RESOLUTION NO. 7 9 - 3
A RESOLUTION ACCEPTING THE Cnr1PLETED WORK
PERFORMED RV NET CONSTRUCTTnN, INC. AT A
TOTAL COST OF $2 3 3, 806.00 T?fR THE ORANGE
BOWL STRUICTURAL REPAIRS - 1070; AND
AUTHORI: Tf1G A FINAL PA`''1FNT nF $25,330.60
WHEREAS, there exists a contract dated March 31,
1978; and
!'rIIEREAS, the City Commission by Resolution No. 78-424
passed on June 22, 1978 increased the scone of the contract
in an amount not to exceed $07,g66.00; and
WHEREAS, the work has been satis"actorily completed,
and NET Construction, Inc. has furnished the required documents
certifying that all bills for labor and materials have been
paid in full iri connection with the a"oresaid contract; and
WHEREAS, the City rlaria.Eer and the Department of Public
Works recommend that the completed work be accepted and final
payment made to the contractor;
NOW, TIiEREnORE, RE IT RESOLVED SV TH'!E CO=0i ON DP
THE CITY OF °1IAMI, FLORIDA:
"DOCUMENT INDEX
Section 1. The comnleted work r)e k, —L-
Construction, Inc. for the ORANGE Rn;•JL STRUCTIJ^AL h:EPAIi'.:' -
1978 at a total cost of $P5 ;,30 .00 is hereby approved.
Section 2. Th('. proper officials of the Cit';r of
are hereby authorised to pa,! $2 ,, R 30.60 to r1E''' Construction,
Inc. as ''ull and final payment for all work performed and all
materials furnished in connection with the ORANGE BOWL
STRUCTURAL REPAIRS - 1'079.
PASSEL) AND ADOPTED this 27Nn day of MARCH , 1979.
ATTEST:
1RTCE A_ FERRE
r1AIJR r('F A. r'F.nRE, r4 A '' O R
CORRECTNESS:
30
Joseph R. Grassie
City Manager
Donald W. ether
Director
Deiiartment of Public Works
?larch 7, 1979 P-278
ORANGE BOWL STRUCTURAL REPAIRS
1978 - Resolution for Final
Payment
(For Commission fleeting of
March 22, 1979)
MET Construction, Inc. has completed the project con-
sisti_nr of the removal and replacement of concrete
decking and joicts in the llnper and lower docks of the
Orange low' :'.t lditlm. Thy' oriE na1 contra:;t amount
was .,;?f)5, 3U0.00, but the C1.t. COmmiss'ic!i, h'• Prsolution
r s.:ed on ,7 in(. 'S, 1T+70, Increased the
SCOPE' on the contract ..:i an amou'lt not to exceed
$U 7 ,o6('. ri'J11.3 mop€ v ha: been used tc, i'r'nlace as
many of the additional deteriorated members as possible.
The completed contra ;t. amount. is 1�5 , 06.00, and it
was completed on time.
It is now in order for the Commission to accept the
completed work and authorize Final payment, after all
conditions art met.
THE DEPARTMENT OF PUBLIC WORKS RECOMMENDS THE ADOPTION
OF A RE:7nLUTIn J ACCEPTING THE COTPTLETED WORK AND
AUTHORII'J'1 A FI'JAL PAYMENT OF 25, �30.60 FOR THE
ORANGE BOWL STRUCTURAL REPAIRS - 1978.
J H:hc
"SUPPOTIVE
DOCU ►„ ENTS
FO LLOW"
�79-:'>4
3B
FINAL CONSTRUCTION FACT SHEET
FOR THE CITY MI AGER
JOB NAME Orange Bowl Structural Repairs - 1978 - B-2738
CONTRACTOR MET Construction, Inc.
JOB SCOPE Remove and replace concrete decking and joists in
the upper and lower decks of the Orange Bowl
Stadium.
REASON
FOR WORK
SOURCE OF
FUNDS
Deteriorated structural members
Orange Bowl Enterprise Fund
PROJECT Bids Received: 3/14/78
HISTORY Contract Awarded: 3/23/78
Preconstruction Meeting: 3/29/78.
CONTRACT
TIME
STARTED 4/3/78
CONTRACT
TII^.E Time not specified
SCHEDULED
COMPLETION
DATE Work to be completed by 8/4/78
ACTUAL
COMPLETION
DATE 8/1/78
BID AMOUNT
CONTRACT
FINAL COST
$ 205,340.00 (Commission Resolution 78-424 increased
scope of contract in an amount not to
exceed 1:;47,966.00)
$ 253,306.00
CURRENT
ITEM FCR
CONSIDERATION Resolution to accept completed work and authorize
final payment to the contractor.
79 :2,3��