HomeMy WebLinkAboutR-79-0028MulOLUTro 79
A RESOLUTION A(CEj'TIN G THI' BID OF' O s tA s P •s
COR?ORAT'I0t1 IN THE AMoO O q8-8 h91. s 80,
THE t3A8E BIt) or THE P i 1P0 AI, 3 } OP ` t-i
'10?I'IIIRfl DRAItWA(xh I'RO_?EC"' %';ITH
r ►0i1I ES THEREFORE: ALLOCATED 1-i RO11 .
88‘4V,Ii C s0s BOND- FUUD"; 'WITII ADDITIONAL
rtOIJTFS ALLOCATED FOR PROJECT Awn INCIDENTAL
E;{PFNSE FROM A1'C)FE8ATD TWIN'', - AU`i HORIZ i;t'I(1
-THE CITY!°IAIdA( F:R TO i:, I�Ct1' E A CONTRACT.
WITH SAID FIRM
WHEREAS, "ealc,d bids were received December 12, 1978
r
the NORTHERN DRAINAGE ?rn TLC T E. 4 4 ; and
WHEREAT , the Cit ';auaFer reports that the il;188,491'.80
bid of I).r41n• Corporation for the
Base Bid of the Proposal.
is the lowest responsible bid and recomMei is that a 'Contract:::
•be alcarded to•said.. ftrm., and
4. '
s
WHEREAS-, the Capital In ?rovement;s Aphropriat-on
Ordinance: No. 8716, as amended', was adopted on October 26,
1��77, and ;�ion.l es a.r ' ava i l�-ib lc< Per the ni orosed arount o f -
.
the Contract, Project, Expense, and incidentals, from• the
account entitled !I c.am>too S-we'rBond Funds" as set forth
under Section II, Item -1, off said. -Ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COI.i"ITS:SION -C)F
`:11E CITYOF•t TAi,lr , FLORIDA:
Section 1. The December- 12, 1978 bid o`' D.M.P.
Corpor rtion in the proposed amount of v 188,1�91. 80 for -the
project. entitled NORTHERII DRAINAGE PROD CT--E—l411 for the Base
Bid of•the Proposal, based on •unit prices, is•herebv accepted
at- the T.>1°ice stated therein. to cover the cost of. said
Contract.
Section 2 The amount of a188,491,80 is herebi
allocated from the account entitled "Storm- Sewer G.O. Bond
"DOCUMENT/INDEX
ITEM NO,
Pund " to cover the cost offsaid Contract,
a rs, cQMMISSION
METING OF
J A N 1 81919
rmougos
r tt,10 fr t3tfl=f sf x RlfrntR.f
Section 3i The amount o.f 01134,20 IS hereby
allocated from the a{'oresaid Fund to cover the cost of
Prot?ect Expense.
Section 4. The amount is :Hereby.
allocated ``tom the aforesaid Fund cover the co:7t of
to
Incidental items As advertising, testing; laboratories,
postage.
Section ri. The City 1`1anarer is hereby authoriHed
to enter into a Contract on belay or The City of Miami
D.M.P Corporation for NORTHERN DRAINA(=E PROJECT E . 44,
Bid of the Proposal.
PASSED AND ADOPTED thiS18th
1979.
ATTEST:
:
PREPARED.AND APPROVED BY:
APPROVED AS TO FORM AND CORRECTNESS :
C ty ,,;torne V
day. of
JANTIAPY
MAURICE A. FERRE
Olt? Or �:.Fltil:'.. f isoistC7.
ffq r -o hC MEMOkAtibUM
;« Joseph Re Grassie
City Manager
Donald W. Cather
Director
artment of. 'Ublicn 140r1�8
December 195 1978 r,..r
NOTkTilti4W DRAY` Al
Resolution AWardin - Contract
•
(for Cotiitnission Meeting of
january.18, 1979)
Bids were received December 12, 1978 for the project
consisting* of 20 proposed drainage structures in
the area bounded on the north and west by the City
limits, on the east by Biscayne Bad>, and on the
south by North 36 Street, with two additional.
structures' outside this area.
As reflected in the Tabulation of Bids, the
$188,491.80 bid of D,f•1.P. Cornoration is the
lowest responsible bid for the Base Bid o'' the
Proposal.
