HomeMy WebLinkAboutR-78-0796RESOLUTION iNO e ' # 7.0 0
A RE;,SOt UTION ACCEPTIN0 THE HILL OF •,Tr)E
RLINERTSON ED1:.Ji MEWP COM?~Aid IN • T1iE
At OUW1 or $5435757503 THE ALTI SATE.
I3A84E }3I1) I Of THE 1ROPORAL„ ?'fR `l'HE
CITY WIDE- SANITARV' SF�'.'JER EXTENSION
LllPFIOVCMENT sF� 5)I -,C sever)
IN THE CITY•1!TDE •SANITARY :SEWER E;XTLNSION ,
TNPIROVI?.fLPJT DISTRICT .SR=54hc=.0 (centerline
sewer) ; WITH -MONIES r'Fil:ptt;FOFL ALLOCATED•
RI1 -THE tt SANI'.TARY SEWER Ct .0-. 3(1 JTt ' F'JPiDtt
:'T. H Ai.)DITI AL MONIE S ALLOCATED FOR PROJECT.
AiJD TNCIOEtiTALEXT'Eft;tL. PROF! A ,0RESA1D FUND;•
AUTHOPI 1TP1i "'III? CITYFIAi�lnt�T,R ''i'O EXECUTE
5
,^ CONTRACT WITH SAID FTTfl
WHEREAS, sealed bids were received IJovernber 0, 1978
rior `he CITY WIDE SA?'1I�"AR'' SEWER EXTENSIoN:" I'IPRCY'EVfl NT
+Ii-511il;n.:f_' (centerline sewer) in the CITY WIDE S [ JTtTARV
SEWER EXTENSIONS IMPROVEMENT IT „I:R-5/1 (- -c (centerline
L-- er) ; ;and
WHEREAS , the resort- that the w543,757,5fl
bid o;' Joe Reinertson Equintnent Company `'or the Alternate
Bast, ?'1d T Circe the i'l n,n a l Is the lowest responsible bid
and
re<ommendp that a Contract be awarded to said firm; anti
WHEREAS, the Capital. Improvements Appropriation
Ordinance No. 3716, as amended, was adopted on October
1077, and monies; are available for the proposed amount of.
the Contract, I ro,i 'ct Expense, and Incidentals, Prom the
account entitled "Sanitary Sewer 1.0. Bond Funds" as set
{'nrth under Section 0, Item 2, of said Ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION
OF THE t-,TTV OF MTAnI, FLORIDA;
Section 1. The November 9, 1979 bid of Joe Reinertson
Equl nrtent Company in the proposed dntount of $5243,757.50 or
the pro,i0c1; entitled CITY WIDE SANITARY SEWER EXTENSIONS
1;'JPpC?','1aF 1t':<'i'1' SR-51 i4 v.-C (centerline sower) in the CITY s l-rDl
SANImrt v SEWER EXTENSIONS IMPROVEMENT DISTRICT sR-51I11u8-C
"DOCUNNGlti_ tWit.X
ITEM NO
L'Ig CI
.4,:
r 7r1•s;1 t ,..•
r.
CITY COMMISSION
MEETING OF
DEC i 4 1978
R SOIATIQM PPO,r ,; ".. �.
REMJIRI ..,„ ,f ,t;
(centerline sewer) for the Alternate Base Bid I o' the
Proposal i based moult pric.?s y is hereby accented at the
trice stated therein to cover the cost of said Contract,
n r 5 i.:� hereby
Section 2. The amount or ;fi1� � s 1 ?7 ► �0 1_
allocated from the accounl entitled "Sanitary Sower 0,0,
Bond T,,ut ds° to cover the cast or said Contract,
;section 3. The amount or 5°,813,50 is hereby
allocated from the a 'oresaid Fund to cover the cost
Project Exuen '.
Section II, The amount or $1fl,375.00 is hereby
allocated from the a`'ore said Tound to cover the cost of such
Incidental items as advturtisin , testing; laboratories, and
noel. ac,o i
Section 5.- The,City Man ger 1s•horeb;'•authorized
-to enter into - a Contract on behalf
of The City of Miami
with Joe Reinertson Equipment Company for CIT'' WIDE SANITARY
SEWER EXTENSIONS IMPROVEMENT SR-54437C (centerline sewer in
the CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT DISTRICT
R-.54 4 3-C (centerline sewer), !\ltenate Base Bid I of the
Proposal.
