HomeMy WebLinkAboutR-79-0234/./ RESOLUTION NO. 7 9 - 3 A RESOLUTION ACCEPTING THE Cnr1PLETED WORK PERFORMED RV NET CONSTRUCTTnN, INC. AT A TOTAL COST OF $2 3 3, 806.00 T?fR THE ORANGE BOWL STRUICTURAL REPAIRS - 1070; AND AUTHORI: Tf1G A FINAL PA`''1FNT nF $25,330.60 WHEREAS, there exists a contract dated March 31, 1978; and !'rIIEREAS, the City Commission by Resolution No. 78-424 passed on June 22, 1978 increased the scone of the contract in an amount not to exceed $07,g66.00; and WHEREAS, the work has been satis"actorily completed, and NET Construction, Inc. has furnished the required documents certifying that all bills for labor and materials have been paid in full iri connection with the a"oresaid contract; and WHEREAS, the City rlaria.Eer and the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, TIiEREnORE, RE IT RESOLVED SV TH'!E CO=0i ON DP THE CITY OF °1IAMI, FLORIDA: "DOCUMENT INDEX Section 1. The comnleted work r)e k, —L- Construction, Inc. for the ORANGE Rn;•JL STRUCTIJ^AL h:EPAIi'.:' - 1978 at a total cost of $P5 ;,30 .00 is hereby approved. Section 2. Th('. proper officials of the Cit';r of are hereby authorised to pa,! $2 ,, R 30.60 to r1E''' Construction, Inc. as ''ull and final payment for all work performed and all materials furnished in connection with the ORANGE BOWL STRUCTURAL REPAIRS - 1'079. PASSEL) AND ADOPTED this 27Nn day of MARCH , 1979. ATTEST: 1RTCE A_ FERRE r1AIJR r('F A. r'F.nRE, r4 A '' O R CORRECTNESS: 30 Joseph R. Grassie City Manager Donald W. ether Director Deiiartment of Public Works ?larch 7, 1979 P-278 ORANGE BOWL STRUCTURAL REPAIRS 1978 - Resolution for Final Payment (For Commission fleeting of March 22, 1979) MET Construction, Inc. has completed the project con- sisti_nr of the removal and replacement of concrete decking and joicts in the llnper and lower docks of the Orange low' :'.t lditlm. Thy' oriE na1 contra:;t amount was .,;?f)5, 3U0.00, but the C1.t. COmmiss'ic!i, h'• Prsolution r s.:ed on ,7 in(. 'S, 1T+70, Increased the SCOPE' on the contract ..:i an amou'lt not to exceed $U 7 ,o6('. ri'J11.3 mop€ v ha: been used tc, i'r'nlace as many of the additional deteriorated members as possible. The completed contra ;t. amount. is 1�5 , 06.00, and it was completed on time. It is now in order for the Commission to accept the completed work and authorize Final payment, after all conditions art met. THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION OF A RE:7nLUTIn J ACCEPTING THE COTPTLETED WORK AND AUTHORII'J'1 A FI'JAL PAYMENT OF 25, �30.60 FOR THE ORANGE BOWL STRUCTURAL REPAIRS - 1978. J H:hc "SUPPOTIVE DOCU ►„ ENTS FO LLOW" �79-:'>4 3B FINAL CONSTRUCTION FACT SHEET FOR THE CITY MI AGER JOB NAME Orange Bowl Structural Repairs - 1978 - B-2738 CONTRACTOR MET Construction, Inc. JOB SCOPE Remove and replace concrete decking and joists in the upper and lower decks of the Orange Bowl Stadium. REASON FOR WORK SOURCE OF FUNDS Deteriorated structural members Orange Bowl Enterprise Fund PROJECT Bids Received: 3/14/78 HISTORY Contract Awarded: 3/23/78 Preconstruction Meeting: 3/29/78. CONTRACT TIME STARTED 4/3/78 CONTRACT TII^.E Time not specified SCHEDULED COMPLETION DATE Work to be completed by 8/4/78 ACTUAL COMPLETION DATE 8/1/78 BID AMOUNT CONTRACT FINAL COST $ 205,340.00 (Commission Resolution 78-424 increased scope of contract in an amount not to exceed 1:;47,966.00) $ 253,306.00 CURRENT ITEM FCR CONSIDERATION Resolution to accept completed work and authorize final payment to the contractor. 79 :2,3��