THE DEPARTMENT OF PUBLIC WORKS AND THE CITY MANAGER
RECOMMEND ADOPTION OF THE RESOLUTION A1JARDIU!1 THE
. }�F
BID RECEIVED DECEIIBER 12, 1978 OF D.M.P. CORPORATION
IN THE AMOUNT OF $188, 91. 80 FROM THE ACCOUNT ENTITLED
"STORM SEWER G.O. BOND FUNDS"; AND AUTHORIZING THE
CITY MANAGER TO ENTER INTO A CONTRACT IN BEHALF OF
THE CITY OF MIAI.1I FOR NORTHERN DRAINAGE PROJECT E-44
JAH:hc
o1�i4 �1
� E. 11.TS
FOLLOW"
BID ICURITY
NO THtPN b AINAbt PPOJ E.44 bAtt SIDS IttetiVED
Pubic Wark
IMO fife be t€ew
i , x _.... 040a :+ i on .,_
10477 S.W. 186 Lane BB 5%
MIami,Florida 33157
Base $188 491.80
persant Construction Co, Inc,
7175-SW 8 Street Suite 209 Base $ 22.9,195,00
Miami , F1 on da 33144 BB 5%
P.O. Constructors Inca Base $205375.80
4300 SW 70 Court BB 5%
Miami,Florida 33158
A , & J Corporation Base $259,590,00
Dania, Florida 33004
Williams Paving Co Inc. Base $243,700.00
Miami ,Florida 33166
Marks Brothers Co. Not Inca Base $286,658.00
1313 N.W.'97th Ave.
Miami ,Florida 33126
BB 5%
edfliberi , 1978
Rctltivod the obovo doocribtd chock§ thii,,doy of 19
F ►R A►CCQUNTINQ +Div*, N
CRY: OP 1V AK 'OR A
REQUISITION FOR
ADVERTISEMENT FOR BIDS
b.PtIbIV 4 �..; ,.; ► •ram 4"
ACCOUNT CODE ,..
kt Bib NO. bAlt
I PREPAREb BY. i�WC�NE
ITEM DESCRIPTION
TOTAL
INCIDENTAL :
SOURCE OF FUNDS:
.1-13 br Jilltvi in by
EXPENDITURE CONTROL:
QUANTITY.
tlUANI-It r RePRt§EItita DEPATI?MER' ,I"
rtteutntmtmt§ re314 .w_-. r aNtw114
DATE DATE DATE DATE DATE DATE
\AMOUNt 404OUNT AMOUNT AMOUNT AMOUNT AMOUNT
UNIT
PRICE
APPROVED BY
BIDS To BE SECURED FOR
FOR THE DEPARTMENT OF:.
ADVERTISE ON
BIDS TO BE RECEIVED ON
DIRECTOR OF ISSUING DEPARTMENT
FUNDS AVAILABLE FOR PROJECT INVOLVED
EXPENDITURE CONTROLLER
PROJECT CODES AD CODE
WHITE GREEN PINK
{ UNM NO l(43 REv 74
(,01)11.3' TO: Nurrbaaing (O4.) — c:ily Munagvr (•ily (Jerk—!:xptnldilurL (:aatrol — Issuing i)q arlmerlt Other Affected Department
CANARY
BLUE GOLDENROD
Bid No. 78,.79=26..
ADVERTISEMENT FOR BIDS
Sealed bids for the construction of NORTHERN DRAINAGE PROF CT
.E=44,...Miami, Florida, tall be received by the City Manager and
the City Clerk of The City of Miami) Florida; not later than
2100 p.t. on the l2th day of December) 1978) in the City Clerkys
office, first floor of the Miami City Hall) 3500 Pan American
Drives Dinner Key) Miami, Florida 33133) at which time and
place they will be publicly opened and read.
The work, briefly described, includes!
Approximately 20 proposed drainage structures in the
area bounded on the North and West by the City limits,
on the East by Biscayne Bay and on the South by North
36th Street, with two additional structures outside this
area,.
These structures consist of approximately:
:
1285 linear feet of French Drain
750 linear feet of 2 foot wide Covered Ditch
235 linear feet of 15 inch Concrete Pipe
510 linear feet of 12 inch Class 23 Cast Iron Pipe
46 linear feet of 12 inch Aluminum Pipe
All bids shall be submitted in accordance with the Instructions
to Bidders and Specifications. Plans and Specifications may be
obtained from the Office of the Director, Department of Public
Works, 3332 Pan American Drive, Miami, Florida. Plans and
specifications are to be returned in good order and unmarked
within 10 days after bids have been received.
Those minority or target area contractors/small businesses
interested in submitting bids are advised to contact Contractors
Training and Development, Inc. to be provided technical assistance
in preparing bid packages. For further information call James D.
