Loading...
HomeMy WebLinkAboutR-78-0610RESOLUTION N0, 787. % i ® A RESOLUTION ORDERING PINES SANITARY SEWER IMPROVEMENT SR-5450-C (CENTER- LINE SEWER) AND DESIGNATING THE PROPERTY AGAINST WHICH SPECIAL ASSESSMENTS SHALL RE MADE FOR A PORTION OF THE COST THEREOF AS PINES SANITARY SEWER IMPROVEMENT DISTRICT SR-5450-C (CENTERLINE SEWER) HE IT RESOLVED BY THE COMMISSION OF THE CITY OP MIAM `LORIDA : Section 1. That a Sanitary sewer improvement identified as PINES SANITARY SEWER IMPROVEMENT SR-5450-C (CENTERLINE SEWER) shall be made under the provisions of Section 56 of the Charter of The City of Miami, as amended, said IMPROVEMENT to consist of: Laying an 8-inch or larger Vitrified Clay and/or Polyvinyl Chloride and/or Iron Pipe Sanitary Sewer at or near the center- line of: S.W. 22 Terrace from S.W. 27 to 37 Avenue S.W. 23 Street from S.W. 27 to 37 Avenue S.W. 23 Terrace from S.W. 27 to 37 Avenue S.W. 24 Street from S.W. 27 to 37 Avenue S.W. 24 Terrace from S.W. 27 to 37 Avenue S.W. 25 Street from S.W. 27 to 37 Avenue S.W. 25 Terrace from S.W. 27 to 37 Avenue S.W. 26 Street from S.W. 27 to 37 Avenue S.W. 29 Avenue from S.W. 22 to 26 Street S.W. 31 Avenue from S.W. 22 to 26 Street S.W. 32 Avenue from S.W. 22 to 27 Street S.W. 32 Court from S.W. 26 to 27 Street S.W. 33 Avenue from S.W. 26 to 27 Street S.W. 34 Avenue from S.W. 22 to 26 Street S.W. 36 Avenue from S.W. 22 to 26 Street Laying six-inch (6') cast iron and/or polyvinyl chloride pipe laterals, as required to the lets and parcels of land which abut upon the above -mentioned streets, including the lots and parcels of land described in Section 2 hereof; together with necessary manholes, other appurtenances, pump stations, outfall, connections to existing sewers, relaying street pavement, side- walks, and curb and gutters where such relaying is made necessary by this improvement. "SUPPORTIVE DOCUMENTS FOLLOW" "DOCUMENT IN P EX ITEM NO. CITY COMMISSION MEETING OF S E P 2 1978 RE$OU PION Nof REMARKS: , ...... _ 7,5eotion 2, 8pecia1 Assessmehts for a portion of the ett58t Said PINES SANITARY SEWER IMPROVEMENT SR-5450-C (CENTERLINE SEWER) shall be levied upon all the lots and parcels of land Which abut upon the above -mentioned streets, including the following described lots and parcels of land, and such lots and parcels of land are hereby designated PINES SANITARY SEWER IMPROVEMENT DISTRICT SR-5450-C (CENTERLINE SEWER). To each of the lots and parcels of land which abut upon the above -mentioned streets, including the following described lots and parcels of land to the property line of which a sewer lateral or laterals is laid, will be assessed the average cost of that lateral or laterals, under the provisions of Section 56 of the Charter of The City of Miami, as amended: Subdivision, Plat Book and Page Lot Block MIAMI SUBURBAN ACRES 2-84 2-4 9,10,11,12 14,15, 9,13,14,15,16 11,12,20 1,2,8 SUBURBAN ACRES AMENDED 4-73 8 1 20-27 "SUPPORTIVE 42,43,48,49 ‘• DOCUMENTS 20-35, 40-45 FOLLOW" 46-51 23-41, 42-54 22,55 64-77 21-80 1 2 PUSdiVisi,otr, Plat_ Book and Page Lot MIAMI SUBURBAN ACRES AMENDED ALIEN ESTATES 44,73 17,-64 20.-45j 52-64 1-13 3 20-32, 33-45, 52-64 1-48 1-80 2-77 3-55 �J �, .. 