HomeMy WebLinkAboutR-79-0027RESOL`UTI0 t30. y ,7
A 'RESOLUTION ACCEPTIN(• THR• COMPLETED WORK •
PERIF1ORMED B' J70E RiFAI4tRTtSOtt. EC)UIPMV,NT COMPANY
• AT A TOTAL COST•Ov . 106 3 04 $. 00•-PoR -THE
CONVENTl0U CEIITER3PHA8E II SITE PREPAP.ATIOt1,
ANI) AUTHORIZtWG A FIt3AL PAYMENT OF $10 3604, 80
WHEREAS; there exists a contract dated June 203
1978 between the City of Miami and Joe Renertson
Equipment Company; and
WHEREAS, the work has been satisfactorily completed s
and Joe Reinertson Equipment Company has furnished the
required documents certifying; that all bills for labor
and materials have been paid in fu7.1in connection with
the aforesaid contract; and
WHEREAS, the Cityy Manar,er and the Denartment of
Public Works
recommend
that the completed work be accepted
and final payment made to the contractor;
NOi'J THEREFORE', BE IT RESOLVED By. THE COMMISSION
OF THE CITY OF MIAMI, FLORIDA
.Section
The completed work performed by- Joe
Re inertsou Equipment Company for CONVENTION CENTER, PHASE II -
'SITE PREPARATION at, a total cost of $106,048.00 is hereby
approved.
Section ? The proper officials of the City of
Miami are hereby authorized to pay $10,6014.80
Joe
Reinertson Equipment Company as full and final payment for
all laor.k performed and all materials furnished in connection
with CONVENTION CENTER, PHASE II SITE PREPARATION.
PASSED AND ADOPTED this 18th rlav of JANUARY ; 1979.
"DOCUMENT INDEX
ITEM N0,
L
(5b
PALPIC�, 0110IE, CITti' CLF
PREPAH ?D- AI,ID APPROVED RY
64,
ROBERT' t )RC
AS5I: STRUT• CITY ATTOFUECITY
D AS TO FOR
MAURICE A. FERRE
MAIIRICE A. FERRE, I.7 A Y 0 R
L'T
ire>4111111tTOMEY
,TTO,
RRECTNESS;;
7 9
2 7
57i
Joseph R. Crassie
City Manager
Donald W. Cather
Director
rtmentof P c Corks
December 29, 1978 8=3148=D.
CONVENTION CENTER ='PRASE II,
SITE PREPARATIOt1 Resolution
for Final Payment
(for Commission Meeting
January 18) 1979)
Joe Reinertson Equipment Company has completed the project
consisting of excavating and removing existing foundations,
slabs, footings, swimming: pool, asphalt pavement; also,
removing and capping Utility lines and constructing
temporary fence. The location is on the north side of
the Miami River between S. E. First Avenue and S. E. Second
Avenue. The original contact amount was for $93,000.00,
and an increase in scope was authorized by Commission
Resolution No. 78--639 on October 12, 1978 in the amount
of $20,000.00, increasing the contract amount to $113,000.00.
The completed contract amount is $106,048.00, and it was
completed on time.
It is now in order for the Commission to accept the completed,
work and authorize final r,ayment, after all conditions are
met.
THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF
A RESOLUTION ACCEPTING THE COMPLETED WORK AND AUTHORIZING
A FINAL PAYMENT OF $10, 604 80 TO TOE REINERTSON EOUIPi1ENT
COMPANY FOR CONVENTION CENTER PHASE II SITE PREPARATION.
uB.7 NAME_
CONTRA TOR •
JOB SCOE
REASON
FOR WORT{
SOURCE.
Or _FUNDS
PROJECT
HISTORY
CONTRACT
TIME
STARTED
CONTRACT
TIME
SCHEDULED
COMPLETION
DATE
ACTUAL
COMPLETION
DATE
BID AMOUNT
CONTRACT
FINAL COST
CURRENT
ITEM FOR
CONSIDERATION
tINAL_ CONS`P UO t0 ...FAG .., SHLI '1 -.
FQR THE CITY. MANAGER_
ConventionCenter,-phase II.,Site preparation
Joe Reinertson Equipment Co►
Rm, 48D
ExcaVate arid remove existing foundationsSlabs
RemoveEand cap utility lines and construc, etc.
footin s st�rimmin, pool i a.s hard construct temporary
fence.
Preliminary preparations necessary prior to
construction of new convention center
U. S. Dept. of Commerce EDA Local. Public Works
Grant,
Bids Received: 6/19/78
Contract Awarded: 6/22/78
�� �c.axistruction :_irTeet:��
6/28/78
60 working days plus 10 working days authorized by
Resolution #78-639 for extra work,.-
$106,048 (Includes $20;000 additional funds
authorized by Resolution 178-639 for
extra work.)
Resolution to accept completed work and authorize
final payment to the contractor,