HomeMy WebLinkAboutR-78-0755• HESOLUUTI(1t'I No,
A t ESOLIITION (';OUJ IRt9Tt3C AND RATIFI`IN+ THE
ACTION OF THE. CITY-MANAr1CR INACCFPTIN1
- THE: BID ANC) EXECUTIN4 THE CONTRACT FOR
TII1; ORANt)E- PO1JL TTC'hFT OF+FTCE•RCNOVATION
197B WITH MET. CONSTRUCTION-INC, IN - THE •
-AMOUNT OF ez;30071 FOR THE BA`7E I3ID t'1TTH
FUNr)s ` HEREIrOR -To -BE 1X1.IE1 D1 1) FROM TH1T
"ORANGE BOWL Et'JTERFR I SE FUND"
"SUPPORTIVE
DOCUMENTS
i� WHEREAS., the �.1npropriat ions ordinance for±~fiscal
FOLLOW 7 C} S a a r i a' amended to
y�-fir 1977 8, adopted L�ec Mbe 16, 1' 77 y
date, provides for increasing the appropriation - ' Or the
i3Oran T Bowl Enterprise ruu<19 which will be needed to
accomplish - nec('ss r' It11p)rovet?ment s'y- and
`„HEREAS, construction relating to the ORAN(IE- BO"L -
TICKET OFFICE RENOVATION - 1978 should- commence accordingly;
and
!:!HE EA,., Resolution No. 79-531dated July 28, 1978,
authoi +ed the city Manager to accept and receive bids and
award contracts `'or the various phases of construction
related to (?ranfrC: Bowl Improvements; and
WHEREAS., three bids were received September
and
'•'HEREA , the City •lana rer : foutld that the 30;774 bid
of MET on,-tructit. i1, Inc. is the lowest responsible bid for
the OIRAII zE BOWL TICKET OFFICE RENOVATION 1978; and
WHEREAS, by authorization -of Resolution'No. 73-531
the City Manager entered into contract agreement with the
above indicated firm to commence _ work immediately;
NOW, THEREFORE, BE IT :RESOLVED BY THE COMMISSION OF r "DOCUMEMT INDEX
a. II I� CITY OF It•1 I A.1 �. , FLORIDA;
TP14n
Section 1 The action (p' the Ci y anar.e — in
accept MP, the bid e.;t' MET Construction, Inc, for the ORANGE
Bon TICKET OPFICE RENOVATION - 1978 is hereby confirmed
irmed.
nd Tati'led, with funds therefor to he exnended from the
'tO1'Fni,, ' Bowl Et)tct.r Iris Funds, as provided by Ordinance
No, 8827 amending Ordinance No, 8731, adopted
)aCit t MM1$M 7 +
MTET1NG OF
14i978
Section 2. s The Acttoh o ' the City Mana et1 in
e x
ecutinr,, the contract VIET Construction; Inc* ih
the amount of 430774 ,for the ORAHOE BOWL TICKET OFFICE
RENOVATION 1978 18 het'Ohy con 'irtecl and ratified
PASSED AND ADOPTED thi8 14tday of bed r,
978
.Maurice A.- Verre
MAURICE.A. FERRE
0 R
ATTEST:
ALP 'q. 01. IE
t;IT.
CLERK
'
pREPAPED•P=ND APPROVED By::
RO[ ERT t' . •CLARh, ASSI3`' Ai`J T CITY A l ORNE
APPRO\T„D -AS.. TO FORM ANT) CORRECTNESS :
• .Cr ',ORC.' a F. Ki 0 , , . C (`1 Y. ATTORNEY
41/0
Joseph h► Gras sie
City Manager
Donald W, Cather
Director
Department of Public Works
November 21 1978.
OPA=•=CAE BOWL TICt;ET OPTIC -
R)aPJ WAT OC1 .. I978
Resolution -Ratifying and.
Confirming
(for, becerther l)4 5 978.
Commission -Meeting)
Please place an item on the December 14, 1978 Agenda to ratify and.
confirm the actions of the City Manager in accepting the bid and
executing a contract for the interior modifications to,the 'Miami
Dolphins (Gate 144) Ticket Office at the Orange Bowl Stadium,
This action is necessary to confirm the actions taken by authority
or Resolution No. 78-531 dated July 28, 1978, which authorized
the City ;Tanager to receive bids and award contracts, as necessary
so that work will commence accordingly
This project was properly advertised, and three bids were received
on September 6, 1978. The low bidder, Carl J. Hoenes, Inc., has
respectfully withdrawn his bid due to the 60-day time lapse after
the date of bid openings. The proposal of MET Construction, Inc,
in the amount of a30,774 was the second lowest responsible bid
received,
The Department of: Public Works reviewed the proposal, and, after
discussions With Mr. R. L. Jennings, Director of Stadiums and
Marinas, recommendation was made to award the contract as 'above
:specified,
To commence _work immediately, the City Manager was authorized by
787531 to execute a contract
Resolution No.