3-27,32-59 12 30-37 1-21 1 plokk SILVER BLUFF HOMESITES 8-101 1-32 1-38 1-48 1-4 8 1-38 1-32 1-32 1-38 1-48 1-48 1- 3 8 11 1-32 �'`���_., 12 7-22 13 1r13 14 15 4-8 .16 1-8 , '_ii� °',�` 17 if IIII IIIIIIIIIIII■II■IIIIIII■ 1011111111111111111111111111111111 iidiVisipri, Plat. Book and Page SILVER BLUFF GARDENS 8=43 HE PINES 4-16, 1-16 1-20 1-32 1-32. :7 32 .7-32 1-32 4-3�+ .1- 2 1432 "SUPPORTIVE DOCUMENTS FOLLOW" ASTILES RESUBDIVISION 26-53 A REVISED PLAT OF LOTS 35-40, BLOCK 9 THE PINES 42-61 1-9' RESUB OF LOTS 17 & 18 OF BLOCK 15 OF THE PINES 30-5 1- IWO 11 12 13 SOUTH BAY ESTATES 5-54 1-5 12 Section 3. This IMPROVEMENT shall be designated in all proceedings and assessments as PINES SANITARY SEWER IMPROVEMENT SR-5450-C, (CENTERLINE SEWER), and the above -described properties, 4 7- including all the lots and parcels of land abutting the streets described in Section 1 hereof against which assessments shall be made for a portion of the cost thereof, hereunder, shall be designated as PINES SANITARY SEWER IMPROVEMENT DISTRICT SR-5450-C, (CENTERLINE SEWER), PASSED AND ADOPTED this day of 1978► ATTEST: CITY CLERK PREPARED AND APPROVED BY: ROBERT F. CLARK ASSISTANT CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: KNOX, JR., Maurice A. Ferre EY MAYOR "Sur-r,, r 1 r- Cu 1 iviENTs TO: i'oaeph R. cirassie City Manager FRo•4: William E. Parkes Director Department of Public Workt OF '.#IAMI• FLs ..?IDA MEm0,-2,11\4r), ;Art. ENCLC3tJ3 .•• 11� 11f� September 14, 1978 "` 5450 Resolution Ordering Pines Sanitary Sewer Improvement SR-5450-C (Centerline Sewer) and SR-5450-S (Sideline Sewer) (for September 28, 1978 Commission Meeting) In a continuing effort to serve Miami, plans and specifications are being prepared to provide sanitary sewers in the area bounded by S.W. 22 Street (Coral Way), S.W. 26 Street, S.W. 27 Avenue, and S.W. 37 Avenue. To Serve this area, the Department of Public Works has designed the Pines Sanitary Sewer Improvement, SR-5450-C, (Centerline Sewer), and SR-5450-S, (Sideline Sewer), as an assessable Improvement under Section 56 of the City Charter. THE DEPARTMENT OF PUBLIC WORKS RECOMI'IENDS ADOPTION OF THE RESCLUTION ORDERING THE PINES SANITARY SEWER IMPROVEMENT SR-5450-C (Centerline Sewer), AND SR-5450-S, (Sideline Sewer). 00 NAM JOB SCOPE tACt,.,.rSHEET PINES SANITARY SEWER IMPROVN NT S11.5450 & S, CIP N0, 84,60 Construction of a sanitary sewer improvement by private contractor under contract with the City of Miami at an estimated total cost of $3,700,000. REASON FOR Part of the City's continuing program to provide WORK sanitary sewers throughout the City of Miami. This district is bounded by S.W. 22 Street (Coral Way), S.W. 26 Street, S.W. 27 Avenue and S.W. 37 Avenue. SIZE OF AREA - Approximate Acres 330 • Approximate Population 11,600 SOURCE OF FUNDS - G.O. Bond - Sanitary Sewers PROJECT - This improvement was included in the 1976 Sanitary HISTORY G.O.B. Issue program presented to the electorate and is scheduled, in the 1977-83 C.I.P., to be under construction in 1978-79. The original Pines area has been divided into three improvements in order to make bidding more competitive by giving smaller contractors an opportunity to bid. These 3 improvements are titled Pines, Avalon and S. Bay and are all scheduled to be under construction in 1978-79. CURRENT ITEM FOR CONSIDERATION - To adopt a Resolution ordering Pines Sanitary Sewer Improvement SR-5450 C & S and designating properties to be assessed for this construction.