'A USED AND ADOPT
C ty Clerk
PREPARED AND APPROVED BY
t�l! is
ASSISTANT. CITY ATTORNEY
APPI J i AS TO FORM
City
RRECTNESS i
r '1
713s79G
'oseph R. Crrassie
City Manager
Donald W. Cather
Director
Dip.kar,IMent of public Works
JL
•
NoveMber 27, 1978
8 5448
CITY WIDE SANITARY SEWER
EXTENSIONS IMPROVEMENT
SR.5448.4 Resolution
Awarding Contract
(for December 14, 1978
Commission Meeting)
Bids were received November 9, 1978 for the construction
of 10,0004' linear feet of 8-inch to 18-inch extra strength
vitrified clay, cast iron and ductile iron pipe sewer with
the deepest cut being 10 feet; 5,2001' linear feet of 6-inch
extra heavy cast iron soil pipe laterals; 44± manholes from
4 to 10 feet in depth; and sidewalk and pavement replace-
ment. The location is the area bounded by N. W. 20 Street.
on the north, the Miami River on the south, N. W. 27 Avenue
on the west, and on the east by N. W. 17 Avenue.
As reflected in the Tabulation of Bids, the $543,757.50
bid of Joe Reinertson Equipment Company is the lowest
responsible bid for the Alternate Base Bid I of the
Proposal.
THE DEPARTMENT OF PUBLIC WORKS AND THE CITY MANAGER
RECOMMEND ADOPTION OF THE RESOLUTION AWARDING THE BID
RECEIVED NOVEMBER 9, 1978 OF JOE REINERTSON EQIJIPMENT COM-
PANY IN THE AMOUNT OF $54 3, 757. 50 FROM THE ACCOUNT ENTITLED
"SANITARY SEWER G.O. BOND FUND"; AND AUTHORIZING THE CITY
MANAGER TO ENTER INTO A CONTRACT IN BEHALF OF THE CITY OF
MIAMI FOR CITY WIDE SANITAR>' SEWER EXTENSIONS IMPROVEMENT
SR- 54u8-C (centerline sewer) in CITY ,•JIDE SANITARY SEWER
EXTENSIONS IMPROVEMENT DISTRICT SR-54.48-C (centerline
sewer).
r'
ir ; l 1 j.
7CM.796
tm_AWABDIOT S.ttaT
For The City•Manager
B.5448
O C '_NAME.,&_ LoCATIQW CITY WIbE SAWITAR? SEWER EXTENSIONS
IMPROVEMENT 8R-5448-C
N, W, 20 St, to Miami River froth NWs 17
Ave, to N,W, 22 Ave,
Construction of a sanitary sewer itnprovernent
of centerline sewers in the unsewered
portions of the above area.
ESTIMATED
CONSTRUCTION
COST
DATE BIDS
RECEIVED
NUMBER OF
BIDS RECEIVED
NAME OF LOW
BIDDER
AMOUNT OF.
LOW BID
TOTAL FUNDS TO
BE ALLOCATED
LENGTH OF TIME
ALLOWED FOR
CONSTRUCTION
SOURCE OF FUNDS
Form PW #389 6/76
$50O,00a.00
November 9, 1978
Two
Joe Reinertson Equipment Co.
$543,757.50 Alternate Base Bid I
110 working days
G..O. Bonds - Sanitary Sewers
City Mariciir, -City-Clerk
Received by the City Commission, City Clerk. City of
icensed 1 !Insured -os Per City Coda S.
Bid Send Amount
TOTAL
53 2 4-7 >f
1
•1
NRREGIJLAR1TIES LEGEND
A —1No Power -roc- Attorney
8 4-
IC=Carrected 'Extensions
1 — Proposal Unsigned or improperly S.gnet! or Nc Corporate. Seal
1G Improper Bid Bond
- C.arrect.d B.d
=
'i
III
TABULATION OF BIDS FOR
•� -, �_-A. M. e+r -�' ..
Miami, Florida of
TOTAL
1'Of:-; tit 1. -! '
i
i
"N. / .P a.
,�_
t,
TOTAL
PyeD. 'By: Ali T �
ef' nrm 34.7 n 1, l /77