� `' � �
Thomas, Administrative Assistant, at 579-6848.
Proposal includes the time of performance and specifications
contain provisions for liquidated damages for failure to complete
the work on time.
The City Commission
in any hid, and the
readvertise
reserves the right to waive any informality
City Manager may reject any or all bids, and
y Joseph R. Grassie
City Manager
•
B�.t3,_A1ttA�1� �'�A.Cfi ��E1
F V. -The City 'Ma.h g
RRon _ :f AM1.- • NORT14ERn DRAIf3ACE PROTECT E 14 4 (13 54 51)
1?i od8O1 8C01'E
ESTIMATED'
CONSTRUCTION
COST
DATE BIDS
RECEIVED.
NUMBER OF
BIDS RECEIVED.
NAME OF LOW
:BIDDER'
AMOUNT OF
LOW BID
TOTAL FUNDS TO
BE ALLOCATED $212
This project consists of 20 proposed drainage
structure in the area bounded on the North
and Wet by the city limits on the East by
Biscayne 13ay and on the South by north 36 Street
with two additional structures outside this area.
$186,Goo +0o
December 12 1978.
six
D.M. P. Corporation
$188,1491.80 (Base Bid)
995.00
LENGTH OF TIME
ALLOWED FOR
CONSTRUCTIO__N_ Seventy working days
SOURCE OF FUNDS,Storm Sewer G.O. Bond Funds
F rrn P' i/ 'R.9 '6 /76
NORTHERN DRAIi1A0E PROJECT 8=44-
J0E NO, 8 5)451
COt4TPACT01;.' I?AC'I' .:Si!EE T
D.M, P , Corporation
10477 S+ W. 176 Lane
Miami, Florida 33157
Phone 2
II, Principals:, D, 7, Papy, Jr. - President
Virginia W.
Papy - Sec./'Tea,
III. Contractor properly licensed and insured
V, Sub -Contractors: None.
V. Experience: 9 years
Southern Drainage Project E-14.3
Manor Sanitary Sewer'.improvement
Central Drainage Project E-41
Little River C'. D. Paving Project
Robert E. Lee - Ballfield Development
3-722 3 -
$264,3514=00
wG18 580.50
- $155,178.O0
140,739,50
- $ 28,787,00
VI. Not a Minority Contractor
VII. 45 Advertisements mailed out by Certified nail
24 Advertisements trailed out by Regular Iiail
13 Contractors picked up Plans & Specifications
6 Contractors submitted bids
i
i
TABULATION OF BIDS FOR
City Manager. City Clerk '_` %
Received by the rt:, �_ : %:+�. i-lerk, City of Miami. Florida at . : t7J P. M. -.:� .�`.'
RI der
''.. vri t.._
IL.+conssd b Mnsuted c P.r'City Cod. . Metro Ord.
Bud! BondAmount
Irregularities
.504
•1 .
DESCRIPTION
TOTAL
TOTAL
8)
TOTAL
2—TOTAL.
`,SUPPORTIVE
DOCUMEN1S
FOLLOW
IRREGULARITIES LEGEND
A — a-*lo Pow.r-,oil- Attorney
IB:..
C—�1Carrected `Cunens,ons
ID._ Proposal Unsigned or improperly S.gned or No Corporate Seal
iC benprop.r Bid Bond
IN Corrected Bid
IP+eo.'9r iVoitCO J. FERIJAMDCZ
z- /Z -73
IT IS RECOMMENDED THAT A CaN?RACT /Ai Tf/E_
f l
OK
/cl. ^ )1,
B D /r rta — 9
Doran '& 113O8A ]J77
1
WyodwobdCabt PaV h
publ'ii -Works..
ID SECURITY
Jah , 1
iitibbi:R
?YPt a0 tteuo 1`Y
AmbUN '
rolt
ACCOUNtiNd
F F, ConStructi on Co
1nc.- $235,703493..-
• 1850 SW 8th Street Sulte• 303 BB. 5%
H ami,Fldrida 33135
Corporation'
,$24.1,918.83
3445 SW 8th Street Suite 206 BB 5%
Miami,Florida 33135
Marks Brothers Co Not I
1313 N.W. 97th Ave.
ic. $251,109.50
BB 5%
Miami ,Florida 33126
Williams Paving Co Inc
S254,372 45
Box 660800
BB 5%
Miami Springs, Fla 33
66
Stone Paving Co.
$308,569.80
Box 560486
BB 5;=r
Miami, Florida
Persant Construction C
Inca Bid B $89,555.97.
