Loading...
HomeMy WebLinkAboutR-78-0790REsOLNTION NO. W A RE8OLN1ION ORDERING CITY WIDE SANITARY SEWER EXTENSIONS IMPRbVEMENT=FLAGLER STREET 8R-S4S8-Ci (centerline hewer), AND DESIGNATING THE PROPERTY 'SUPPORTIVEAINST WHICH SPECIAL A88E884ENT8 SHALL EE MAbE R A PORTION OF THE COST THEREOF AS CITY WIDE DOCUI VNVTARY SEWER EXTENSIoNs IMPROVEMENT-FLAGLER R ET DISTR±CT 8R-5458-Ct (centerline se'We `) FOLLOW" BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMi, FLORIDA: Section 1. That a sanitary sewer improvement identified as CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT-FLAGLER STREET SR=5458=C, (centerline sewer), shall be made under the provisions of Section 56 of the Charter of The Cityof Miami, as am ` ended, said IMPROVEMENT to consist of: Laying a 8-inch or larger Vitrified Clay and/or Iron Pipe Sanitary Sewer at or near the centerline of W. Flagler Street from W. 27 Avenue to W. 42 Avenue. Laying a 6-inch or larger cast iron pipe laterals, as required to the lots and parcels of land which abut upon the abovementioned streets, including the lots and parcels of land described in Section 2 hereof; together with necessary manholes, other appurtenances, pump stations, outfall, connections to the existing sewers, relaying street pavement, sidewalks, and curb and gutters where such relaying is made necessary by this improvement. Section 2. Special Assessments for a portion of the cost of said CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT-FLAGLER STREET SR-5458-C, (centerline sewer), shall be levied upon all the lots and parcels of land which abut upon the abovementioned streets, including the following described lots and parcels of land, and such lots and parcels of land are hereby designated CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT-FLAGLER STREET. I glIAT y To each of the lots and parcels of land which abut upon the abovementioned streets, including the following described lots and SR-5458-C, (centerline sewer) . parcels of -land to -the proPertY line•of which a Sewer "steiritlaft4MiSSION MEETING OF DEC. 1978 R4414110111tt!Tt lt}t ,1.T111 'Rr T1$16'tiltf,t11tt E1f1R!!E�_ laterals lbw laid r will be a46egg0d .the avetage cost f that i ate a or 1atefal' , uhde the preVisibhs df Sedtiai S6 of the Charter of • The p ity c iai i r ae ateiided St bIVISION__ P.LAT 1OOf _MILD,tAGt ,GC _t ANbL tA51, HIHISCUS TERI CE 3-20 1 and 2 ROYAL HOME PLACE 6-28 1 1 and 2 2 1 and 2 ELDORADO HEIGHTS 5t72 13 10 thru 18 14 13 thru 24 15 4 thru 6 TWELFTi1 STREET MANORS 1ST ADDITION 5-67 6 23 thru 26 7 23 thru 30 8 23 thru 30 TWELFTH STREET HEIGHTS 6-94 1 24 thru 26 2 24 thru 26 TWELFTH STREET MANORS 5-59 10 11 thru 20 11 11 thru 20 30 8 thru 22 31 10 thru 27 41 51 thru 54 CHURCHILL ESTATES SEC. CHURCHILL ESTATES TWELFTH STREET MANORS SEC.3 6-162 IIAII 45-44 CENTRAL PARK HOUSTON HEIGHTS COLLINGWOOD SAGINAW PARK ARDMORE.HEIGHTS AUaURNDAI.,E .AMENDED KIRKLAND IMIGUTS AMENDED 44-64 5-57 3-215 18-9 4-4 6-90 10-77 15 12 thru 21, 23 9 7 thru 12 I0 8 thru 14, 11 17 2 19 thru 22 4 19 thru 22 6 10 4 thru 13 1 thru 12 1 thru 3 48 thru 50 1, 4 and 5 1, 4 and 5 1 thru 3 48 thru 50 1 and 2,124 and 125 149 thru 164 3-214 1 3 thru 6. 