Loading...
HomeMy WebLinkAboutR-78-0787Rt,Sot,tJTiOW t4O.� ' . 8 " ` A RE8OLOTION•ACCEPi1IN( THE COMPLETED WORK. P8Rti'ORMED 8Y CORPORATION AT A•TOTAL COST '.OP 5. 5896 ,03 FOR -THC PIXIE PARK PAVING PROJECT' AND AUTHORIZIW( A FINAL PA �7EI'JT OV $6y902 9.9 WHEREAS, there exists a contract dated June 8, 1978 between the City of Miami and P:N.'M Corporation; and 1JIItRTAS, the work has been satisfactorily completed, a,icl P.I.M. Corporation has furnished the required documents certifying° that all bills f'or labor and materials have paid in full in connection with the aforesaid contract; and WHEREAS, the City Manarer and the Department of Public. Works recommend that the completed work be accepted and final payment made to the contractor; ,:?OW, THEREFORE, BE TT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLOFIPA: Section 1. The completed work performed by P.N.M. Cornoration fors the DIXIE PARK; PAVING PROJECT at a total cost of $5 1 ,S t .0'; is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $6,90 .99 as full and final payment all work performed and all materials furnished in connection for with the . DIXIE PARK PAVING PROJEC PASSED AND ADOPTED this 14thday of PREPARED AND APPROVED BY: RC)I3ERT. F,• CLARK �, T •. T t ATTORNEY, A��l:,��AIJ� CITY AC�C)RNE. been APPROVED ASS TO FORM AND CORRECTNESS; E0• E F. KNOX I ATTORNEY ' ITY COMMISSION MEETING OF DEC 4, 4 1978 ttbelph R, OPassie dity Manager 4k� .t Wald W, Cather Director Department of Public Works DIXIE PARS{ PAVIq PROJECT Resolution for Final Payment. (for December 14, 1978 Cotnrieeion Meeting) P.N.M. Corporation has completed the project consisting of constructing a roadway, including asphalt pavement, concrete curb and gutter, sidewalk, and drainage modifi- cations. The project is located on the south side of N. W. 14 Street from W. W. 3 Avenue to approximately 550 feet west, and on the west side of N. W. 3 Avenue between N, W, 12 and 14 Streets, The original contract amount was $59,296.72, but the completed contract amount is $544,896.03, and it was completed on time. It is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHOR- IZING A FINAL PAYMENT OF $6,9O2.99 TO P.N.M. CORPORATION. FOR THE DIXIE PARK PAVING PROJECT. 1 0t3 t\tAP�E Oat�'13�'.AC_TQ •JOB•SCO1'' - R1 ASON -. • FOR ItOf?J:, .SOURCE OF FUI�mS I VAL Ord POCTzO. T161 'JF , • FOR 5111- :. T^` PIANAGER • - Dixie Park raving Bt'oject E-4410 PJT.M. Corporation Construct roadway including asphaltic pavement, •Concrete curb and putter, sidewalk,. and -modifications. to .existih drainage located on the south •side. of 1.4 Street froi N.W. 3 .Avenue to 5501 .west: and On the. west side of N. 1.- 3 Avenue•between N. W. 12414 Streets. Develop street to full width and eliminate drainage probleMs. Highctay G.O.Bond Funds PROJECT Bids Received 5/10/78 HISTORY Contract Awarded 5/31/78. Preconstruction Meeting: 6/21/78 CONTRACT TIME STARTED 7/21/78 CONTRACT TIME 60 Working days SCHEDULED COMPLETION DATE 10/13/78 ACTUAL COMPLETION DATE 9/15/78 BTD AWWr)UIIT5a,29h.72 CONTRACT FiNAL COST $5'4,896.03 CURRENT ITEM FOR CONSIDERATTON Resolution to accept completed work and final payment to,the contractor. authorize. r 78 787