7175 S.W. 8th St.
BB 5°0
Received the shove deccrib:d checks this; day
FOR AQQQUNT#NQ DIVISION
Ci'OP MIAMt, FLORIDA'
R OUI $TON ifOR
.ADV k I$ MtN? FOR RI1 S
b . 'IbIV
ACCbUNT CODE
Bib NO: bAt
PP iAREb BY :.. PHONE
ITEM DESCRIPTION
TOTAL
To In, filled in by
EXPENDITURE CONTROL:
QUANTITY
UNIT
PRICE
?iUANtltir *OHM
M Ci t e
riEitUIMM€Ntb ran me
\AMOUNt AMOUNT AMOUNT
DATE
AMOUNT
AMOUNt.
AMOUNT
BIDS TO BE SECURED PCB
FOR THE DEPARTMENT OF
ADVERTISE ON
BIDS TO BE RECEIVED ON
FUNDS AVAILABLE FOR PROJECT INVOLVED
EXPENDITURE CONTROLLER
PROJECT CODE AD CODE
[;(n)Iii% To: Puff -busing (O►g,1 — City Munagt•r City !.lurk—f:.xpfntditUrr Control - Issuing Deportment — Other Affected Department
WHITE GREEN PINK CANARY BLUE GOLDENROD
i'GNM NO 1GA3 - FiEv -74
13id 10: 7879*.37
ADVERT I88ME 'JT F'OR BIDS
Sealed bids for construction or td`ZNIDWOCD,,, CdM4UNITs ...DEVELOPMENT
PAVING PROJECT PHASE:>IV will be received by the City tanager
and tie City dlerk of The City of Miami, Florida at 2.00 porn,
on the 9th day of January), 1979 in the City, Clerk's o:' 'ice)
first floor o" the Miami City Ban, 3500 Pan American Drive,
Dinner Key, Miami, Florida 33133, at which time and place
they will be publicly opened and read.
Briefly s the work required for this project Will be:
HIGH 4Ati S °u DRAINAGE
The construction of approximately one-half mile of
street within rights of way. New cor.3truction will
include rebuilding asphaltic pavement, new curbs
and/or gutters, valley cutter, sidewalk, cohered
ditch drainage systems and landscapinc~.
Bids may be offered on either or both of the following categories:
Highways and DraLnv:e. However, in order to offer a TOTAL BID,
bids must be offered on both categories.
If you have any questions, please, call Mr. feorr,e V. Campbell,
Jr.) Highway Engineer, at 57°-6865.
All bids shall be submitted in accordance with the Instructions
to Bidders and Specifications. !Tins and Specifications may be
obtained `_'roi the Office of the Director, Derartment of Public
Works, 3332 Pan American Drive, Miami, Florida. Plans and
Specifications are to be returned in good order and unmarked
within 10 days after bids have been received.
Those minority or target area contractors/small businesses
interested in submitting; bids are advised to contract Con-
tractors Training; and Development, Inc. to be provided technical
assistance in preparing; bid packages. For further information
call James D. Thomas, Administrative Assistant at 579-6848
The City Commission reserves the right to waive any informality.
in any Bid, and the Cite Manager may reject any or all Bids and
readvertise.
Proposal includes the time of performance, and Specifications
contain provisions for liquidated damages for failure to corinlete
the work on time.
In addition to these measures, Contractors and Subcontractors
will be required to comply with the provisions of Section 3
(Federal Regulations) Which require all de'reloners, contractors,
and subcontractors create feasible opportunities to employ and
train residents t e t' give Preference
in subcoritrac�s �t-t the area of pro,i �c�, and
' j 1
tiny; and purchasing of materials to businesses
located in or owned in substantial part by persons residing
in the area of the project,
No Bidder may withdraw his hid within 30 days a''ter actual date
of the opening. thereof, unless modified in Division 2 Special
Conditions of the Specifications, The estimated construction
cost: of this project is $220,000 i and is to be funded by the
Community Development Bloch 1rrant Monies 3
Joseph R. Grassie
City Mana.f;er
train residents in the area of the proaiect; and givepPreferetnce
in subcontracting and purchasing of materials to busineSSeS
located in or owned in substantial mart by persons residing
:n the area of the project:
No Bidder may withdraw his bid within 80 days after actual date
of the opening thereof3 unless modified inDivision 2 Bpe
cial
Conditions of. the 8pecif'icatiot s, The estimated oonstructiotl
cost of this project is $220,000) and is to be funded by the
Community Development Block C7rant Monies
Joseph R, Grasslie
City Manager