Loading...
HomeMy WebLinkAboutR-79-0027RESOL`UTI0 t30. y ,7 A 'RESOLUTION ACCEPTIN(• THR• COMPLETED WORK • PERIF1ORMED B' J70E RiFAI4tRTtSOtt. EC)UIPMV,NT COMPANY • AT A TOTAL COST•Ov . 106 3 04 $. 00•-PoR -THE CONVENTl0U CEIITER3PHA8E II SITE PREPAP.ATIOt1, ANI) AUTHORIZtWG A FIt3AL PAYMENT OF $10 3604, 80 WHEREAS; there exists a contract dated June 203 1978 between the City of Miami and Joe Renertson Equipment Company; and WHEREAS, the work has been satisfactorily completed s and Joe Reinertson Equipment Company has furnished the required documents certifying; that all bills for labor and materials have been paid in fu7.1in connection with the aforesaid contract; and WHEREAS, the Cityy Manar,er and the Denartment of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOi'J THEREFORE', BE IT RESOLVED By. THE COMMISSION OF THE CITY OF MIAMI, FLORIDA .Section The completed work performed by- Joe Re inertsou Equipment Company for CONVENTION CENTER, PHASE II - 'SITE PREPARATION at, a total cost of $106,048.00 is hereby approved. Section ? The proper officials of the City of Miami are hereby authorized to pay $10,6014.80 Joe Reinertson Equipment Company as full and final payment for all laor.k performed and all materials furnished in connection with CONVENTION CENTER, PHASE II SITE PREPARATION. PASSED AND ADOPTED this 18th rlav of JANUARY ; 1979. "DOCUMENT INDEX ITEM N0, L (5b PALPIC�, 0110IE, CITti' CLF PREPAH ?D- AI,ID APPROVED RY 64, ROBERT' t )RC AS5I: STRUT• CITY ATTOFUECITY D AS TO FOR MAURICE A. FERRE MAIIRICE A. FERRE, I.7 A Y 0 R L'T ire>4111111tTOMEY ,TTO, RRECTNESS;; 7 9 2 7 57i Joseph R. Crassie City Manager Donald W. Cather Director rtmentof P c Corks December 29, 1978 8=3148=D. CONVENTION CENTER ='PRASE II, SITE PREPARATIOt1 Resolution for Final Payment (for Commission Meeting January 18) 1979) Joe Reinertson Equipment Company has completed the project consisting of excavating and removing existing foundations, slabs, footings, swimming: pool, asphalt pavement; also, removing and capping Utility lines and constructing temporary fence. The location is on the north side of the Miami River between S. E. First Avenue and S. E. Second Avenue. The original contact amount was for $93,000.00, and an increase in scope was authorized by Commission Resolution No. 78--639 on October 12, 1978 in the amount of $20,000.00, increasing the contract amount to $113,000.00. The completed contract amount is $106,048.00, and it was completed on time. It is now in order for the Commission to accept the completed, work and authorize final r,ayment, after all conditions are met. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHORIZING A FINAL PAYMENT OF $10, 604 80 TO TOE REINERTSON EOUIPi1ENT COMPANY FOR CONVENTION CENTER PHASE II SITE PREPARATION. uB.7 NAME_ CONTRA TOR • JOB SCOE REASON FOR WORT{ SOURCE. Or _FUNDS PROJECT HISTORY CONTRACT TIME STARTED CONTRACT TIME SCHEDULED COMPLETION DATE ACTUAL COMPLETION DATE BID AMOUNT CONTRACT FINAL COST CURRENT ITEM FOR CONSIDERATION tINAL_ CONS`P UO t0 ...FAG .., SHLI '1 -. FQR THE CITY. MANAGER_ ConventionCenter,-phase II.,Site preparation Joe Reinertson Equipment Co► Rm, 48D ExcaVate arid remove existing foundationsSlabs RemoveEand cap utility lines and construc, etc. footin s st�rimmin, pool i a.s hard construct temporary fence. Preliminary preparations necessary prior to construction of new convention center U. S. Dept. of Commerce EDA Local. Public Works Grant, Bids Received: 6/19/78 Contract Awarded: 6/22/78 �� �c.axistruction :_irTeet:�� 6/28/78 60 working days plus 10 working days authorized by Resolution #78-639 for extra work,.- $106,048 (Includes $20;000 additional funds authorized by Resolution 178-639 for extra work.) Resolution to accept completed work and authorize final payment to the contractor,