8 3 and 4 9 2 thru 6 « PP R-T-14 2 thru 7 DOCUMENTS FOLLOW" 78 '790 gU bI WS to.N• STAbLEE OROVE AbbIN NO, STABLE t O zt Vt METES A Tb $OUND5 S 275 FT OF W 243 FT OF S 3/4 OF SE 1/4 OP NE 1/4 LESS ST Sec. 4 T 54S R 41E W 220 FT OF E 1100 FT OF S 3/4 Or SE 1/4 OF NE 1/4 LESS ST Sec. 4 T 545 R 41E W 440 FT OF E 880 FT OF S 3/4 OF SE 1/4 OF NE 1/4 LESS ST Sec, 4 T 54S R 41E Section 3. This IPMPROVEMENT shall be designated in all proceedings and assessments as CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT-FLAGLER STREET SR-5458-C, (centerline sewer), and the above -described properties, including all the lots and -parcels of land abutting the streets described in Section 1 hereof against which assessments shall be made for a portion of the cost thereof, hereunder, shall be designated as CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT-FLAGLER STREET DISTRICT SR-5458-C, (centerline sewer) PLAT : AO0R ANI0, PAdE $LOa _AT 12m42 1 1 thrti S 2 1 thru 2 3 3 1 thru 10 0 187 1 1 thru 6 2 1 thru 6 1 thttu 6 4 1 thru 6 PASSED AND ADOPTED this 14th day of December , 1978. MAURICE A. FERRE ATTEST: IT CLERK PREPARED AND APPROVED BY: ASSISTANT CITY ATTORNEY - APPROV �'S 'TO FORM CORRSCTNE5S; C TY...ATTORNE MAYOR r0 *`6sepi. Ri arassie pity Managet' d ) Donald W. Cather, Director Department of Public Works IOvetnbe9 i9 Resb1UtiOn Ordering.tlTY_Wib- AI\ttTARY:. SEWER•EkTENStON8 IM'ROtrEMENT 'LAC LER STREET SR (Getteri.ine.' Sewer) (For December i4, i978 Commission meeting)• In a continUing effort to serve Miami, plans and .specifica- tions are being prepared to provide sanitary sewers ih West Flagler Street from West'27 Avenue to West 42 Avenue, To serve this street, the Department of Public Works has designed City Wide Sanitary Sewer Extensions Improvement Flagler Street SR-5458-C, as an assessable improvement under Section 56 of the City Charter. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS ADOPTION OF THE RESOLUTION ORDERING THE CITY WIDE SANITARY SEWER EXTENSIONS IMPROVEMENT FLAGLER STREET SR-5458-C (centerline sewer). JTW: sw ••• �•�• c w 1 r t � � Q t v ;) J0 3 NAMP t 3OB SCOPE; REASON FOR WORK: SIZE OF AREA: PROJECT HISTORY: `ACT ' SItEnT City. wide Safiitary •tenter Eitetisiohs tttiprovemeht Fiag.er.Street 8r151184 C, •P• 70 2 Construction of a sanitary sewer improvement. -by. private Oontractor under contract with the City Of Miami at ari estinated total cost•of $U.00, 000.00.• This district -will provide sanitary sew sewers -in West Flagler-Street from 1/West 27.Avenue to West 142 Avenue. Part of the City's continuing program to provide sanitary sewers throughout the City of Miatni. This district is being constructed prior to the adjacent districts due to the proposed rebuilding of Flagler Street by Dade County beginning in May of 1979. Approximate Acres Approximate Population 65 5,300 This improvement consists of a portion of Flagler Street'formerly included in the Kinloch and Auburn Districts and will remain inactive until the balance of these two districts is constructed in approximately 3 to 5 years. Billing of assess- able properties will not take place until activation. of sewers.