HomeMy WebLinkAboutR-78-0787Rt,Sot,tJTiOW t4O.� ' . 8 " `
A RE8OLOTION•ACCEPi1IN( THE COMPLETED WORK.
P8Rti'ORMED 8Y CORPORATION AT A•TOTAL
COST '.OP 5. 5896 ,03 FOR -THC PIXIE PARK
PAVING PROJECT' AND AUTHORIZIW( A FINAL
PA �7EI'JT OV $6y902 9.9
WHEREAS, there exists a contract dated June 8, 1978
between the City of Miami and P:N.'M Corporation; and
1JIItRTAS, the work has been satisfactorily completed,
a,icl P.I.M. Corporation has furnished the required documents
certifying° that all bills f'or labor and materials have
paid in full in connection with the aforesaid contract; and
WHEREAS, the City Manarer and the Department of Public.
Works recommend that the completed work be accepted and final
payment made to the contractor;
,:?OW, THEREFORE, BE TT RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLOFIPA:
Section 1. The completed work performed by P.N.M.
Cornoration fors the DIXIE PARK; PAVING PROJECT at a total cost
of $5 1 ,S t .0'; is hereby approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $6,90 .99 as full and final payment
all work performed and all materials furnished in connection
for
with the . DIXIE PARK PAVING PROJEC
PASSED AND ADOPTED this 14thday of
PREPARED AND APPROVED BY:
RC)I3ERT. F,• CLARK
�, T •. T t ATTORNEY,
A��l:,��AIJ� CITY AC�C)RNE.
been
APPROVED ASS TO FORM AND CORRECTNESS;
E0• E F. KNOX
I ATTORNEY
' ITY COMMISSION
MEETING OF
DEC 4, 4 1978
ttbelph R, OPassie
dity Manager
4k� .t
Wald W, Cather
Director
Department of Public Works
DIXIE PARS{ PAVIq PROJECT
Resolution for Final Payment.
(for December 14, 1978
Cotnrieeion Meeting)
P.N.M. Corporation has completed the project consisting
of constructing a roadway, including asphalt pavement,
concrete curb and gutter, sidewalk, and drainage modifi-
cations. The project is located on the south side of
N. W. 14 Street from W. W. 3 Avenue to approximately
550 feet west, and on the west side of N. W. 3 Avenue
between N, W, 12 and 14 Streets, The original contract
amount was $59,296.72, but the completed contract amount
is $544,896.03, and it was completed on time.
It is now in order for the Commission to accept the
completed work and authorize final payment, after all
conditions are met.
THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION
OF A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHOR-
IZING A FINAL PAYMENT OF $6,9O2.99 TO P.N.M. CORPORATION.
FOR THE DIXIE PARK PAVING PROJECT.
1
0t3 t\tAP�E
Oat�'13�'.AC_TQ
•JOB•SCO1''
- R1 ASON -. •
FOR ItOf?J:,
.SOURCE OF
FUI�mS
I VAL Ord POCTzO. T161 'JF ,
• FOR 5111- :. T^` PIANAGER • -
Dixie Park raving Bt'oject E-4410
PJT.M. Corporation
Construct roadway including asphaltic pavement, •Concrete
curb and putter, sidewalk,. and -modifications. to .existih
drainage located on the south •side. of 1.4 Street froi
N.W. 3 .Avenue to 5501 .west: and On the. west side of N. 1.-
3 Avenue•between N. W. 12414 Streets.
Develop street to full width and eliminate drainage
probleMs.
Highctay G.O.Bond Funds
PROJECT Bids Received 5/10/78
HISTORY Contract Awarded 5/31/78.
Preconstruction Meeting: 6/21/78
CONTRACT
TIME
STARTED 7/21/78
CONTRACT
TIME 60 Working days
SCHEDULED
COMPLETION
DATE
10/13/78
ACTUAL
COMPLETION
DATE 9/15/78
BTD AWWr)UIIT5a,29h.72
CONTRACT
FiNAL COST $5'4,896.03
CURRENT
ITEM FOR
CONSIDERATTON Resolution to accept completed work and
final payment to,the contractor.
authorize.
r 78 787