400.00 TO L. MILTON CON-
STRUCTION CORPORATION FOR THE ADMINISTRATION BUILDING -
FOUNDATION WORK (REVISED) .
AH: he
'SUPPORTIVE
TS
FOLLOW"
8-567
II IIIIIIII111111_1111■iiu..''u"' iiii
r7mAL COPSfrRUCTION FACT SHE 'l
FOR THE CITY MPNAGER
3,0B,INUM Administration Fuilding - Foundation Work (ReVised) E-,S18SC
CONT1ACTOR to Milton Construction Corporation
JOB SCOPE The project consists cf foundations and earthwork including
concrete spread footinrs, concrete columns and walls,
masonry wall, membrane waterproofing, and backfilling
of selected materials to grade located on the east side
of N. W. 3 Avenue between N.1!. 2-3 Streets.
REASON
FOR WORK
SOURCE OF
FUNDS
Construction of new Administration Building
Title I Funds - Economic Development Administration Grant
PROJECT Bids Received: 3/8/78
HISTORY Contract Awarded: 3/23/78
Preconstruction Meeting: 3/17/78
CONTRACT
TII•E
STARTED 3/27/78
CONTRACT
TIME
SCHEDULED
COMPLETION
DATE
ACTUAL
COI%PLETION
DATE
9 days delay from rain and
40 Working, days. plus 15 days to demolish and remove from
site existing building on property
acouired as part of building site.
6/23/78
6/19/78
BID AI"OU.;T t195, 000.OQ
CONTRACT
FIIIA.L COST t192, 316. 60
CURRENT
ITEM FOR
CONSIDERATION Resolution to accept completed work a
final payment to the contractor.