THE CITY . ': NAGER, THE DEPARTMENT OF PUBLIC WORKS,: AND THE DEPARTMENT
OF STADIUr-; AND ,Af INA S, RECOMMEND THE ADOPTION OF THE ATTACHED`.
RESOLUTION ^Ott; IRMING AND RATIFYING THE ACTION OF THE CITY MANAGER
AS AUTHORIZED By RESOLUTION NO.- 78-1531 DATED JULY 28-, 1978`IN
ACCEPTING THE BID AND EXECUTING THE CONTRACT FOR THE ORANGE BOWL -
TICKET OFFICE RENOVATION - -1978 IN THE AMOUNT OF $ 30 , 774.
JAH:hc
't
j j! p •+
83D_A9A 814T
For The City Manager
ROC�WMM4 &.L 'AT ot? •Otaft1 foci-Tidket aftice eii ti ii -ip18
B=260 1400.4, W. 4 Street •
oJ7tOr -L$OoP.v
ESTIMATED
CONSTRUCTION .
DATE BIDS
RECEIVED
NUMBER OF
BIDS RECEIVED
NAME OF LOW
BIDDER
AMOUNT OF
LOW BID
TOTAL FUNDS TO
BE ALLOCATED
LENGTH OF TIME
ALLOWED FOR
CONSTRUCTION
SOURCE OF FUNDS
Form PW #389 6/76
•M kixq interior renovatiohe tO the
ticket offioe of the• Miami b 1phit .
1.ocatea 'at - Cate` 14 of•the Orange Bowl.
$20i000.00
9/6/78
MET Construction, Inc.
(2nd Low Bidder)
$30,774..00
$34,774.00
Twenty (20) working days.
Orange Bowl Enterprise Fund
ORANGE B0t4L = TIC1ET •OFFICE RENOVATION
JOB N04 E=2759
CONTRACTORS S FACT 8448E4
.
MET Construction, Inca
355 Ni- W. 54 Street
Nliatrii, Florida 33127
II. Principals
III. Contractor is prop
Phone: 757-95
Major E. Threlkeld, President.
Betty Yo Threlkeldi Secretary °= Treasurer
R. L. Hardegree.
rly licensed and insured.
IV. Subcontractors: None
Experience:
This is a new corporation and has been in operation for
approximately ten months. This company was previously
called Biscayne Construction Co. which contracted many
jobs with the City. The same principals operated the
new company.
MET Construction, Inc,
The Trade Fair of the Americas
Orange Bowl. Structural. Repairs
Orange' Bowl -Lower. Press Box Refurbishing
Biscayne Construction Co.
Orange Bowl Water Main Changes
Orange Bowl - Structural Repairs -
Orange Bowl - Roll -Up :Door Replacement
Parks Hard Surface Courts (Henderson Park)
Oran Bowl - Spiral Ramp Doe's Replacement
Ph. IV
VI. NOT A MINORITY CONTRACTOR
VIII `43 Advertisements mailed out by Certified Mail
24 Advertisements mailed out by Regular. Mail
5 Contractor::, picked up Plans and Specifications
3 Contractor submitted bid
$110,000
205,300
30,000
$ 36,700
365,000
30,000
32 , 000
85,000
1101
0. E.,
lBiddrt
1Lrcrensed 1. Insured as or City Code S Metro Ord.
id Bond Amount
TABULATION OF BIDS FOR
r,• _
.._" Vim..
City Manager, City Clerk �" • '
Received by the €i.;.-Camr.is.i»ir, C::, Cletk, City of Miami, Florida at -I-' 2 P. M.
IN
I rregul orit:res
;Item
ENo.
DESCRIPTION
r
if
1I1 •
Unit
Price
Total
r
Unit
Price
Total
Unit
Price
Total
Unit
Price
Total
Unit
Price
Torop
Unit
Price
Tamil
/
•t i•
?i9 y,
3%,l-,•f�
s'
rV
jr'!'/1i•rl,1 rare n, •
L/gR
?_ Pi-
s, �•r�31`•.
DOC
IRREGULARITIES 'LEGEND
A ,- lNo sower-�of- Attorney
-
C - Corrected 'Extensions
- Proposal Unsigned -or improperly 'Signed or No Corporate Seal'
G ...Improper Bid Bond
1F'I-,Corrected Bid
ORTIVE
Af
rs
LOW'
IT IS RECOMMENDED THAT G
a/Y740///,• 14o sc
A%
Cc7/7 iirifC=
4-1,Sr; .
�7;1l
t
1-1
f a�
._ L
DLS.TRLBUTI.ON'i
B PDP
aEr, 14,a
lPtep. !By: