A RESOLUTION Ct IJFIRMINcI 4ID IRATIFYINi THE
AC IOt OP THE CITY AAidA(EH IN•ACCEP T ItT( THE
BID AUP EXECUTI140 THE CONTRACT Ft ti TIIE
ORANGE' BOA LOWER PTIESS - BOX Et PURBISHIt1C
PHASE 1 ' ITH MET COWSTRUCT ION; Ii1C r I 1 T HI
_AIMOUNT -01?-$29,756 FOR THE BASE BID,- WITH.
FUWDS THEREPOH 'I'0 BE EXPENt)ED FROM THE'
i'0RANGE BOWL ENTERPRISE FUWD'r
WHEREAS, the appropriations ordinance for fiscal
year 1977-.78, adopted December 16, 19775 as amended to
date:, provides ror increasing the appropriation for the
"Orange Bowl Enterprise Fund" which will be needed to
accomplish necessary improvements; and
WHEREAS, construction relatinr to the ORANGE BOWL -
LOWER PRESS BOX REFURBISHING - PHASE I should commence
accordingly; and
WHEREAS, Resolution ` n. 78- 931 dated ,July 28, 1978)
authorizd the City t•1anarer to accept and receive bids and
award contracts for the various phases o" construction
related to or znre I3ow1: Improvements; and
"SUPPORTIVE
WHEREAS, one bid was received Aiirust 21, 1978; and
Sv (- l� Lfl��iVE
WHEREAS, the CityI.1ana�;er #: c�im�3 that the $29,756 bid
FOLLOW"
"oo MET Coi; F struction, Inc. is the lowest responsible id for
the ORANGE BOWL LOI•IFR PRESS BOX REFURBISHING - PHASE I; and
WHEREAS, by authorization of Resolution No. 78-531
the City P1anaaper entered into contract agreement with the
above indicated firm to commence wori•, immediately;
MOW, THEREFORE, BE ' IT RESOLVED BY THE LOMII9tKOF
THE C 19' v OP r1IAMI , FLORIDA: -.aCUM -'` �+
111
�T�� No.
Sect, iori I. The action of the City iV anarer in accepting
the low bid of MET Construction, Inc. for tl e ORAUOF BOWL -
LOWER PRESS BOX REFURBISHING - PHASE I is hereby confirmed
and ratified, with funds therefor to be expended from the
"Oranc;fl Howl Enterprise Fund", as provided by Ordinance No, 8827
amending Ordinance No, 8731, adopted December 16, 1977.
• 9!O!''1!!!ll�l!.}•TT,T11.'R#'tIR�I+x
CITY COMMISSION
MEETING OF
DEC . 4 1978
MUM 7,. "' 7...4
Section• 2.1 The action of the City iiianarer in
eY,ecntlh the contract With MET donstructiof, Inca in the
mount of $293756 foie the ORANOE F3OWL LOWER PRESS BOX
REI+'t 11 I8H7 iJ0 PHASE I i s .hereby confirmed and rat i *"ied ►
PAS;;EI) APJD: AIJOPTED•t;hic. t4th day oi' T)ecefhbe
I978
ATTEST:
Maurice A. F'erre
(MAU RI CE •A . FEI ARE
M A v 0 R.
R. PH G. OPIC;IE
'CITY:CLERK
PREPARED AND APPROVED BY:
1,4
rvi
ROBER`f P. CLARK, A :SISTA;J'.� - CI` `Y AT IORNEY
APPROVED AS TO FORM LND CORRECTNESS:
(NOX,"tTR. , •,('LTV
'ORNE Y
f)OC7 JP. RTIVE
( �:• 4 , )I .,: ,,
ffit
Joseph As Crassie
dity Manager
DonaldW. Cather
Director
Department1 of Public Works
•
.ems r -:--
November 20 1078 ,: Bga2758mA
ORANGE BOWL LOWER PRESS $0R
REFURBISHING ga PHASE I
y r . t
Resolution Ratifyin,;cs
and
ConfirminF
(for Commission Meeting of
December 14, 1978)
Please place an item on the December 14, 1978 Agenda to ratify
and confirm the actions of the City Manaer in accepting the bid
and executing a contract for the construction of a new suspended
ceiling and installation of new lighting: fiXtures, two new air
conditioning ducts, and refurbishing of existing partitions.
This action is necessary to confirm the actions taken by authority
of Resolution No. 78-531 dated July 28, 1978, which authorized
the City Manager to receive bids and award contracts, as necessary
so that work will commence accordingly.
This project was properly advertised, and one bid was received on
August 21, 1978, The proposal of MET Construction, Inc. in the
amount of $29,756 was the lowest responsible bid received.
The Department of Public Works reviewed the proposal, and, after
discussions with Mr. R. L. Jennings, Director of. Stadiums and
Marinas and Mr. James H. Steeg, Business Manager, Miami Dolphins,
recommendation was made to award the contract as above specified.
TIIE CITY 9A1'1AGER, THE DEPARTMENT OF PUBLIC WORKS, AND THE DEPART-
MENT OF STADIUMS AND MARINAS, RECOMMEND THE ADOPTION OF THE
ATTACHED RESOLUTION CONFIRMING AND RATIFYING THE ACTION OF THE
CITY MANAGER AS AUTHORIZED B.Y RESOLUTION. NO. 7.8-531, DATED. JULY. 28,
1978 IN ACCEPTING THE BID AND EXECUTING THE CONTRACT FOR THE
ORANGE BOWL LOWER PRESS BOX REFURBISHING PHASE I WITH MET
CONSTRUCTION, INC. IN THE AMOUNT OF $29,756.
JAH:hc
IMM
MEM
•
8If) AWAAt ttrEtt,
FOP Thd City Manager
PR I'__. AM &.., LOC AY IOW ORA L t E F30WL LOWER 15R888 Box RE 'URBI HIN(
?HAS-8- I3 1400 W, W, 4 Street
ESTIMATED
CONSTRUCTION
COST__�..,..._�:--_;.
DATE BIDS
RECEIVED
NU14EER OF
BIDS RECEIVED
NAME OF LOW
BIDDER
AMOUNT OF
LOW BID
The' construction of a neW susOehded
ceiling and installation of new l ghttnk.
. fixtur1es two neti•air' conditiohing. dUots ,
and ref urbishing. of existing; partitions..
$16;000 oo
August 213 1978
MET Construction, Inc.
$29 , 756.00
TOTAL FUNDS TO 62?.fl0
BE ALLOCATED $33,
LENGTH- OF TIME
ALLOWED FOR
CONSTRUCTION
- SOURCE OF •FUNDS
For:n FW #33 6/76
15 working days
orange Bowl Enterprise
OkNelt•LOWL
LOWER PRESS ti0 FtER$iSC,' i9'�8
108 140 B 2 58=A
(CO 1TRACTOR} S FACT SKEET
MET•donetruetion's In.
355 4. W. 54' Street
Miatiti,orida 332
II. Prihcipa].8 t Major t. Threlkeld, President
Betty 3`o Threlkeld, Secretary
R► L. Hardegree
III. Contractor is properly licensed and insured.
IV.- Subcontractors: None
V. Experience:
This is a new corporation and has been in operation for
approximately ten months This company was previously
called Biscayne Construction Co. which contracted many
jobs with the City. The same principals operated the
new company.
MET'Construction, Inc.
The Trade. Fair of the Americas
Orange Bowl Structural Repairs
Biscayne Construction Co.
Orange Bowl 7. Water Main Changes
Orange Bowl ---Structural Repairs - Ph. I
Orange Bowl - Roll -Up Door Replacement
Parks - Hard Surface Courts (Henderson Park)
Oranc e Bowl 7. Spiral Ramp Deck Replacement -
Ph. IV
VI. NOT A MINORITY CONTRACTOR
VIII. 40 Advertisement: Mailed out by Certified Mail
32 Advertisements mailed out by Regular T•Iai1
6 contractor picked up Plans and Specifications
1 Contractor submitted bid
$110,000
205,300
$ 36,700
365,000
30,000
32,000