HomeMy WebLinkAboutR-78-0674RESOLUTION N0, '8 di 7 4
RESOLUTION CONFIRMING ASSESSMENT ROLL FOR
CONSTRUCTION OF BAYCREST HIGHWAY IMPROVEMENT
H-4373 IN BAYCREST HIGHWAY IMPROVEMENT DISTRICT
II-4373 AND REMOVING ALL PENDING LIENS FOR THIS
IMPROVEMENT NOT HEREBY CERTIFIED.
WHEREAS, the Commission of The City of Miami, Florida mot
on the 24 day of October, 1978, pursuant to due legal notice of
said meeting under Section 56 of the City Charter, as amended
to receive all written objections to the confirmation of the
preliminary assessment roll for the cost of BAYCREST HIGHWAY
IMPROVEMENT H-4373 in BAYCREST HIGHWAY IMPROVEMENT DISTRICT H-4373`'
on the following streets:
N.E. 80 Street (between N.E. 10 Ave. and N.E. Bayshore Ct.)
N.E. 83 Street (between N.E. 10 Ave. and a point 570' E. of N.E. 12 Ave.
N.E. Bayshore Ct. (between N.E. 79 Street and N.E. 81 Street); and
WHEREAS, no objections thereto by any person interested in,
or affected by, said assessments were sustained by the Commission,
and said assessment roll appeared, in all respects, regular and in
accordance with the reouirements and provisions of the City Charter,
as amended;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA,
Section 1. That the prima facie assessments, as apportioned
and indicated on the preliminary assessment roll for BAYCREST
HIGHWAY IMPROVEMENT H-4373 in BAYCREST HIGHWAY IMPROVEMENT DISTRICT
H-4373 be, and they are hereby, in all things, confirmed and
sustained against any and all lots or parcels of "g ound descr�J .
EX
therein. /�ff
ITEM NO.
Section 2. That the sums and amounts assessed against each
of the lots or parcels of ground in said preliminary assessment
roll are less than the amount that each of the said lots of parcels
of ground is especially benefited by said improvement and that
such amounts are in proportion to the special benefits that the
property received.
"SUPPORTIVE
DOCUMENTS
-1-
CITY COMMISSION 1
MEETING OF
OCT 3 1978
RES .UT10N NO., s.. ...........
MARKS:
4
11111111111MMIIMMinimmumm
MI
•
Section 3. That the total assessable cost of said BAYCREST
HIGHWAY IMPROVEMENT H-4373 1.n BAYCREST HIGHWAY IMPROVEMENT DISTRICT
H=-4373 in the amount of $28,153•63 be and the same is hereby,
approved and confirmed.
Section 4. That any pending lien in BAYCREST HIGHWAY
IMPROVEMENT DISTRICT H-4373 for highway improver:ents not appearing
in the preliminary assessment roll and not certified hereby, be,
and the same is hereby, canceled and removed.
PASSED AND ADOPTED this 24 day of OCTOBER
ATTEST:
PREPARED AND APPROVED BY
2
Assistant City Attorney
APFRO'_=.•sue TC FORM . ORRECTNESS:
y Attorney
MAURICE A. FERRE
"SUPPORTIVE
DOCUMENTS
FOLLOW"
1978•
7g-674
1
CITY Cr !A1,0,11. .`l_:,.'�'.•
'i,c::':SOnANCUM
A t1, 11! k11{
Jar
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII1I1II ■■� i
Joseph R. Grassie \r
City Manager
ce♦
/ i—`.
F,F William Er Parkes, Director
Department of Public Works
C.
Gepttl3T15,5 3gtP3 271_ j H=4373
Baycrest Highway Improvement
H--4373
f.%1:11.09URES.
Resolution Confirming
Assessment Roll
(for October '4, 19978
Commission Meetii )�
Construction of BAYCREST HIGHWAY IMPROVEMENT H-4373 in BAYCREST
HIGIWAY IMPROVEMENT DISTRICT H-4373 has been completed, and the
Preliminary Assessment Roll for this improvement is ready to be
presented to the Commission for confirmation.
This improvement consisted of some clearing and grubbing of the
street right of way, correction of base failures and grade
deficiencies, construction of a 3" asphaltic concrete base
approximately 22' wide, for necessary widening, construction of an
8" lirnerock base approximately 22' wide, a 1" asphaltic concrete
surface course, asphaltic concrete parking areas, mountable curb
and gutter, concrete sidewalks and modification of drainage system.
The increased traffic circulation that resulted in base failures,
as well as the fact that some streets were of sub -standard width
and out of grade, with inadequate drainage, made this improvement
necessary.
A Public Hearing is scheduled for October 24, 1978 to
ofno hear
objections
objections to confirmation of the assessment roll.
are sustained, the Department of Public Works recommends the adoption
of the attached resolution confirming the preliminary assessment roll
for BAYCREST HIGHWAY IMPROVEMENT DISTRICT H-4373.
PUBLIC tEARING ASSESSMENT ROLL
MEETING DATE: Ootober 24, 1978
JOB
AGENDA ITEM NO,
BAY CREST HIGHWAY IMPROVBMBNT H-4373
LOCATION
N.E. 81 - 83 Streets and Not. 10 Avenue to Bay
COST OF IMPROVEMENT: ESTIMATED ACTUAL ASSESSED
Front foot (gii4(Pavement) $ 2.98 $ 13.40 $ 3.35
Front foot (SW (Curb and Gutter) $ 2.15 $ 6.54 $ 1.63
Front foot (Sidewalk) $ 1.55 $ 7.11 $ 1.78
Lateral C/L (Average)(/Ft.) $ $ $
Lateral S/L (/Ft .) $ $ $
Square(Yd) (SX) (Pavement) (5XXXX, iX $ 2.44 $ 10.94 $ 2.74
Typical 50' lot ( fit) (Pavement) $ 149.00 $ $ 137.00
Typical 50' lot (30,)(Sidcwal.k) $ 77.50 $ $ 89.00
Number of parcels in District: 231
CONTRACTOR: L. C. Morris, Inc.
Amount $ 135,991.66
Started Work 2-10-75
PREVIOUS COMMISSION ACTION:
Final Cost $ 134,919.34
Completed Work 7-1-75
Ordered on 3-14-74 Confirmed on 5-9-74
Accepted work - Final Payment on 11-24-75
REMARKS: The following made this improvement necessary:
Streets that were sub -standard in width, base
failures, out of grade, inadequate drainage.
City Manager's Estimate: $3.80 - $7.60 per front foot
Actual $3.35 - $7.90 per front foot
Prepare
Form - PW #35G 5/72
E. M. Pelaez
September 1, R`t 78